
Indus Hydraulics · data centre liquid-cooling components
Stainless steel valves, fittings & flanges for data centre liquid cooling.
Standard and drawing-based components for facility water, CDU and selected technology cooling interfaces, supplied from our principal manufacturing partner. Material, dimensions, traceability and inspection are controlled to project requirements.
- 304 / 316L options by product specification
- Standard parts and custom components from approved drawings
- Material records and project-defined inspection documentation

Supply scope
What we supply, and what the diagram only locates.
In the illustrated liquid-to-liquid architecture, the CDU separates the facility water system from the technology cooling system. Final coolant and wetted-material compatibility must be confirmed by the system designer.
Project fit & system locations
Components for CDU, manifold and facility-water connections
We supply standard and drawing-based stainless steel connection parts for CDU OEMs, row- and rack-manifold manufacturers, system integrators and EPC/MEP contractors. Material, connection and inspection requirements are confirmed against project specifications before production.
CDU MANUFACTURERS
CDU manufacturers
Valves, fittings, flanges and custom adapters for internal piping and heat-exchanger interfaces.
MANIFOLD BUILDERS
Rack manifold builders
Fittings, valves and adapters for branch connections, manifold ports and equipment interfaces.
EPC · MEP
EPC and MEP contractors
Connection parts for facility-water tie-ins, skid interfaces and field-installed piping systems.
INTEGRATORS
Liquid-cooling system integrators
Standard and custom components for modular assemblies and selected technology-cooling interfaces.
Liquid-cooling system locations
Where our components fit in data centre liquid cooling
Stainless steel valves, fittings, flanges and drawing-based adapters for defined connection points in facility-water piping, CDU assemblies and selected manifold and rack-side interfaces. Scope is confirmed against project drawings, fluid, pressure, temperature, material and inspection requirements.
01Facility Water Supply & Return
CDU inlet/outlet piping, pump-skid connections and facility-side tie-ins.
Relevant products
02CDU Internal Piping
Heat-exchanger, pump, filter, drain, bypass and service connections.
Relevant products
03Rack Manifold Distribution
Manifold inlets, outlets, branch ports and isolation points.
Relevant products
04Rack-Side & Cold-Plate Loop Interfaces
Hard-pipe transitions and defined equipment interfaces upstream of hose and quick-disconnect assemblies.
Relevant products
Product families
Stainless steel components for data centre liquid cooling
Choose by connection method and system location. Standard and drawing-based parts are supplied to agreed material, dimensions, end connections and inspection scope.

SW · ASME B16.11
Socket-Weld Fittings
- Compact connection profile for space-limited piping layouts
- Welded joints reduce the number of detachable connection points
- Drawing-based dimensions available for equipment and manifold interfaces
Includes: Elbows, tees, couplings and reducers for facility-water, CDU and manifold piping.
Enquire about socket-weld fittings
316L · CLAMP END
Sanitary Fittings
- Smooth-bore transitions with fewer internal geometric interruptions
- Clamp-end configurations support faster assembly and disassembly
- Multiple end configurations for equipment and piping transitions
Includes: Elbows, tees, reducers, ferrules and clamps for CDU and equipment connections.
Enquire about sanitary fittings
ISOLATION · DRAIN · NRV
Sanitary Valves
- Compact stainless designs for space-constrained equipment piping
- Matching clamp or weld ends reduce unnecessary transition parts
- Multiple valve configurations for defined system functions
Includes: Butterfly, ball, diaphragm and check valves for isolation, drain, bypass and non-return functions.
Enquire about sanitary valves
WN · BLIND · CUSTOM
Flanges & Adapters
- Connect dissimilar flange, weld and threaded interfaces
- Drawing-based machining supports accurate mating geometry
- Detachable interfaces simplify equipment installation and removal
Includes: Flanges and custom adapters for skid, manifold, equipment and facility-piping interfaces.
Enquire about flanges & adaptersSubmit drawing or BOM: we review manufacturability, material, end connections and inspection scope before quotation.
Submit drawing or BOMEngineering & quality control
Quality controlled from drawing to dispatch
Each order is controlled against the approved drawing, specified material, agreed inspection scope and packing requirements.

01 · DRAWING & INTERFACE CONTROL
Approved Dimensions Before Production
Drawings or confirmed samples lock dimensions, end connections and acceptance criteria before production.

02 · MATERIAL TRACEABILITY
Material Identity Maintained
Where required, the Material Test Report and heat-number marking link the supplied part to the specified stainless steel grade.

03 · AGREED INSPECTION SCOPE
Acceptance Criteria Defined Upfront
Dimensions, surface condition and any specified tests are checked against agreed methods and acceptance criteria.

04 · CLEANING & PACKING CONTROL
Protected for Shipment
Where specified, parts are deburred, cleaned, dried, capped and separated to reduce contamination and handling damage before dispatch.
Project risk control
Control interface, material, leakage and shipping risk before installation.
Critical interface, material, inspection and packing requirements are confirmed before production. The agreed order documents define the checks to be performed and the records to be supplied.
01 · INTERFACE MISMATCH
Control: Confirm connection type, critical dimensions, wall thickness, tolerances and installation clearance against the approved drawing or confirmed sample.
Project record: Approved drawing or confirmed product sample
02 · MATERIAL UNCERTAINTY
Control: Confirm stainless steel grade, wetted materials, seal material, surface finish and service fluid before production.
Project record: Material certificate and heat-number record
03 · LEAKAGE OR FUNCTIONAL NONCONFORMANCE
Control: Define dimensional checks and any specified pressure, leakage or valve-function tests, including the method and acceptance criteria, before production.
Project record: Inspection report and specified test report
04 · CONTAMINATION OR SHIPPING DAMAGE
Control: Define deburring, cleaning, drying, end protection, separation and packing requirements for the application.
Project record: Final inspection and packing record when specified

Start your project review
Send your drawing or BOM for technical review
Send a drawing, BOM or specification. We review manufacturability, dimensions, connections, material, quantity, inspection and documentation requirements before quotation.
01 · SUBMIT
Send Your Drawing or Requirements
Provide the drawing, BOM or specification with quantity, material, connection and application details.
02 · TECHNICAL REVIEW
Confirm the Supply Scope
Review dimensions, material, end connections, quantity and applicable operating requirements against the submitted information.
03 · CONFIRM
Agree Inspection and Documentation
Define inspection items, acceptance criteria and the records required with the order.
04 · QUOTE
Receive a Defined Quotation
The quotation states the confirmed product scope, quantity, price, lead time, inspection, documentation and packing requirements.
Project enquiry
Attach the drawing or BOM and we reply within one business day.
- Reply time
- 1 business day
- Quoting currency
- AED / USD
- Best fit
- CDU OEMs · manifold builders · EPC / MEP · integrators
Specifying a liquid-cooling build?
Send the interface drawing and the fluid, pressure and temperature conditions. We confirm scope, material and inspection before we quote.
