Skip to content
+971 52 2477942
Lane DXB → MECrna Gora

Export from Dubai

ME

Hydraulic & industrial hose supplier in Montenegro

Indus Hydraulics ships hydraulic, industrial and marine equipment from Jebel Ali to Montenegro by sea, transhipped in the Mediterranean into Bar in typically 22–30 days, or by air into Podgorica in 3–5, with one Montenegrin customs declaration and a Dubai Chamber-attested Certificate of Origin. Bar means a single entry rather than a transit plus a border, but feeders are infrequent, so we build each consignment to catch a named sailing. Tivat’s superyacht refits and inland plant draw on the same lane.

Typical transit
Typically 22–30 days by sea from dispatch, feeder-dependent
Freight
Sea freight from Jebel Ali through Suez to Bar, transhipped in the Mediterranean · Ploče or Durrës and road where the feeder schedule is poor · Air freight into Podgorica where the schedule is tighter
Incoterms 2020
CIF Bar · DAP to the buyer’s site · FOB Jebel Ali · EXW Dubai for a nominated forwarder
Documentation
Montenegrin customs declaration raised by the importer · Certificate of Origin, Dubai Chamber attested · Material and test certificates where the specification calls for them
Fig. 01 · Export lane DXB → MEMercator · WGS 84
BAR · PORTPODGORICANIKŠIĆPLJEVLJATIVATBUDVA18°E19°E20°E21°E42°N43°NN50 KMSEA · TRANSHIP · 7,670 KM · FROM JEBEL ALI · DXB
Port of entryDelivery citysea · tranship corridor from JEBEL ALI · DXB
Origin
Jebel Ali · Dubai
Primary mode
Sea, transhipped
Port of entry
Bar
Transit
22–30 days
Quoted in
EUR
Docs prepared
Before the vessel sails
Warehouse aisle with racked reels of hydraulic hose on one side and bins of steel hose fittings and adapters on the other

01 · Stock

Stock held in Dubai, not drop-shipped from a factory queue.

Technician in safety glasses crimping a steel fitting onto a hydraulic hose, tagged assemblies and a pressure-test cabinet behind

02 · Assembly

Assemblies crimped and pressure-tested before they are packed.

Export documents and certificates fanned out on a desk beside a rubber stamp, a pen and a hydraulic hose fitting

03 · Documents

Conformity set for Montenegro prepared while the order is picked.

Flatbed trailer loaded with shrink-wrapped hydraulic hose coils and cartons, strapped down at a warehouse yard gate

04 · Dispatch

One consignment, one set of documents, tracking on dispatch.

Catalogue · 21 clusters · 289 ranges

What we supply to Montenegro

Browse the full catalogue

Everything below ships from the same Dubai warehouse, so a mixed order travels as one consignment under one set of documents. Open any card for its full list of ranges, or follow a heading through to specifications and an RFQ.

Hydraulic hose, fittings and adapters — wire-braid, spiral, compact and thermoplastic hose, crimp fittings and ferrules, SAE J518 flanges, quick couplers, and DIN 2353, BSP, JIC 37°, ORFS, metric and NPT thread forms. Carbon steel and SS316L.

Show all 77 Hoses & Fittings ranges

Industrial hoses for air, water, food, oil, chemical, steam and abrasive applications. Own-brand Indus rubber and PVC lines alongside engineered metallic and PTFE hose assemblies.

Shackles, hooks, lifting chain, wire rope, slings, hoists and blocks for lifting and rigging — each size under an Indus part number, with the working load limit wherever the manufacturer rates it. Supplied from Dubai with the manufacturer's test certificate.

Wellhead, frac, and process oilfield valves — ball, gate, check, plug, choke, globe, butterfly, surface safety (SSV/ESD), pressure relief, instrumentation. API 6A / 6D / 16C, sour and standard service.

WECO frac iron, integral fittings, hammer unions, swivel joints, manifolds, API 6A flanges, wellhead systems, and surface test trees for upstream oil and gas. 1K to 20K psi, sour and standard service. FMC / Cameron / SPM / Anson / NOV / Stream-Flo / Indus.

DEMCO resilient-seated butterfly valves from 2″ to 36″ with actuators, gear operators and handles, Victaulic grooved butterfly valves, industrial and high-pressure hydraulic ball valves, and Yuken CETOP 3 solenoid directional, relief and modular valves.

Annular and ram blowout preventers built to the Hydril GK and Cameron U patterns, ram blocks, control units, choke & kill manifolds, diverters, drilling spools and BOP spares for onshore and offshore drilling, with sour-service (NACE MR0175) construction.

Oilfield instrumentation & controls — data acquisition, flowmeters (magnetic / turbine / Coriolis), pressure sensors, gauges, thermometers, AC/DC converters, VFD systems, ex-proof electrical panels.

Surface well-testing packages — 3-phase separators, MPFM systems, surge tanks, KO drums, flare stacks, test pumps, sand filters, ESD panels, data headers, piping packages.

Frac fleet equipment — pumpers up to 3,000 HP, transfer pumps, missiles, sand silos, blenders, hydration units, LAS, data vans, and frac tanks.

Enerpac torque wrenches, bolt tensioners, flange tools, jacks, pullers, presses and cutters, Stanley hydraulic power tools and Pierce winches, listed by series with every model number.

Export quote · ME

Send the part list for Montenegro

Part numbers if you have them; bore, thread and pressure if you do not. A photo of the failed part is usually enough.

One line per item. Quantities and lengths help us quote from stock.

Drag and drop, or

PDF · JPG · PNG · HEIC · STEP · DWG — up to 25 MB each, 6 files

0 attachments ready

Standards

Standards we supply and certify against for Montenegro

StandardTypesApplies to
EN 8531SN · 2SNWire-braid hydraulic hose
EN 8564SP · 4SHSpiral-wire hydraulic hose
EN 8571SC · 2SCCompact wire-braid hose
SAE J517100R1 · R2 · R12 · R13 · R15SAE hydraulic hose series
ISO 18752Grades A–DPerformance-based hose classification
API 16CChoke & killWell control flexible lines
API 7KRotary & vibratorDrilling hose
API 6APSL 1–4Wellhead equipment
DIN 2353L · S seriesBite-type tube couplings
ISO 8434-124° coneMetric tube connections
ISO 6162 / 12151Code 61 · 62SAE flange and hose connections
EN 14420-5ClampedIndustrial hose couplings
NACE MR0175ISO 15156Sour-service materials
ISO 9001:2015CertifiedQuality management system

Customs

Tariff lines we declare under

  • 4009.22Rubber tube, reinforced with metal, with fittingsHydraulic hose assemblies
  • 4009.42Rubber tube, reinforced with other materials, with fittingsIndustrial hose assemblies
  • 7307.91Flanges, iron or steelSAE and API flanges
  • 7307.99Tube and pipe fittings, iron or steelAdapters, nipples, couplings
  • 8481.80Taps, cocks, valves and similar appliancesBall, gate, butterfly, needle
  • 8413.60Rotary positive displacement pumpsGear and vane pumps
  • 8412.21Hydraulic power engines, linear actingCylinders
  • 3403.99Lubricating preparationsGreases, pastes, compounds

Classification is confirmed line by line at quotation. This is the set most consignments to Montenegro are declared under.

Freight

Three ways in, priced per shipment

Sea, FCL22–30 days
Jebel Ali to Bar, transhippedDefault for most orders
Air freight3–5 days
DXB to TGD, with a connectionWhen the line is down
Sea + road24–32 days
Ploče or Durrës, then roadWhen the feeder schedule is poor

Sequence

How an order to Montenegro works

  1. 01Send the part numbers, or the bore, thread and pressure if you do not have them. A photo of the failed part is usually enough.
  2. 02We quote in EUR against real stock, with the Incoterm stated on the Estimate rather than assumed.
  3. 03The consignment is built to catch a named feeder rather than an average schedule, because Bar is served infrequently and a missed sailing costs a fortnight.
  4. 04Goods sail from Jebel Ali and tranship for Bar, and you get the paperwork and tracking together.

Industries

Who we supply in Montenegro

Delivery coverage

Cities and sites we deliver to in Montenegro

DAP deliveries go to the site gate. Coordinates are given because project sites are easier to name that way than by address.

12 locations listed

  • Bar

    Coastal

  • Podgorica

    Central

  • Nikšić

    Central

  • Pljevlja

    Northern

  • Bijelo Polje

    Northern

  • Berane

    Northern

  • Tivat

    Coastal

  • Kotor

    Coastal

  • Herceg Novi

    Coastal

  • Budva

    Coastal

  • Ulcinj

    Coastal

  • Mojkovac

    Northern

Questions we get asked

Supplying Montenegro, in detail

01

What does Bar save us compared with routing through a neighbouring port?

A second customs file. The landlocked markets next door need a transit through a neighbour and then their own border declaration — two files and two chances of a mismatch. Montenegro makes a single entry at Bar, lodged by the importer through the Customs Administration before arrival. For a small consignment that is a real saving in both cost and risk.

02

Why can the transit to Bar vary by a fortnight?

Because Bar is fed by feeder rather than a mainline call, and sailings are infrequent. Cargo from Jebel Ali tranships in the Mediterranean and waits for the next feeder, so a missed connection costs a fortnight rather than a few days. That is why the lane is typically 22–30 days, and why we build each consignment to catch a named sailing rather than an average schedule.

03

Why do Montenegrin orders arrive sooner combined than shipped separately?

Because every consignment has to catch a feeder into Bar. One consolidated consignment built for a named sailing lands sooner and cheaper than three small ones chasing separate feeders, each with its own risk of a missed connection. We look at your open lines at quotation and say when combining them will save a sailing, and when a single urgent item is better sent by air into Podgorica.

04

When do Ploče or Durrës beat a direct feeder to Bar?

When the feeder schedule into Bar is poor. Sea to Ploče in Croatia or Durrës in Albania and then road to Montenegro runs typically 24–32 days, against 22–30 by feeder into Bar, but a regular call at either port can still deliver sooner than waiting for the next Bar sailing. We compare the options against the actual schedule at quotation.

05

A yacht in Tivat needs a hose before it sails — how fast can one arrive?

Typically 3–5 days by air from Dubai into Podgorica, with a connection, then a short road leg to Tivat or the Bay of Kotor. Send the failed assembly’s markings or a photograph with the bore, end fittings, working pressure and length between fitting faces. We build and pressure-test it in Dubai, and finish it for a visible run where it passes through owner spaces.

06

How does the feeder schedule affect a delivery to Podgorica or Nikšić?

It sets the date; the road leg barely moves it. Delivery is on DAP terms to the site, and the road leg from Bar to Podgorica or Nikšić is short by regional standards and priced with the order. The variable is the feeder into Bar, so we quote the delivery date against the named sailing the consignment is built to catch rather than against an average schedule.

07

Do slings bought for the quays at Bar arrive ready for the lifting inspector?

They arrive marked and documented; the examination itself stays with your appointed lifting inspector. Wire rope and chain slings, shackles, hooks and rigging hardware ship from Dubai marked with their working load limit and with the manufacturer’s test certificates the order calls for, on the same feeder as hydraulic parts. Send the format your inspector or terminal requires, and we confirm the document set at quotation.

08

Nobody in Montenegro stocks our coupling pattern — do we have to modify the machine?

Usually not. In a market this size a local distributor cannot economically hold beyond the fastest-moving lines, so anything unusual looks like a long wait. A single adapter, a short run of an uncommon bore or a coupling in a pattern nobody stocks locally is an ordinary catalogue item for us and moves by air in typically 3–5 days. Ask before modifying equipment to suit what is available.

09

What do drill jumbos on the Bar–Boljare tunnels need most from a hose supplier?

High-pressure hose that survives abrasion, and spares on hand before they are needed. Hose assemblies made up to length, fittings, valves and cylinder seals for drill jumbos, excavators, cranes and concrete plant, delivered DAP to the site or contractor’s yard. Mountain tunnelling works hydraulics hard, so send the machine and circuit with the working pressure, and plan routine spares around the named feeder into Bar rather than ordering piecemeal.

10

Is the Pljevlja coal mine too far inland to supply through Bar?

No, but the timetable needs planning. Abrasion-resistant hose, fittings and valves for the Pljevlja coal mine and the thermal station beside it travel by feeder into Bar, typically 22–30 days, then by road north, which is the longest inland leg in Montenegro. Coal dust and continuous running shorten hose life, so order outage and overhaul spares against the named sailing rather than flying single items into Podgorica.

Next step

Shipping to Montenegro?

Send the part numbers, or the bore, thread and pressure if you do not have them. We quote from real stock, in EUR, with the Incoterm stated rather than assumed.

Plant-down? Call +971 52 2477942 — 24/7

Quick enquiry

RFQ · ME

No account needed. We reply from the Dubai export desk.

Other export markets · 126 destinations

We run the same lane from Dubai to 125 other markets

All export markets