SERVICES · WORKSHOPS · ON-SITE

Things people bring us broken, and what we sent back.

Service jobs run out of our Jebel Ali yard — written as case studies, with photos, measurements and what it actually cost. Browse the cases or jump straight to a quote.

2,400+
Jobs / yr
96h
Avg TAT
100%
On-time
Case of the week
NO. 01· CYLINDERS · OILFIELD· MAR 2026 · BAY 2 / ON-SITE

Eight tie-rod cylinders, 96 hoses, and a workover rig that needed to be back on a well in 19 days.

ADNOC sub-contractor pulled a 50,000-lb hydraulic workover unit off a sour-gas well in the Rub’ al Khali. We rebuilt eight tie-rod cylinders, 96 hoses and four accumulators in our JAFZA yard — back skidding 23 days later.

19 D TAT
19 D TAT
NACE MR0175
NACE MR0175
ADNOC AVL
ADNOC AVL
Indus Hydraulics🇦🇪 UAE · JEBEL ALI
IWCF TRAINING2-5 D / COURSE
NO. 20IWCF TRAINING

IWCF and IADC WellSharp well-control certification — the cards Aramco asks for, taught by people who have closed a real BOP under a real kick.

IWCF and IADC WellSharp accredited well-control certification from the Dubai training centre. Drilling Well Control Levels 2-4, WIPC tracks (CT / Snubbing / Wireline), 2-year recerts. Monthly open enrolment plus 15+ candidate bulk cohorts at the centre or on-rig anywhere in the GCC. Bilingual EN / AR on request.

IWCF + IADC WellSharp accreditedAramco-spec supervisor certBilingual EN / AR on requestMonthly open enrolment
RCD / MPD2-6 WEEK CYCLE
NO. 19RCD / MPD

The RCD service line that keeps Managed Pressure Drilling inside its narrow window — passive seals, bearings, and the ancillary kit downstream.

Per-asset Rotating Control Device service for MPD operations across the GCC — Weatherford, SLB, NOV-Williams and Halliburton families. Passive seal renewal, bearing rebuild, containment ring inspection, hydrotest at 1.5× WP, function test at 200 rpm under full annular pressure. Plus the MPD ancillary kit downstream.

4 OEM families servicedFunction test 200 rpm under pressureNACE MR0175 sour serviceMPD ancillary in scope
DIVERTER RECERT4-8 WEEK CYCLE
NO. 18DIVERTER RECERT

A 21-1/4" 2K diverter recert — because shallow gas doesn't belong on the rig floor.

Recurring API 16A 5-year recertification on 21-1/4" 2K class top-hole diverter systems for ADNOC Offshore and Saudi Aramco offshore jack-ups. Strip, NDT, reseal, hydrotest at 3,000 psi, witnessed close-divert function test, 5-year recert stamp. 4–8 week cycle out of Jebel Ali.

Hydrotest 3,000 psi · 0 dropClose-divert function · witnessedAPI 16A recert · 5 yr validityNACE MR0175 sour service
15K HPHT BOP8-14 WEEK CYCLE
NO. 1715K HPHT BOP

A 15K HPHT BOP service for the GCC's nastiest reservoirs — where 30% H₂S is the design case, not the worst case.

Specialist 15K HPHT BOP recertification at our Jebel Ali workshop — Cameron UII / Shaffer NXT-15K class — with full API 16A HPHT addendum requalification for ADNOC Hail & Ghasha (H₂S to 30%), Saudi Aramco Jafurah and PDO Khazzan / Ghazeer sour-gas reservoirs.

Hydrotest 22,500 psi · 0 dropCharpy + NACE on every metallicAPI 16A HPHT recert · 5 yrHNBR / AFLAS · HPHT-qualified
SUBSEA FAT/SITPER-PROJECT · 4-8 WEEK
NO. 16SUBSEA FAT/SIT

Your eyes on the OEM floor — independent FAT and SIT witness on a new-build subsea BOP stack.

Senior BOP engineering authority mobilises to Cameron, NOV and Hydril Houston workshops to witness FAT and SIT on new-build 18-3/4" subsea BOP stacks for ADNOC Offshore and Saudi Aramco offshore. Independent technical proxy where direct operator attendance is not feasible.

IWCF Supervisor + 15+ yr authorityAPI 16A · 16D · 17D witnessOperator stamp + signed reportNACE MR0175 sour service
CT/SNUB/WL BOP2-6 WEEK CYCLE
NO. 15CT/SNUB/WL BOP

Intervention BOPs are not drilling BOPs — and the workshop discipline is not the same.

Indus runs a dedicated intervention-BOP line — CT Quads, snubbing stacks with stripper rams, wireline grease BOPs — separate from the drilling bays. Sour-service rebuild, API 16A 5-year recert, hydrotest at 1.5× WP, function test per cavity. 2-6 week cycle TAT for Halliburton, SLB, Expro, Cansco, Axis and Cudd intervention crews.

CT Quad · Snub · WirelineHydrotest 1.5× WP · 30 minAPI 16A recert · 5 yrNACE MR0175 sour service
FIELD CREWDAY-RATE · 48 H DISPATCH
NO. 14FIELD CREW

A BOP field service crew on day-rate — IWCF cards, H₂S certs, and a truck rolling out of Jebel Ali in 48 hours.

Day-rate BOP field service crew out of Jebel Ali — IWCF Level 4 supervisor, H₂S-trained technicians, SAEP-1142 NDT-equivalent for KSA work. 48-72 h standard dispatch, 24 h emergency response, full sour-service PPE and tooling on the truck. Pre-cleared on every major GCC operator vendor list.

48 h standard dispatch · 24 h emergencyIWCF L4 + WellSharp + SAEP-1142Day-rate · 30+ day campaignsNACE MR0175 sour service
STACK RENTAL7-DAY MOB · 30-365 DAYS HIRE
NO. 13STACK RENTAL

The 11" 10K workover BOP stack we keep on a 7-day mob — and a fresh API STD 53 cert in the box.

Indus's 11" 10,000 psi workover BOP stack rental — Cameron-U double-ram + Hydril GK annular + matched 3-1/16" 10K choke manifold + Koomey Type 80 control unit. Sour-service trim, hydrotest cert dated inside fourteen days of ship, 5 — 7 day mobilisation from Jebel Ali, 30 — 365 day hire windows, spares pool staged for the duration.

Mob 5 — 7 days from POHydrotest cert ≤14 dSpares pool on standbyNACE MR0175 sour service
ANNUAL REDRESS12-MONTH CYCLE · 5-10 D
NO. 12ANNUAL REDRESS

The 12-month BOP redress — Aramco-spec elastomer renewal, on-rig in a week or workshop in three.

Saudi Aramco specifies 12-month elastomer replacement on every BOP in the fleet. ADNOC, KOC, PDO and QatarEnergy run the same annual cadence. We deliver that redress on rotation across the GCC — five to ten days at-rig, or two to three weeks at our Jebel Ali workshop with a rental BOP available.

Per-cavity HNBR / AFLAS soft goodsAPI STD 53 pressure tests12-month redress certificateNACE MR0175 sour service
PRESSURE TESTINGPER-RIG · 14-DAY CYCLE
NO. 11PRESSURE TESTING

The 14-day BOP test cycle, per API STD 53 — every active rig in the GCC, every two weeks, on the chart.

API STD 53 says the BOP stack gets tested every 14 days. Every operator in the GCC enforces it. Indus runs a standing pressure-test crew out of Jebel Ali — IWCF Level 4 supervisor, chart operator, assistant — that mobilises within 48 — 72 h to any active rig in KSA, UAE, Iraq or Oman.

API STD 53 · 14-day cycle5K · 10K · 15K stacksIWCF Level 4 supervisorNACE MR0175 sour service
BUILD4 WK BUILD
NO. 10BUILD

A plant engineer walked in with a sketch on grid paper. Four weeks later we bolted his 16-port manifold to the press.

A UAE steel-stamping plant brought us a hand-drawn 16-port circuit on grid paper. We turned the sketch into an EN24 manifold, hydrotested it at 630 bar, and bolted it to the press the same shift it landed.

630 BAR HYDROTEST · PASS27 / 27 LEAK PATHSEN24 · 850 MPA4-WK BUILD CYCLE
LAB5 D / SAMPLE
NO. 09LAB

Fourteen hydraulic systems, one rising iron trend, and a pump bearing caught three weeks before it grenaded.

Quarterly oil-condition round on 14 hydraulic systems at an Emirates aluminium smelter. ISO 4406 was green on system #7 — but ferrography flagged a rising Fe + Cr signature. Pump pulled 18 days later. Bearing 75% spalled. Estimated AED 800K avoided.

14 / 14 verdicts on timeBearing caught at 75% spall~AED 800K avoidedISO 4406:2017
HOSES14 D BUILD
NO. 08HOSES

112 assemblies, 14 days, every hose tagged. A cold-stacked rig refitted for sour service.

Drilling rig coming out of cold-stack. Drilling engineer hands us a 112-line BOM with a 14-day window, sour-service NACE across all four circuits. Built in JAFZA hose bay; every assembly tagged and traceable.

112 / 112 PROOF-PASS14-DAY BUILDNACE MR0175 PER ASSEMBLY
HPU8 D ON BENCH
NO. 07HPU

A 50 HP rig HPU came in for a filter change. The schematic on file was wrong, the oil was at 22/19/16, and the noise floor was 7 dB louder than the operator remembered.

A 50 HP auxiliary HPU off a UAE land rig came in for what the operator thought was a filter change. Eight days later it left with new bearings, a trued manifold, oil at target ISO 4406 17/15/12, the right schematic on the skid, and the operator cabin 7 dB quieter.

OIL 17/15/12−7 DB CABINSCHEMATIC REDRAWN6 MO WARRANTY
CHOKE & KILL28 D ON BENCH
NO. 06CHOKE & KILL

A 3-1/16" 10K choke & kill manifold, eight gate valves, and the trim swap that bought it five more years of sour service.

A 3-1/16" 10K choke & kill manifold from ADNOC Lower Zakum, recerted to API 16C with full NACE trim swap on 8 gate valves and 2 chokes. 28 days on the bench, 15K shell test on every body, fresh 5-year stamp valid through 2031.

5-YR RECERT STAMPED15K HYDROTEST · 10/10NACE MR0175 CERT
CT & WIRELINE5 D EMERGENCY
NO. 05CT & WIRELINE

A CT injector skid pulled mid-job from a sour Aramco well — back on location in five days, not seven.

A CT injector skid was pulled mid-job from a sour Aramco well with chain-block slip and a dead accumulator. We stripped, re-faced, re-bladdered, re-tuned and function-tested it in 5 days — back on location for the same-week return slot.

5-day turnaround · slot heldOEM commissioning · 24/24Same-week return
KOOMEY8 D ON BENCH
NO. 04KOOMEY

Eleven nitrogen bottles, four spent bladders, and an API 16D 5-year clock with thirty days left.

KOC pulled an 11-station Koomey Type 80 closing unit at 4 yr 11 mo. We rebladdered all 11 accumulators, overhauled the SPM stack, recharged on traceable nitrogen, and stamped the API 16D 5-year recert in 8 bench days.

API 16D · 5-yr stamp11 / 11 SPM passed8 days benchNACE MR0175
BOP & RECERT42 D ON BENCH
NO. 03BOP & RECERT

A 5-year recert on a 13-5/8" 10K Cameron Type-U — and an annular that came off the bench faster than it went on.

ADNOC Drilling pulled a Cameron Type-U 13-5/8" 10K BOP for its mandatory 5-year API 16A major recert. We took it down to component level, NDT'd every metallic, replaced every elastomer, hydrotested at 15,000 psi, and put it back on the rig 42 days later with the annular closing 0.6 s faster.

Hydrotest 15,000 psi · 0 dropAnnular −0.6 s vs last rig runAPI 16A recert · valid to 2031NACE MR0175 sour service
MUD PUMP11 D ON BENCH
NO. 02MUD PUMP

A 12-P-160 fluid end the operator wanted to scrap — and the AED 1.4 million we talked them out of spending.

An ADNOC Bab field contractor was about to buy a new triplex mud pump fluid end at AED 3.8M list. The deck was reusable. We rebuilt it in eleven days at 37% of replacement cost, hydrotested to 7,500 psi.

AED 1.4 M saved11 days on bench7,500 psi hydrotest
HOW WE WORK · A LOOK INSIDE

The same four steps run every service, every time — from a piston seal to a BOP recert.

STEP 02 · MEASURE & QUOTE

You get a 12-page PDF before we cut a single piece of metal.

Bore roundness, rod straightness, gland clearances, deck flatness, seat depths — captured against OEM tolerances, with a recommendation for each finding. If you’d rather replace than rebuild, we’ll tell you, and quote the replacement too.

12-page PDFDimensional dataPhoto evidenceCost vs replaceLead-time options
LONG READS · ENGINEERS WRITING ABOUT THEIR JOBS

Two recent service stories worth your time.

FROM THE FIELD · IWCF TRAINING · 5 D ON BENCH

IWCF and IADC WellSharp well-control certification — the cards Aramco asks for, taught by people who have closed a real BOP under a real kick.

IWCF and IADC WellSharp accredited well-control certification from the Dubai training centre. Drilling Well Control Levels 2-4, WIPC tracks (CT / Snubbing / Wireline), 2-year recerts. Monthly open enrolment plus 15+ candidate bulk cohorts at the centre or on-rig anywhere in the GCC. Bilingual EN / AR on request.

IWCF + IADC WellSharp accredited
Outcome
Aramco-spec supervisor cert
Outcome
Bilingual EN / AR on request
Outcome
SERVICE INTAKE · OPEN 24×7 · JEBEL ALI

If it leaks, hums, screams, drips, slips or simply refuses to move — we’d like a look at it.

Send us a photo, an SKU or a part on a pallet. We’ll do the rest.

An applications engineer will read your ticket inside one business day — no charge for the conversation, no obligation to use us.