How to choose
Build the package from the well's rates and pressure
A well-test package is sized from the expected wellhead pressure, the oil, gas and water rates, H2S and CO2 content, and sand. These set the separator's pressure rating and size, the piping class, the flare capacity and whether a sand filter is needed. For offshore work, skids are built for lifting and transport. Send the well data and the test programme.





