Skip to content
+971 52 2477942
Lane DXB → SISlovenija

Export from Dubai

SI

Hydraulic & industrial hose supplier in Slovenia

Indus Hydraulics ships hydraulic, industrial and oilfield equipment from Jebel Ali through Suez and up the Adriatic to Koper in typically 17–23 days, to Trieste where the berth suits, and by air into Ljubljana with a connection in 2–4 days, with a Dubai Chamber-attested Certificate of Origin, a PED declaration above threshold and our REACH position on the compounds. Koper is the shortest sea route from Suez into central Europe. Slovenian industry is component, appliance and machinery makers who need a specification that does not change between orders.

Typical transit
Typically 17–23 days by sea from dispatch
Freight
Sea freight from Jebel Ali through Suez and up the Adriatic to Koper · Trieste where the berth suits · Air freight into Ljubljana where the schedule is tighter
Incoterms 2020
CIF Koper · DAP to the buyer’s site · FOB Jebel Ali · EXW Dubai for a nominated forwarder
Documentation
CE marking and the PED declaration where the assembly is above threshold · REACH position on the elastomer compounds · Certificate of Origin, Dubai Chamber attested · EU customs entry raised by the importer
Fig. 01 · Export lane DXB → SIMercator · WGS 84
KOPER · PORTLJUBLJANAMARIBORCELJEKRANJNOVO MESTONOVA GORICA14°E15°E16°E46°N47°NN50 KMSEA · SUEZ · 8,170 KM · FROM JEBEL ALI · DXB
Port of entryDelivery citysea · suez corridor from JEBEL ALI · DXB
Origin
Jebel Ali · Dubai
Primary mode
Sea, via Suez
Port of entry
Koper
Transit
17–23 days
Quoted in
EUR
Docs prepared
Before the vessel sails
Warehouse aisle with racked reels of hydraulic hose on one side and bins of steel hose fittings and adapters on the other

01 · Stock

Stock held in Dubai, not drop-shipped from a factory queue.

Technician in safety glasses crimping a steel fitting onto a hydraulic hose, tagged assemblies and a pressure-test cabinet behind

02 · Assembly

Assemblies crimped and pressure-tested before they are packed.

Export documents and certificates fanned out on a desk beside a rubber stamp, a pen and a hydraulic hose fitting

03 · Documents

Conformity set for Slovenia prepared while the order is picked.

Flatbed trailer loaded with shrink-wrapped hydraulic hose coils and cartons, strapped down at a warehouse yard gate

04 · Dispatch

One consignment, one set of documents, tracking on dispatch.

Catalogue · 21 clusters · 289 ranges

What we supply to Slovenia

Browse the full catalogue

Everything below ships from the same Dubai warehouse, so a mixed order travels as one consignment under one set of documents. Open any card for its full list of ranges, or follow a heading through to specifications and an RFQ.

Hydraulic hose, fittings and adapters — wire-braid, spiral, compact and thermoplastic hose, crimp fittings and ferrules, SAE J518 flanges, quick couplers, and DIN 2353, BSP, JIC 37°, ORFS, metric and NPT thread forms. Carbon steel and SS316L.

Show all 77 Hoses & Fittings ranges

Industrial hoses for air, water, food, oil, chemical, steam and abrasive applications. Own-brand Indus rubber and PVC lines alongside engineered metallic and PTFE hose assemblies.

Shackles, hooks, lifting chain, wire rope, slings, hoists and blocks for lifting and rigging — each size under an Indus part number, with the working load limit wherever the manufacturer rates it. Supplied from Dubai with the manufacturer's test certificate.

Wellhead, frac, and process oilfield valves — ball, gate, check, plug, choke, globe, butterfly, surface safety (SSV/ESD), pressure relief, instrumentation. API 6A / 6D / 16C, sour and standard service.

WECO frac iron, integral fittings, hammer unions, swivel joints, manifolds, API 6A flanges, wellhead systems, and surface test trees for upstream oil and gas. 1K to 20K psi, sour and standard service. FMC / Cameron / SPM / Anson / NOV / Stream-Flo / Indus.

DEMCO resilient-seated butterfly valves from 2″ to 36″ with actuators, gear operators and handles, Victaulic grooved butterfly valves, industrial and high-pressure hydraulic ball valves, and Yuken CETOP 3 solenoid directional, relief and modular valves.

Annular and ram blowout preventers built to the Hydril GK and Cameron U patterns, ram blocks, control units, choke & kill manifolds, diverters, drilling spools and BOP spares for onshore and offshore drilling, with sour-service (NACE MR0175) construction.

Oilfield instrumentation & controls — data acquisition, flowmeters (magnetic / turbine / Coriolis), pressure sensors, gauges, thermometers, AC/DC converters, VFD systems, ex-proof electrical panels.

Surface well-testing packages — 3-phase separators, MPFM systems, surge tanks, KO drums, flare stacks, test pumps, sand filters, ESD panels, data headers, piping packages.

Frac fleet equipment — pumpers up to 3,000 HP, transfer pumps, missiles, sand silos, blenders, hydration units, LAS, data vans, and frac tanks.

Enerpac torque wrenches, bolt tensioners, flange tools, jacks, pullers, presses and cutters, Stanley hydraulic power tools and Pierce winches, listed by series with every model number.

Export quote · SI

Send the part list for Slovenia

Part numbers if you have them; bore, thread and pressure if you do not. A photo of the failed part is usually enough.

One line per item. Quantities and lengths help us quote from stock.

Drag and drop, or

PDF · JPG · PNG · HEIC · STEP · DWG — up to 25 MB each, 6 files

0 attachments ready

Standards

Standards we supply and certify against for Slovenia

StandardTypesApplies to
EN 8531SN · 2SNWire-braid hydraulic hose
EN 8564SP · 4SHSpiral-wire hydraulic hose
EN 8571SC · 2SCCompact wire-braid hose
SAE J517100R1 · R2 · R12 · R13 · R15SAE hydraulic hose series
ISO 18752Grades A–DPerformance-based hose classification
API 16CChoke & killWell control flexible lines
API 7KRotary & vibratorDrilling hose
API 6APSL 1–4Wellhead equipment
DIN 2353L · S seriesBite-type tube couplings
ISO 8434-124° coneMetric tube connections
ISO 6162 / 12151Code 61 · 62SAE flange and hose connections
EN 14420-5ClampedIndustrial hose couplings
NACE MR0175ISO 15156Sour-service materials
ISO 9001:2015CertifiedQuality management system

Customs

Tariff lines we declare under

  • 4009.22Rubber tube, reinforced with metal, with fittingsHydraulic hose assemblies
  • 4009.42Rubber tube, reinforced with other materials, with fittingsIndustrial hose assemblies
  • 7307.91Flanges, iron or steelSAE and API flanges
  • 7307.99Tube and pipe fittings, iron or steelAdapters, nipples, couplings
  • 8481.80Taps, cocks, valves and similar appliancesBall, gate, butterfly, needle
  • 8413.60Rotary positive displacement pumpsGear and vane pumps
  • 8412.21Hydraulic power engines, linear actingCylinders
  • 3403.99Lubricating preparationsGreases, pastes, compounds

Classification is confirmed line by line at quotation. This is the set most consignments to Slovenia are declared under.

Freight

Three ways in, priced per shipment

Sea, FCL17–23 days
Jebel Ali to Koper, via SuezDefault for most orders
Air freight2–4 days
DXB to LJU, with a connectionWhen the line is down
Sea, LCL23–31 days
Consolidated, with transhipmentSmall mixed orders

Sequence

How an order to Slovenia works

  1. 01Send the part numbers, or the bore, thread and pressure if you do not have them. A photo of the failed part is usually enough.
  2. 02We quote in EUR against real stock, with the Incoterm stated on the Estimate rather than assumed.
  3. 03Whether Koper is the destination or the gate is settled first, because a consignment continuing inland is quoted to the delivery address rather than the quay.
  4. 04Goods sail from Jebel Ali through Suez to Koper, and you get the paperwork and tracking together.

Industries

Who we supply in Slovenia

Delivery coverage

Cities and sites we deliver to in Slovenia

DAP deliveries go to the site gate. Coordinates are given because project sites are easier to name that way than by address.

12 locations listed

  • Koper

    Coastal–Karst

  • Ljubljana

    Central Slovenia

  • Maribor

    Drava

  • Celje

    Savinja

  • Kranj

    Upper Carniola

  • Velenje

    Savinja

  • Novo Mesto

    Southeast Slovenia

  • Jesenice

    Upper Carniola

  • Nova Gorica

    Gorizia

  • Trbovlje

    Central Sava

  • Murska Sobota

    Mura

  • Ptuj

    Drava

Questions we get asked

Supplying Slovenia, in detail

01

Why does a Koper sailing beat Hamburg for a central European delivery?

Because the vessel turns north into the Adriatic after Suez instead of carrying on past Gibraltar and up the Atlantic. Koper is typically 17–23 days from Jebel Ali, and for delivery in Slovenia, Austria, Hungary or southern Germany that saves most of a week over Hamburg or Rotterdam. Once entered at Koper, the onward road leg within the customs union is domestic movement, quoted to the delivery address.

02

Koper or Trieste — does it matter for a delivery in Slovenia?

Usually not, and Koper is the default. Trieste is used where a berth or a sailing suits the schedule better, and the road leg into Slovenia is short either way. Either port gives one entry into free circulation, raised by the importer, so the choice is about the earliest arrival rather than paperwork. We pick the port against your delivery date and quote DAP to your site.

03

We supply a tier-one assembler — will you tell us if a hose construction changes between orders?

Yes, before shipping, not after. If a manufacturer has changed a construction, compound or fitting since your last order, we flag it at quotation and let you decide, rather than substituting silently. The same file states whether each assembly sits above the PED 2014/68/EU threshold, with our declaration of conformity travelling with the goods, and gives our REACH position on the elastomer compounds supplied.

04

What happens when a manufacturer discontinues a hose construction we have qualified?

We tell you what replaces it and how the two differ — reinforcement, cover, compound, bend radius, fitting interface — so your quality team can requalify on their terms instead of finding out from a changed layline. Where the old construction can still be sourced for a final order, we say so, so you can bridge the requalification period.

05

Can repeat orders for a production line be built identically every time?

Yes. Give each assembly a drawing or part number of your own and we build to it — same hose, same fittings, same cut length and orientation, same tag — and keep the record against your reference. If any component cannot be repeated exactly, we raise it at quotation. For appliance and automotive suppliers around Velenje and Novo Mesto, that is the difference between a routine delivery and a deviation report.

06

Do you supply the Velenje lignite mine and the Šoštanj power station?

Yes — dust-rated, high-cycle hose assemblies, fittings and cylinders for underground and surface mining equipment, and actuator and governor hydraulics for the thermal plant next door. Goods sail to Koper and are delivered by road on DAP terms into the Šalek valley. Send the machine data plates or the old assembly’s markings and we match the fitting standard rather than approximating it.

07

What do you need to match a cylinder or servo valve on the Jesenice or Ravne mills?

The data plate, the drawing or the original part number, plus the fluid the circuit runs on. High-force cylinders and servo valves for special-steel and plate mills are matched to the original rather than approximated, and hose assemblies are built for the plant’s working pressure and temperature. Goods land at Koper and go on by road to Upper Carniola or Koroška on DAP terms.

08

Do you supply hydraulics for terminal cranes and tugs at Luka Koper?

Yes. Hose assemblies made up to length, fittings, adapters and cylinders for ship-to-shore cranes, reach stackers, terminal tractors and harbour tugs are delivered direct to the terminal, since the goods arrive at the same port. Send the machine make and model or the old assembly’s markings; for a crane that is stopped, air freight to Ljubljana in 2–4 days can be quoted alongside the sea option.

09

Do you supply tunnelling hydraulics for the second Divača–Koper rail track?

We supply the hose, fittings and cylinders that drill jumbos, shotcrete rigs, excavators and cranes on rail and tunnelling works use, made up to length in Dubai and delivered to site from Koper on DAP terms. Send the machine make and model and the fitting standard; rock tunnelling is hard on hose, so tell us the duty and we will recommend the cover and protective sleeving.

10

Does an air shipment for a stopped Slovenian line come in through Ljubljana?

Yes. Air freight from Dubai to Ljubljana Airport goes with a connection and takes typically 2–4 days, and most Slovenian plants are within a short drive of the airport. It earns its cost on a single critical assembly; planned orders go by sea to Koper in 17–23 days. The Certificate of Origin and any PED declaration travel with the air shipment exactly as they would by sea.

Next step

Shipping to Slovenia?

Send the part numbers, or the bore, thread and pressure if you do not have them. We quote from real stock, in EUR, with the Incoterm stated rather than assumed.

Plant-down? Call +971 52 2477942 — 24/7

Quick enquiry

RFQ · SI

No account needed. We reply from the Dubai export desk.

Other export markets · 126 destinations

We run the same lane from Dubai to 125 other markets

All export markets