Skip to content

Hydraulics for wells, pipelines and refineries — where downtime is never an option.

API-rated, ATEX-certified and NACE-compliant components for wellhead controls, BOP systems, pipeline pump stations and refinery process control valves.

API 6A / 16A RATEDATEX / IECExNACE MR0175H₂S TRIM
A BOP accumulator unit with rows of pressure bottles, a pump skid and bundled hydraulic hoses at the base of a desert land rig at sunset
220+
OIL & GAS CUSTOMERS
18
YRS · UPSTREAM FOCUS
48h
EMERGENCY DELIVERY
24/7
PLANT-DOWN SUPPORT

Where we deliver

WELLHEAD & BOP

Blowout preventer controls

Accumulators, shuttle valves, kill manifold components. API 16A-compliant.

78 SKUs →
PIPELINE

Pump station hydraulics

Axial piston pumps, proportional valves, HPUs for mainline and booster stations.

94 SKUs →
REFINERY

Process valve actuators

Rack-and-pinion and scotch-yoke actuators, NAMUR solenoids, positioners.

112 SKUs →
OFFSHORE

Subsea & riser systems

High-pressure cylinders, seawater-compatible seals, ROV-interface components.

62 SKUs →

Oil & Gas-rated SKUs

All Oil & Gas SKUs →
Reference installs

A few of the projects we serve

Two technicians replacing a hydraulic actuator on a refinery control valve, a hydraulic power unit beside them
HPCL · 2024

Mumbai Refinery — HPU overhaul on 14 FCC control valves

14 rotary actuators, 3 HPUs and 220+ solenoid valves replaced during planned shutdown. 9-day turnaround.

A technician working on a BOP accumulator unit with charge pumps on an offshore platform deck
ONGC · 2025

BHS Neelam — BOP accumulator recharge

Emergency replacement of 6 × A10VSO-180 charge pumps on BOP stack. Plant-down response in 36h.

A technician commissioning a row of valve actuators on pipeline valves with a laptop, storage tanks behind
RELIANCE · 2024

Jamnagar DTA — actuator upgrade programme

Scotch-yoke actuator fleet upgrade: 32 units, HART-enabled positioners, commissioned in 4 weeks.

Quoting a project in Oil & Gas?

Tell our applications team what you're specifying. We reply within one business day with availability, lead time and a fixed-price quote — no obligation.

Plant-down? Call +971 52 2477942 — 24/7

PLANT-DOWN SUPPORT

When your process line trips at 02:00, we answer.

Our oil & gas team maintains pre-staged critical spares and can despatch to wellhead, pipeline station or refinery gate within 48 hours — anywhere in our service network.

  • ✓ Pre-staged API-rated critical spares
  • ✓ ATEX-certified components from stock
  • ✓ On-site commissioning by certified hydraulic technicians
  • ✓ NACE-compliant materials, certified documentation
Request plant-down support →
Two service engineers in coveralls unloading a crate of spare valves and actuators from a pickup at an oil and gas facility

Delivery

Where we supply oil and gas operations

Oilfield buying is governed by certification more than by geography: an API pressure class and a material class mean the same thing in Basra as in Port Harcourt, and the mill and test records travel with the goods either way. We supply hose, pressure-control equipment and flow-iron spares from Dubai into the basins that buy them, and on most of these lanes it is the documentation rather than the freight that sets the timeline.

GCC & Middle East
Saudi Arabia, Jordan, Lebanon
North America & Caribbean
the United States, Costa Rica, Guatemala
West & Central Africa
Nigeria, DR Congo, Equatorial Guinea

Everything above ships from the same Dubai warehouse. If your destination is not listed, it is almost certainly still one we quote. See every export destination