Category
Drilling & Workover Systems
Drilling & workover packaged systems — mud pump packages, mud manifolds, degassers, mud / workover tanks, liquid mud plants, and mobile labs / workshops.
7 SKUs1 brands
Delivery
Drilling & Workover Systems across the Gulf
Ex-stock from Dubai, delivered within 3 working days in the UAE.
Rig equipment moves between contracts, and the spares that support it move with the rig rather than with the country. We supply against the same API references wherever the rig is working and ship from Dubai, which is a short lane to most of the Gulf and a well-served one to the basins beyond it. Send the rig make and the assembly rather than a part number if that is what you have.
Saudi ArabiaTypically 3 working days from dispatchOmanTypically 3 working days from dispatchQatarTypically 3 working days from dispatchBahrainTypically 3 working days from dispatchKuwaitTypically 3 working days from dispatch
Beyond the Gulf
- West & Central Africa
- Nigeria, Burkina Faso, Niger
- CIS & Caucasus
- Kazakhstan, Azerbaijan, Moldova
- North Africa
- Egypt, Tunisia, Mauritania
IH-MDG-V1000-UT-NACE
IH-MML-20FT-HVAC
IH-LMP-MOD-8K-ISO
IH-LMP-MOD-8K-ISO
Liquid Mud Plant (LMP), Modular 8,000-BBL Total Storage, ISO Container Footprints
Indus Hydraulics
IH-WTK-240-BRN-INS
IH-WTK-240-BRN-INS
Workover Tank, 240 BBL, Brine Service, Insulated, Manholes + Recirc Manifold
Indus Hydraulics
IH-MMF-4IN-5K-DEMCO
IH-MMF-4IN-5K-DEMCO
Drilling Mud Manifold, 4-inch 5,000 psi, Demco Valves, X-Ray + PWHT
Indus Hydraulics
IH-MPP-T1600-EDR-MOD
IH-MPP-T1600-EDR-MOD
Mud Pump Package, Triplex 1,600 HP, Electric Drive, Modular for Offshore Lift
Indus Hydraulics
IH-MTK-500-ISO40
IH-MTK-500-ISO40
Mud Tank, Skid-Mounted, 500 BBL, 40-ft ISO Footprint, Manholes + Sight Gauges
Indus Hydraulics
