Skip to content
+971 52 2477942
Lane DXB → DEDeutschland

Export from Dubai

DE

Hydraulic & industrial hose supplier in Germany

Indus Hydraulics ships from Jebel Ali to Hamburg or Bremerhaven by sea through Suez in 24–30 days, or via Rotterdam in 22–28 days for the west and south, with air freight into Frankfurt in 2–4 days and the PED declaration where an assembly is above threshold. Germany makes more hydraulics than it imports, so for a standard DIN fitting we are the wrong supplier. What German plants ask us for is the pattern their export machines need — GOST couplings, API-monogrammed assemblies, SS316L thread forms — held as stock.

Typical transit
Typically 24–30 days by sea from dispatch
Freight
Sea freight from Jebel Ali through Suez to Hamburg or Bremerhaven · Rotterdam and Antwerp where the inland leg is shorter · Air freight into Frankfurt where the schedule is tighter
Incoterms 2020
CIF Hamburg · DAP to the buyer’s site · FOB Jebel Ali · EXW Dubai for a nominated forwarder
Documentation
CE marking and the PED declaration where the assembly is above threshold · REACH position on the elastomer compounds · Certificate of Origin, Dubai Chamber attested · EU customs entry raised by the importer
Fig. 01 · Export lane DXB → DEMercator · WGS 84
NETHERLANDSCZECHIABELGIUMAUSTRIAHAMBURG · PORTBREMERHAVENDUISBURGFRANKFURTSTUTTGARTMUNICHLEIPZIGBERLINROSTOCK5°E10°E15°E50°N55°NN200 KMSEA · SUEZ · 12,100 KM · FROM JEBEL ALI · DXB
Port of entryDelivery citysea · suez corridor from JEBEL ALI · DXB
Origin
Jebel Ali · Dubai
Primary mode
Sea, via Suez
Port of entry
Hamburg
Transit
24–30 days
Quoted in
EUR
Docs prepared
Before the vessel sails
Warehouse aisle with racked reels of hydraulic hose on one side and bins of steel hose fittings and adapters on the other

01 · Stock

Stock held in Dubai, not drop-shipped from a factory queue.

Technician in safety glasses crimping a steel fitting onto a hydraulic hose, tagged assemblies and a pressure-test cabinet behind

02 · Assembly

Assemblies crimped and pressure-tested before they are packed.

Export documents and certificates fanned out on a desk beside a rubber stamp, a pen and a hydraulic hose fitting

03 · Documents

Conformity set for Germany prepared while the order is picked.

Flatbed trailer loaded with shrink-wrapped hydraulic hose coils and cartons, strapped down at a warehouse yard gate

04 · Dispatch

One consignment, one set of documents, tracking on dispatch.

Catalogue · 21 clusters · 289 ranges

What we supply to Germany

Browse the full catalogue

Everything below ships from the same Dubai warehouse, so a mixed order travels as one consignment under one set of documents. Open any card for its full list of ranges, or follow a heading through to specifications and an RFQ.

Hydraulic hose, fittings and adapters — wire-braid, spiral, compact and thermoplastic hose, crimp fittings and ferrules, SAE J518 flanges, quick couplers, and DIN 2353, BSP, JIC 37°, ORFS, metric and NPT thread forms. Carbon steel and SS316L.

Show all 77 Hoses & Fittings ranges

Industrial hoses for air, water, food, oil, chemical, steam and abrasive applications. Own-brand Indus rubber and PVC lines alongside engineered metallic and PTFE hose assemblies.

Shackles, hooks, lifting chain, wire rope, slings, hoists and blocks for lifting and rigging — each size under an Indus part number, with the working load limit wherever the manufacturer rates it. Supplied from Dubai with the manufacturer's test certificate.

Wellhead, frac, and process oilfield valves — ball, gate, check, plug, choke, globe, butterfly, surface safety (SSV/ESD), pressure relief, instrumentation. API 6A / 6D / 16C, sour and standard service.

WECO frac iron, integral fittings, hammer unions, swivel joints, manifolds, API 6A flanges, wellhead systems, and surface test trees for upstream oil and gas. 1K to 20K psi, sour and standard service. FMC / Cameron / SPM / Anson / NOV / Stream-Flo / Indus.

DEMCO resilient-seated butterfly valves from 2″ to 36″ with actuators, gear operators and handles, Victaulic grooved butterfly valves, industrial and high-pressure hydraulic ball valves, and Yuken CETOP 3 solenoid directional, relief and modular valves.

Annular and ram blowout preventers built to the Hydril GK and Cameron U patterns, ram blocks, control units, choke & kill manifolds, diverters, drilling spools and BOP spares for onshore and offshore drilling, with sour-service (NACE MR0175) construction.

Oilfield instrumentation & controls — data acquisition, flowmeters (magnetic / turbine / Coriolis), pressure sensors, gauges, thermometers, AC/DC converters, VFD systems, ex-proof electrical panels.

Surface well-testing packages — 3-phase separators, MPFM systems, surge tanks, KO drums, flare stacks, test pumps, sand filters, ESD panels, data headers, piping packages.

Frac fleet equipment — pumpers up to 3,000 HP, transfer pumps, missiles, sand silos, blenders, hydration units, LAS, data vans, and frac tanks.

Enerpac torque wrenches, bolt tensioners, flange tools, jacks, pullers, presses and cutters, Stanley hydraulic power tools and Pierce winches, listed by series with every model number.

Export quote · DE

Send the part list for Germany

Part numbers if you have them; bore, thread and pressure if you do not. A photo of the failed part is usually enough.

One line per item. Quantities and lengths help us quote from stock.

Drag and drop, or

PDF · JPG · PNG · HEIC · STEP · DWG — up to 25 MB each, 6 files

0 attachments ready

Standards

Standards we supply and certify against for Germany

StandardTypesApplies to
EN 8531SN · 2SNWire-braid hydraulic hose
EN 8564SP · 4SHSpiral-wire hydraulic hose
EN 8571SC · 2SCCompact wire-braid hose
SAE J517100R1 · R2 · R12 · R13 · R15SAE hydraulic hose series
ISO 18752Grades A–DPerformance-based hose classification
API 16CChoke & killWell control flexible lines
API 7KRotary & vibratorDrilling hose
API 6APSL 1–4Wellhead equipment
DIN 2353L · S seriesBite-type tube couplings
ISO 8434-124° coneMetric tube connections
ISO 6162 / 12151Code 61 · 62SAE flange and hose connections
EN 14420-5ClampedIndustrial hose couplings
NACE MR0175ISO 15156Sour-service materials
ISO 9001:2015CertifiedQuality management system

Customs

Tariff lines we declare under

  • 4009.22Rubber tube, reinforced with metal, with fittingsHydraulic hose assemblies
  • 4009.42Rubber tube, reinforced with other materials, with fittingsIndustrial hose assemblies
  • 7307.91Flanges, iron or steelSAE and API flanges
  • 7307.99Tube and pipe fittings, iron or steelAdapters, nipples, couplings
  • 8481.80Taps, cocks, valves and similar appliancesBall, gate, butterfly, needle
  • 8413.60Rotary positive displacement pumpsGear and vane pumps
  • 8412.21Hydraulic power engines, linear actingCylinders
  • 3403.99Lubricating preparationsGreases, pastes, compounds

Classification is confirmed line by line at quotation. This is the set most consignments to Germany are declared under.

Freight

Three ways in, priced per shipment

Sea, FCL24–30 days
Jebel Ali to Hamburg, via SuezDefault for most orders
Air freight2–4 days
DXB to FRAWhen the line is down
Sea via Rotterdam22–28 days
Rotterdam, then road for the west and southWhen the inland leg is shorter

Sequence

How an order to Germany works

  1. 01Send the part numbers, or the bore, thread and pressure if you do not have them. A photo of the failed part is usually enough.
  2. 02We quote in EUR against real stock, with the Incoterm stated on the Estimate rather than assumed.
  3. 03The CE declaration is prepared where the assembly is above the PED threshold, and the pattern and thread form are confirmed against the drawing rather than the part description.
  4. 04Goods sail from Jebel Ali through Suez, and you get the paperwork and tracking together.

Industries

Who we supply in Germany

Delivery coverage

Cities and sites we deliver to in Germany

DAP deliveries go to the site gate. Coordinates are given because project sites are easier to name that way than by address.

16 locations listed

  • Hamburg

    Hamburg

  • Bremerhaven

    Bremen

  • Duisburg

    North Rhine-Westphalia

  • Essen

    North Rhine-Westphalia

  • Cologne

    North Rhine-Westphalia

  • Frankfurt

    Hesse

  • Mannheim

    Baden-Württemberg

  • Stuttgart

    Baden-Württemberg

  • Munich

    Bavaria

  • Nuremberg

    Bavaria

  • Leipzig

    Saxony

  • Dresden

    Saxony

  • Berlin

    Berlin

  • Hanover

    Lower Saxony

  • Wilhelmshaven

    Lower Saxony

  • Rostock

    Mecklenburg-Vorpommern

Questions we get asked

Supplying Germany, in detail

01

Is Indus the right supplier for a standard DIN fitting in Germany?

No, and we would rather say so. Germany manufactures hydraulic components to a standard nobody needs to import against, and a plant that wants a DIN fitting tomorrow should buy it locally. We are useful for the exception: a machine built here for a market with a different standard, where GOST couplings, API monograms or SS316L thread forms are a factory order locally and held stock for us.

02

We build machines for a customer in the CIS — what should we send you to get the fittings right?

The drawing and the destination standard, not a part number. A German catalogue number tells us what the machine would carry in Europe; the contract decides what it must carry where it is going. We hold GOST-pattern couplings alongside DIN, BSP, JIC and ORFS ranges, so a machine for a GOST market can be plumbed from one order rather than two suppliers.

03

Will every hose assembly on our order carry a CE mark?

No — only those above the pressure-volume threshold in PED 2014/68/EU, and for those the declaration of conformity travels with the goods. Below the threshold the directive requires sound engineering practice and no mark. We state which side each line falls on at quotation, so your technical file shows a reason for every assembly rather than a blanket mark.

04

Should our container land at Hamburg, Bremerhaven or Rotterdam?

Whichever gives the shorter road leg to your plant. Hamburg and Bremerhaven take 24–30 days from Jebel Ali; Rotterdam takes 22–28 days and usually suits the Ruhr, the Rhineland and the south. Clearance is the same either way — the goods enter free circulation once and move on as domestic movement — so the port is chosen on distance, not customs.

05

Do you state the REACH position on elastomer compounds for German orders?

Yes, at quotation. We state our position on the elastomer compounds supplied, and where one carries a restriction relevant to your application we say so and offer the alternative rather than shipping and leaving you to discover it at goods-in. The statement sits in the quotation file alongside the PED position for each assembly.

06

Which API-monogrammed items can a German packager source from you?

API 6A wellhead equipment, API 16A BOP, API 16C choke-and-kill and API 7K drilling hose, with NACE MR0175 material documentation where the contract requires it. We supply TechnipFMC, Cameron (SLB), SPM, Anson, Stream-Flo and WOM equipment. For a skid or package built in Germany for export, send the datasheet and the end user’s named standards at quotation.

07

Could you hold DIN spares in Dubai for machines we have sold into the Gulf?

It is worth a conversation, whether or not you order today. German machines working in the Gulf, Africa and Central Asia are supported from Europe by air freight and a week; from Dubai the same spare is often a same-day matter. Send the fitting and hose specifications your installed base uses and we will tell you what we already hold and what holding more would involve.

08

How long does sea freight from Jebel Ali to Hamburg take?

Typically 24–30 days for a full container, through Suez to Hamburg or Bremerhaven. Routing via Rotterdam takes 22–28 days and then road for the west and south. When a line is down, air freight from Dubai to Frankfurt takes 2–4 days. We quote the route against your delivery address, CIF Hamburg or DAP to the site.

09

Can you deliver DAP to a plant in the Ruhr or to Wilhelmshaven?

Yes. The leg from the port of entry is domestic movement under the customs union and it is priced with the order. For the Ruhr, a Rotterdam landing is usually the shorter road leg; for Wilhelmshaven and the north, Hamburg or Bremerhaven. Give us the site address and goods-in hours and the delivery is quoted to the gate.

10

What does the importer need from us to clear goods into Germany?

The importer raises the EU entry into free circulation at the port of entry; we supply the commercial invoice, packing list, a Dubai Chamber attested Certificate of Origin, the PED declaration where an assembly is above threshold, our REACH position on the compounds, and material and test certificates where the order calls for them. The file is complete before the vessel sails.

11

How do you check an SS316L or GOST fitting against our drawing?

Against the drawing, not the part description. The pattern and thread form are confirmed line by line before dispatch, because a description that matches and a thread that does not is the commonest reason an export machine fails at commissioning. Send the drawing revision with the enquiry, and flag any line where the destination standard differs from the German catalogue part.

12

Do you supply lay flat hose and slurry drag hose to Germany?

Yes. TPU slurry supply and drag hose goes to German contractors for trailing-hose and injection spreading, and large-bore lay flat hose for dewatering, flood pumping and temporary water lines, with Storz, grooved and flanged couplings in sizes up to 16". Hose ships from Dubai as bulk coils up to 400 m or as made-up assemblies with couplings fitted, with the size table and pressure rating for each bore.

From the blog

Guides for buyers in Germany

Industrial hose

Concrete placement hose: pressure classes, pump pressures and hose whip

Concrete pumps work at pressures that would burst most hose, and the flexible end hose is where crews stand. How boom and line pumps differ, what pressure the placement hose actually sees, how to choose between standard and high-pressure classes, and how to prevent the most dangerous event on a pour — hose whip.

4 min read

Industrial hose

Fire hose standards compared: EN 14540, EN 671, BS 6391, DIN 14811 and NFPA

A fire hose tender can ask for EN 14540, BS 6391, DIN 14811, EN 694 or NFPA 1961 — and they are not interchangeable. Each covers a different kind of hose for a different user. A plain map of the European, British, German and American standards for lay flat and reel hose, what each one covers, and how to specify against them.

5 min read

Industrial hose

Flood response pumping: lay flat hose for high-volume pumps, from Dubai to the Ahr valley

Floods are a pumping problem measured in thousands of cubic metres an hour. The pumps get the attention; the hose decides how much of that water actually leaves. Lessons from the 2024 UAE and Oman floods and the 2021 floods in Germany and Belgium, how high-volume pumping units are equipped, and how to size and stock lay flat hose for flood response.

5 min read

Industrial hose

Low-emission slurry spreading rules in Europe: Ireland, Germany, Denmark, the Netherlands and the UK

Splash plates are on their way out across north-west Europe. Ireland’s LESS rules now reach farms above 100 kg organic N per hectare; Germany requires strip application on grassland from February 2025; Denmark and the Netherlands have required low-emission methods for years; Scotland bans splash plates and goes further in 2027. What each country requires, which equipment counts, and what it means for hose.

5 min read

Next step

Shipping to Germany?

Send the part numbers, or the bore, thread and pressure if you do not have them. We quote from real stock, in EUR, with the Incoterm stated rather than assumed.

Plant-down? Call +971 52 2477942 — 24/7

Quick enquiry

RFQ · DE

No account needed. We reply from the Dubai export desk.

Other export markets · 126 destinations

We run the same lane from Dubai to 125 other markets

All export markets