Skip to content
+971 52 2477942
Lane DXB → HUMagyarország

Export from Dubai

HU

Hydraulic & industrial hose supplier in Hungary

Indus Hydraulics ships hydraulic hose, fittings, valves and industrial hose from Jebel Ali to Koper or Rijeka and on by road to Hungarian sites in typically 21–28 days, through Constanța for the Great Plain in 24–32, or by air into Budapest in 2–4, with a Dubai Chamber-attested Certificate of Origin and a PED declaration above threshold. Four corridors reach Hungary and none wins outright, so we price the gate against your delivery town. Demand is automotive press lines, battery-plant dry rooms, refineries and the Danube.

Typical transit
Typically 21–28 days from dispatch via the Adriatic, sea and road combined
Freight
Sea freight from Jebel Ali through Suez to Koper or Rijeka, then road · Constanța and the eastern corridor for the Great Plain · Hamburg where the northern gate suits · Air freight into Budapest where the schedule is tighter
Incoterms 2020
DAP to the buyer’s site · CIF Koper · FOB Jebel Ali · EXW Dubai for a nominated forwarder
Documentation
CE marking and the PED declaration where the assembly is above threshold · REACH position on the elastomer compounds · Certificate of Origin, Dubai Chamber attested · EU customs entry raised at the port
Fig. 01 · Export lane DXB → HUMercator · WGS 84
SLOVAKIASLOVENIACROATIAAUSTRIAKOPER · PORTBUDAPESTGYŐRSZÉKESFEHÉRVÁRDUNAÚJVÁROSPÉCSKECSKEMÉTDEBRECENMISKOLC14°E16°E18°E20°E22°E46°N48°NN100 KMSEA + ROAD · 8,630 KM · FROM JEBEL ALI · DXB
Port of entryDelivery citysea + road corridor from JEBEL ALI · DXB
Origin
Jebel Ali · Dubai
Primary mode
Sea + road
Port of entry
Koper, then road
Transit
21–28 days
Quoted in
EUR
Docs prepared
Before the vessel sails
Warehouse aisle with racked reels of hydraulic hose on one side and bins of steel hose fittings and adapters on the other

01 · Stock

Stock held in Dubai, not drop-shipped from a factory queue.

Technician in safety glasses crimping a steel fitting onto a hydraulic hose, tagged assemblies and a pressure-test cabinet behind

02 · Assembly

Assemblies crimped and pressure-tested before they are packed.

Export documents and certificates fanned out on a desk beside a rubber stamp, a pen and a hydraulic hose fitting

03 · Documents

Conformity set for Hungary prepared while the order is picked.

Flatbed trailer loaded with shrink-wrapped hydraulic hose coils and cartons, strapped down at a warehouse yard gate

04 · Dispatch

One consignment, one set of documents, tracking on dispatch.

Catalogue · 21 clusters · 289 ranges

What we supply to Hungary

Browse the full catalogue

Everything below ships from the same Dubai warehouse, so a mixed order travels as one consignment under one set of documents. Open any card for its full list of ranges, or follow a heading through to specifications and an RFQ.

Hydraulic hose, fittings and adapters — wire-braid, spiral, compact and thermoplastic hose, crimp fittings and ferrules, SAE J518 flanges, quick couplers, and DIN 2353, BSP, JIC 37°, ORFS, metric and NPT thread forms. Carbon steel and SS316L.

Show all 77 Hoses & Fittings ranges

Industrial hoses for air, water, food, oil, chemical, steam and abrasive applications. Own-brand Indus rubber and PVC lines alongside engineered metallic and PTFE hose assemblies.

Shackles, hooks, lifting chain, wire rope, slings, hoists and blocks for lifting and rigging — each size under an Indus part number, with the working load limit wherever the manufacturer rates it. Supplied from Dubai with the manufacturer's test certificate.

Wellhead, frac, and process oilfield valves — ball, gate, check, plug, choke, globe, butterfly, surface safety (SSV/ESD), pressure relief, instrumentation. API 6A / 6D / 16C, sour and standard service.

WECO frac iron, integral fittings, hammer unions, swivel joints, manifolds, API 6A flanges, wellhead systems, and surface test trees for upstream oil and gas. 1K to 20K psi, sour and standard service. FMC / Cameron / SPM / Anson / NOV / Stream-Flo / Indus.

DEMCO resilient-seated butterfly valves from 2″ to 36″ with actuators, gear operators and handles, Victaulic grooved butterfly valves, industrial and high-pressure hydraulic ball valves, and Yuken CETOP 3 solenoid directional, relief and modular valves.

Annular and ram blowout preventers built to the Hydril GK and Cameron U patterns, ram blocks, control units, choke & kill manifolds, diverters, drilling spools and BOP spares for onshore and offshore drilling, with sour-service (NACE MR0175) construction.

Oilfield instrumentation & controls — data acquisition, flowmeters (magnetic / turbine / Coriolis), pressure sensors, gauges, thermometers, AC/DC converters, VFD systems, ex-proof electrical panels.

Surface well-testing packages — 3-phase separators, MPFM systems, surge tanks, KO drums, flare stacks, test pumps, sand filters, ESD panels, data headers, piping packages.

Frac fleet equipment — pumpers up to 3,000 HP, transfer pumps, missiles, sand silos, blenders, hydration units, LAS, data vans, and frac tanks.

Enerpac torque wrenches, bolt tensioners, flange tools, jacks, pullers, presses and cutters, Stanley hydraulic power tools and Pierce winches, listed by series with every model number.

Export quote · HU

Send the part list for Hungary

Part numbers if you have them; bore, thread and pressure if you do not. A photo of the failed part is usually enough.

One line per item. Quantities and lengths help us quote from stock.

Drag and drop, or

PDF · JPG · PNG · HEIC · STEP · DWG — up to 25 MB each, 6 files

0 attachments ready

Standards

Standards we supply and certify against for Hungary

StandardTypesApplies to
EN 8531SN · 2SNWire-braid hydraulic hose
EN 8564SP · 4SHSpiral-wire hydraulic hose
EN 8571SC · 2SCCompact wire-braid hose
SAE J517100R1 · R2 · R12 · R13 · R15SAE hydraulic hose series
ISO 18752Grades A–DPerformance-based hose classification
API 16CChoke & killWell control flexible lines
API 7KRotary & vibratorDrilling hose
API 6APSL 1–4Wellhead equipment
DIN 2353L · S seriesBite-type tube couplings
ISO 8434-124° coneMetric tube connections
ISO 6162 / 12151Code 61 · 62SAE flange and hose connections
EN 14420-5ClampedIndustrial hose couplings
NACE MR0175ISO 15156Sour-service materials
ISO 9001:2015CertifiedQuality management system

Customs

Tariff lines we declare under

  • 4009.22Rubber tube, reinforced with metal, with fittingsHydraulic hose assemblies
  • 4009.42Rubber tube, reinforced with other materials, with fittingsIndustrial hose assemblies
  • 7307.91Flanges, iron or steelSAE and API flanges
  • 7307.99Tube and pipe fittings, iron or steelAdapters, nipples, couplings
  • 8481.80Taps, cocks, valves and similar appliancesBall, gate, butterfly, needle
  • 8413.60Rotary positive displacement pumpsGear and vane pumps
  • 8412.21Hydraulic power engines, linear actingCylinders
  • 3403.99Lubricating preparationsGreases, pastes, compounds

Classification is confirmed line by line at quotation. This is the set most consignments to Hungary are declared under.

Freight

Three ways in, priced per shipment

Sea + road, Adriatic21–28 days
Koper or Rijeka, then roadDefault, and best for the west
Air freight2–4 days
DXB to BUDWhen the line is down
Sea + road, eastern24–32 days
Constanța and the corridor westDebrecen and the Great Plain

Sequence

How an order to Hungary works

  1. 01Send the part numbers, or the bore, thread and pressure if you do not have them. A photo of the failed part is usually enough.
  2. 02We quote in EUR against real stock, with the Incoterm stated on the Estimate rather than assumed.
  3. 03The gate is priced against the delivery town rather than defaulted, because four corridors reach Hungary and the cheapest is not the same one twice running.
  4. 04Goods sail from Jebel Ali through Suez to the Adriatic and come on by road, and you get the paperwork and tracking together.

Industries

Who we supply in Hungary

Delivery coverage

Cities and sites we deliver to in Hungary

DAP deliveries go to the site gate. Coordinates are given because project sites are easier to name that way than by address.

16 locations listed

  • Budapest

    Budapest

  • Győr

    Western Transdanubia

  • Sopron

    Western Transdanubia

  • Székesfehérvár

    Central Transdanubia

  • Veszprém

    Central Transdanubia

  • Dunaújváros

    Central Transdanubia

  • Pécs

    Southern Transdanubia

  • Kecskemét

    Southern Great Plain

  • Szeged

    Southern Great Plain

  • Debrecen

    Northern Great Plain

  • Nyíregyháza

    Northern Great Plain

  • Miskolc

    Northern Hungary

  • Kazincbarcika

    Northern Hungary

  • Tiszaújváros

    Northern Hungary

  • Százhalombatta

    Pest

  • Esztergom

    Central Hungary

Questions we get asked

Supplying Hungary, in detail

01

For a plant in Debrecen, is Constanța a better gate than Koper?

Often it is genuinely arguable, which is why we price both. Koper or Rijeka and road typically takes 21–28 days and is clearly best for Győr and the west; Constanța and the corridor west typically takes 24–32 days but shortens the road leg to Debrecen and the Great Plain. Hamburg is a third option. Whichever gate wins, the importer clears once into free circulation and the rest is domestic movement.

02

When does Danube barge from Constanța make sense for Hungarian cargo?

For heavy and project cargo, where the river changes the arithmetic. Sea to Constanța and barge upriver suits loads that are awkward or expensive by road. For line consumables and urgent spares, the Adriatic and road is faster, typically 21–28 days, and air into Budapest takes 2–4. We say at quotation which suits the order rather than defaulting to one.

03

What should a battery plant in Debrecen or Göd tell you about a dry-room hose line?

Which solvent is present, the humidity class of the room and whether the line serves a coating or electrolyte process. In a dry room a hose must be compatible with the solvent, must not carry moisture in and must not shed anything — constraints that rarely appear on a hydraulic specification. We specify against those conditions rather than against pressure alone, and say plainly where a compound is unsuitable.

04

How do you specify hose for a takt-time press line in Győr or Kecskemét?

From the cycles per hour and the planned service interval rather than the part number. On a takt-time line the cost of a failure is the stoppage, not the component, so impulse rating and fitting choice matter more than nominal pressure. Send the line duty and existing assembly data and we quote assemblies that last to your next planned stop.

05

Below the PED threshold, what paperwork comes with a hose assembly for a Hungarian plant?

No CE mark — below the pressure-volume threshold in PED 2014/68/EU sound engineering practice applies — but the consignment still carries our REACH position on the elastomer compounds, given at quotation, and a Dubai Chamber-attested Certificate of Origin. Above the threshold we issue the declaration of conformity as the assembler and it travels with the goods. The importer raises one EU entry at the port.

06

Which route do wellhead and valve orders for the Algyő field near Szeged take?

Whichever gate prices best to Szeged — we compare the Constanța corridor, typically 24–32 days, with Koper or Rijeka and road, typically 21–28 days. We supply TechnipFMC, Cameron (SLB), SPM, Anson, Stream-Flo and WOM equipment, plus industrial hose and flow lines for onshore production, and the document set the operator requires is confirmed at quotation. The importer clears once at the port of entry.

07

Do Hungarian consignments come through Rijeka as well as Koper?

Yes. Both are Adriatic gates for Hungary, typically 21–28 days from Jebel Ali, sea and road combined, and we pick between them by sailing and by the road leg to your town rather than by habit. Either way the importer enters the goods once into free circulation at the port and the run into Hungary is domestic movement. For Debrecen and the Great Plain, Constanța is priced as well.

08

What should Paks or the Mátra power station tell you before you quote conventional-plant hydraulics?

The qualification and documents the site requires, alongside the assembly data. For conventional plant — actuators, governors, turbine-hall and materials-handling hydraulics — we supply to the specification the plant issues, and at Visonta that includes the lignite handling fleet. We confirm the document set at quotation, and where a requirement is beyond what we can certify, we say so before you order rather than after.

09

Which hose compound can run on an NMP cathode-coating line at a Hungarian battery plant?

One specified against the solvent, not against pressure alone — tell us the solvent, its concentration and temperature, and whether the line enters the dry room. NMP and similar solvents attack materials that are stable elsewhere, so we confirm the compound and lining at quotation, give our REACH position on it, and say plainly if nothing we can supply is suitable rather than ship a near match.

10

Do you supply crane and hatch hydraulics for the Danube river ports at Csepel and Győr-Gönyű?

Yes — crane, hatch, winch and steering hydraulics for the river ports and the Danube barge fleet working them. Heavy project items for a port can travel by barge from Constanța, while urgent spares come faster by sea and road via Koper or Rijeka, typically 21–28 days, or by air into Budapest in 2–4.

Next step

Shipping to Hungary?

Send the part numbers, or the bore, thread and pressure if you do not have them. We quote from real stock, in EUR, with the Incoterm stated rather than assumed.

Plant-down? Call +971 52 2477942 — 24/7

Quick enquiry

RFQ · HU

No account needed. We reply from the Dubai export desk.

Other export markets · 126 destinations

We run the same lane from Dubai to 125 other markets

All export markets