Delivery
Boiler Pressure Parts across the Gulf
Ex-stock from Dubai, delivered within 3 working days in the UAE.
Lead times & marketsShow less
Heat-exchanger, boiler and finned tube is bought against a standard, a grade and a wall, and the mill test certificate travels with the bundle. Straight lengths up to 12 m or so go by sea in bundles or wooden crates; U-bend tubes are packed by bend radius in crates that keep the legs straight, and finned tubes in boxes that protect the fins. Exchangers, tube sheets and pressure parts are built to the data sheet and shipped crated or on flat racks. Send the standard, grade, size and quantity, and we quote with the documents the inspector will ask for.
- Saudi ArabiaTypically 3 working days from dispatch
- OmanTypically 3 working days from dispatch
- QatarTypically 3 working days from dispatch
- BahrainTypically 3 working days from dispatch
- KuwaitTypically 3 working days from dispatch
- East Africa
- Kenya, Madagascar, Mozambique





