Hydraulic & industrial hose supplier in Poland

Indus Hydraulics ships hydraulic hose, fittings, valves and industrial hose from Jebel Ali to Gdańsk by sea through Suez and round the Skaw in 26–34 days, with Gdynia and Szczecin where the berth suits, Koper and road for Kraków and Silesia in 22–30 days, and air into Warsaw in 2–4 days. Gdańsk takes mainline calls, so a container arrives without a feeder transhipment. Silesian and Lubin mining duty is abrasion, dust and water-based emulsion before pressure, and we specify against the duty rather than the catalogue line.

Typical transit
Typically 26–34 days by sea to Gdańsk · 22–30 days via Koper and road for Kraków and Silesia · 2–4 days by air into Warsaw
Freight
Sea freight from Jebel Ali through Suez and round the Skaw to Gdańsk · Gdynia and Szczecin where the berth or the inland leg suits · Air freight into Warsaw where the schedule is tighter
Incoterms 2020
CIF Gdańsk · DAP to the buyer’s site · FOB Jebel Ali · EXW Dubai for a nominated forwarder
Documentation
CE marking and the PED declaration where the assembly is above threshold · REACH position on the elastomer compounds · Certificate of Origin, Dubai Chamber attested · EU customs entry raised by the importer
Fig. 01 · Export lane DXB → PLMercator · WGS 84
CZECHIAGDAŃSK · PORTGDYNIASZCZECINWARSAWPOZNAŃWROCŁAWKATOWICEKRAKÓWLUBLIN14°E16°E18°E20°E22°E24°E50°N52°N54°NN100 KMSEA · SUEZ · 3,410 KM · FROM JEBEL ALI · DXB
Port of entryDelivery citysea · suez corridor from JEBEL ALI · DXB
Origin
Jebel Ali · Dubai
Primary mode
Sea, via Suez
Port of entry
Gdańsk
Transit
26–34 days
Quoted in
EUR
Docs prepared
Before the vessel sails
Warehouse aisle with racked reels of hydraulic hose on one side and bins of steel hose fittings and adapters on the other

01 · Stock

Stock held in Dubai, not drop-shipped from a factory queue.

Technician in safety glasses crimping a steel fitting onto a hydraulic hose, tagged assemblies and a pressure-test cabinet behind

02 · Assembly

Assemblies crimped and pressure-tested before they are packed.

Export documents and certificates fanned out on a desk beside a rubber stamp, a pen and a hydraulic hose fitting

03 · Documents

Conformity set for Poland prepared while the order is picked.

Flatbed trailer loaded with shrink-wrapped hydraulic hose coils and cartons, strapped down at a warehouse yard gate

04 · Dispatch

One consignment, one set of documents, tracking on dispatch.

Catalogue · 21 clusters · 289 ranges

What we supply to Poland

Browse the full catalogue

Everything below ships from the same Dubai warehouse, so a mixed order travels as one consignment under one set of documents. Open any card for its full list of ranges, or follow a heading through to specifications and an RFQ.

Hydraulic hose, fittings and adapters — wire-braid, spiral, compact and thermoplastic hose, crimp fittings and ferrules, SAE J518 flanges, quick couplers, and DIN 2353, BSP, JIC 37°, ORFS, metric and NPT thread forms. Carbon steel and SS316L.

Show all 77 Hoses & Fittings ranges

Industrial hoses for air, water, food, oil, chemical, steam and abrasive applications. Own-brand Indus rubber and PVC lines alongside engineered metallic and PTFE hose assemblies.

Shackles, hooks, lifting chain, wire rope, slings, hoists and blocks for lifting and rigging — each size under an Indus part number, with the working load limit wherever the manufacturer rates it. Supplied from Dubai with the manufacturer's test certificate.

Wellhead, frac, and process oilfield valves — ball, gate, check, plug, choke, globe, butterfly, surface safety (SSV/ESD), pressure relief, instrumentation. API 6A / 6D / 16C, sour and standard service.

WECO frac iron, integral fittings, hammer unions, swivel joints, manifolds, API 6A flanges, wellhead systems, and surface test trees for upstream oil and gas. 1K to 20K psi, sour and standard service. FMC / Cameron / SPM / Anson / NOV / Stream-Flo / Indus.

DEMCO resilient-seated butterfly valves from 2″ to 36″ with actuators, gear operators and handles, Victaulic grooved butterfly valves, industrial and high-pressure hydraulic ball valves, and Yuken CETOP 3 solenoid directional, relief and modular valves.

Annular and ram blowout preventers built to the Hydril GK and Cameron U patterns, ram blocks, control units, choke & kill manifolds, diverters, drilling spools and BOP spares for onshore and offshore drilling, with sour-service (NACE MR0175) construction.

Oilfield instrumentation & controls — data acquisition, flowmeters (magnetic / turbine / Coriolis), pressure sensors, gauges, thermometers, AC/DC converters, VFD systems, ex-proof electrical panels.

Surface well-testing packages — 3-phase separators, MPFM systems, surge tanks, KO drums, flare stacks, test pumps, sand filters, ESD panels, data headers, piping packages.

Frac fleet equipment — pumpers up to 3,000 HP, transfer pumps, missiles, sand silos, blenders, hydration units, LAS, data vans, and frac tanks.

Enerpac torque wrenches, bolt tensioners, flange tools, jacks, pullers, presses and cutters, Stanley hydraulic power tools and Pierce winches, listed by series with every model number.

Export quote · PL

Send the part list for Poland

Part numbers if you have them; bore, thread and pressure if you do not. A photo of the failed part is usually enough.

One line per item. Quantities and lengths help us quote from stock.

Drag and drop, or

PDF · JPG · PNG · HEIC · STEP · DWG — up to 25 MB each, 6 files

0 attachments ready

Standards

Standards we supply and certify against for Poland

StandardTypesApplies to
EN 8531SN · 2SNWire-braid hydraulic hose
EN 8564SP · 4SHSpiral-wire hydraulic hose
EN 8571SC · 2SCCompact wire-braid hose
SAE J517100R1 · R2 · R12 · R13 · R15SAE hydraulic hose series
ISO 18752Grades A–DPerformance-based hose classification
API 16CChoke & killWell control flexible lines
API 7KRotary & vibratorDrilling hose
API 6APSL 1–4Wellhead equipment
DIN 2353L · S seriesBite-type tube couplings
ISO 8434-124° coneMetric tube connections
ISO 6162 / 12151Code 61 · 62SAE flange and hose connections
EN 14420-5ClampedIndustrial hose couplings
NACE MR0175ISO 15156Sour-service materials
ISO 9001:2015CertifiedQuality management system

Customs

Tariff lines we declare under

  • 4009.22Rubber tube, reinforced with metal, with fittingsHydraulic hose assemblies
  • 4009.42Rubber tube, reinforced with other materials, with fittingsIndustrial hose assemblies
  • 7307.91Flanges, iron or steelSAE and API flanges
  • 7307.99Tube and pipe fittings, iron or steelAdapters, nipples, couplings
  • 8481.80Taps, cocks, valves and similar appliancesBall, gate, butterfly, needle
  • 8413.60Rotary positive displacement pumpsGear and vane pumps
  • 8412.21Hydraulic power engines, linear actingCylinders
  • 3403.99Lubricating preparationsGreases, pastes, compounds

Classification is confirmed line by line at quotation. This is the set most consignments to Poland are declared under.

Freight

Three ways in, priced per shipment

Sea, FCL26–34 days
Jebel Ali to Gdańsk, via SuezDefault for most orders
Air freight2–4 days
DXB to WAWWhen the line is down
Sea via the Adriatic22–30 days
Koper, then road for the southKraków and the Silesian belt

Sequence

How an order to Poland works

  1. 01Send the part numbers, or the bore, thread and pressure if you do not have them. A photo of the failed part is usually enough.
  2. 02We quote in EUR against real stock, with the Incoterm stated on the Estimate rather than assumed.
  3. 03For mining duty the abrasion and dust specification is confirmed rather than the pressure rating alone, and the CE declaration is prepared where the assembly is above threshold.
  4. 04Goods sail from Jebel Ali through Suez and round the Skaw to Gdańsk, and you get the paperwork and tracking together.

Industries

Who we supply in Poland

Delivery coverage

Cities and sites we deliver to in Poland

DAP deliveries go to the site gate. Coordinates are given because project sites are easier to name that way than by address.

16 locations listed

  • Gdańsk

    Pomerania

  • Gdynia

    Pomerania

  • Szczecin

    West Pomerania

  • Warsaw

    Masovia

  • Łódź

    Łódź

  • Poznań

    Greater Poland

  • Wrocław

    Lower Silesia

  • Katowice

    Silesia

  • Gliwice

    Silesia

  • Rybnik

    Silesia

  • Kraków

    Lesser Poland

  • Bełchatów

    Łódź

  • Lublin

    Lublin

  • Płock

    Masovia

  • Legnica

    Lower Silesia

  • Lubin

    Lower Silesia

Questions we get asked

Supplying Poland, in detail

01

Does a container to Gdańsk tranship on the way from Dubai?

Not at a Baltic feeder hub. Gdańsk takes mainline calls rather than feeders, so an FCL container from Jebel Ali reaches Poland without the transhipment wait the smaller Baltic ports add, typically 26–34 days from dispatch. That is why Gdańsk works as the gate for the wider region. Gdynia and Szczecin are used where the berth or the inland leg suits the delivery better.

02

What should we tell you about a Silesian longwall application?

The duty first: the fluid, the cycle rate, the bend radius in the installation and how abrasive the environment is. Underground coal is abrasion and dust before it is pressure, so cover material and cycle life decide the service interval more than the burst rating does. With that we confirm an abrasion and dust specification at quotation rather than matching bore and pressure from a catalogue.

03

Our roof supports run on water emulsion — does that change the fittings?

Yes, and it is the first fact we need. Mineral oil leaves a film that protects steel from the inside; a high-water-content emulsion does not, so a fitting specified for oil service starts corroding where nobody can see it. Fitting material, plating and seal compounds have to suit the fluid as well as the pressure, and on roof supports a corroded fitting fails suddenly.

04

Is Koper ever faster than Gdańsk for Kraków or Katowice?

Sometimes. Koper is a shorter sea leg out of Suez followed by a longer road move, about 22–30 days to the south of Poland, against 26–34 days into Gdańsk before the inland leg. For Kraków and the Silesian belt the two can be close, so we compare them against the delivery town at quotation rather than assuming the home port.

05

Is a PED declaration the only conformity paper for a Polish mine order?

Not always, so we state it per order. Above the pressure-volume threshold in PED 2014/68/EU the declaration of conformity is issued by us as the assembler and travels with the goods; below it, sound engineering practice applies and there is no CE mark. For mining service we add the abrasion and dust specification at quotation. Any further document your mine names, we confirm at quotation.

06

Do you supply hydraulics for the copper mines and smelters around Lubin and Głogów?

Yes — hose assemblies, fittings, adapters and valves for underground loaders, drill rigs and roof bolters, and high-force cylinder and servo-valve spares for smelter and processing plant. Copper-belt duty is heat, abrasion and dust, so we specify covers and compounds to it. Lower Silesia is usually served through Gdańsk or Szczecin, with DAP delivery to the mine or plant.

07

Do you supply hose and valves for Płock and Gdańsk refinery turnarounds?

Yes — industrial hose, hose assemblies, valves and fittings specified against the medium, temperature and pressure of each stream. Because sea freight to Gdańsk runs 26–34 days, a turnaround list is best sent well before the shutdown window so it can travel as one consignment, with air freight into Warsaw for late additions. The PED declaration is prepared where an assembly is above threshold.

08

Which port should a delivery to Poznań or Wrocław come through?

Usually Gdańsk, with Szczecin where the inland leg to western Poland is shorter, and Koper where a southern delivery point makes the Adriatic competitive. Once the importer has entered the goods into free circulation through Polish Customs, the road leg to Poznań, Wrocław or Łódź is domestic movement, priced with the order on DAP terms.

09

Can hose sets for Bełchatów and Turów excavators come labelled by position?

Yes. Bucket-wheel excavators, spreaders, conveyors and dozers in open-cast lignite work in dust, mud and frost, so we build assemblies to length with abrasion-resistant covers and low-temperature compounds, cap them and label each one to its position on the machine. Send the machine and circuit, or the old assembly’s markings, and we quote the set rather than the single line.

10

Can you match the make of wellhead already installed on a Polish gas well?

Usually, yes. For onshore gas and oil production in the Polish Lowlands and the Carpathian foreland we supply TechnipFMC, Cameron (SLB), SPM, Anson, Stream-Flo and WOM equipment — gate valves, chokes, flow iron and wellhead parts built to API 6A. Send the nameplate data, pressure class, size and service from the installed equipment, and we confirm the match and the document set at quotation.

11

Do you supply lay flat hose for mine dewatering in Poland?

Yes. TPU and heavy-duty NBR lay flat hose goes to Poland for mine and construction dewatering, with rigid-helix suction hose, high-pressure couplings for pumped mains, and slurry supply and drag hose for agricultural contractors. Hose ships from Dubai as bulk coils up to 400 m or as made-up assemblies with couplings fitted, with the size table and pressure rating for each bore.

From the blog

Guides for buyers in Poland

Next step

Shipping to Poland?

Send the part numbers, or the bore, thread and pressure if you do not have them. We quote from real stock, in EUR, with the Incoterm stated rather than assumed.

Plant-down? Call +971 52 2477942 — 24/7

Quick enquiry

RFQ · PL

No account needed. We reply from the Dubai export desk.

Other export markets · 126 destinations

We run the same lane from Dubai to 125 other markets

All export markets