Skip to content
+971 52 2477942
Lane DXB → KHកម្ពុជា

Export from Dubai

KH

Hydraulic & industrial hose supplier in Cambodia

Indus Hydraulics ships hydraulic hose, fittings, valves and industrial hose from Jebel Ali to Phnom Penh and the rest of Cambodia by two sea routes — transhipped into Sihanoukville in 24–32 days, or into Cai Mep in Vietnam and overland through Bavet in 22–28 — and by air into Phnom Penh in 4–6 days. Direct Gulf calls at Sihanoukville are infrequent, so we price both and ship the faster one. There is no general pre-shipment conformity scheme; the decision is the route, and for second-hand machines, measuring what is actually fitted.

Typical transit
Typically 24–32 days by sea to Sihanoukville, transhipped · 22–28 days via Cai Mep and Bavet · 4–6 days by air into Phnom Penh
Freight
Sea freight from Jebel Ali to Sihanoukville, transhipped · Or to Ho Chi Minh City and overland through Bavet, often faster · Air freight into Phnom Penh where the schedule is tighter
Incoterms 2020
CIF Sihanoukville · DAP to the buyer’s site · FOB Jebel Ali · EXW Dubai for a nominated forwarder
Documentation
Customs declaration raised by the importer · Vietnamese transit documents where the routing is overland · Certificate of Origin, Dubai Chamber attested
Fig. 01 · Export lane DXB → KHMercator · WGS 84
SIHANOUKVILLEPHNOM PENHKAMPOTKOH KONGBAVETKAMPONG CHAMBATTAMBANGSIEM REAP102°E104°E106°E108°E12°N14°NN100 KMSEA · TRANSHIP · 7,430 KM · FROM JEBEL ALI · DXB
Port of entryDelivery citysea · tranship corridor from JEBEL ALI · DXB
Origin
Jebel Ali · Dubai
Primary mode
Sea, transhipped
Port of entry
Sihanoukville
Transit
24–32 days
Quoted in
USD
Docs prepared
Before the vessel sails
Warehouse aisle with racked reels of hydraulic hose on one side and bins of steel hose fittings and adapters on the other

01 · Stock

Stock held in Dubai, not drop-shipped from a factory queue.

Technician in safety glasses crimping a steel fitting onto a hydraulic hose, tagged assemblies and a pressure-test cabinet behind

02 · Assembly

Assemblies crimped and pressure-tested before they are packed.

Export documents and certificates fanned out on a desk beside a rubber stamp, a pen and a hydraulic hose fitting

03 · Documents

Conformity set for Cambodia prepared while the order is picked.

Flatbed trailer loaded with shrink-wrapped hydraulic hose coils and cartons, strapped down at a warehouse yard gate

04 · Dispatch

One consignment, one set of documents, tracking on dispatch.

Catalogue · 21 clusters · 289 ranges

What we supply to Cambodia

Browse the full catalogue

Everything below ships from the same Dubai warehouse, so a mixed order travels as one consignment under one set of documents. Open any card for its full list of ranges, or follow a heading through to specifications and an RFQ.

Hydraulic hose, fittings and adapters — wire-braid, spiral, compact and thermoplastic hose, crimp fittings and ferrules, SAE J518 flanges, quick couplers, and DIN 2353, BSP, JIC 37°, ORFS, metric and NPT thread forms. Carbon steel and SS316L.

Show all 77 Hoses & Fittings ranges

Industrial hoses for air, water, food, oil, chemical, steam and abrasive applications. Own-brand Indus rubber and PVC lines alongside engineered metallic and PTFE hose assemblies.

Shackles, hooks, lifting chain, wire rope, slings, hoists and blocks for lifting and rigging — each size under an Indus part number, with the working load limit wherever the manufacturer rates it. Supplied from Dubai with the manufacturer's test certificate.

Wellhead, frac, and process oilfield valves — ball, gate, check, plug, choke, globe, butterfly, surface safety (SSV/ESD), pressure relief, instrumentation. API 6A / 6D / 16C, sour and standard service.

WECO frac iron, integral fittings, hammer unions, swivel joints, manifolds, API 6A flanges, wellhead systems, and surface test trees for upstream oil and gas. 1K to 20K psi, sour and standard service. FMC / Cameron / SPM / Anson / NOV / Stream-Flo / Indus.

DEMCO resilient-seated butterfly valves from 2″ to 36″ with actuators, gear operators and handles, Victaulic grooved butterfly valves, industrial and high-pressure hydraulic ball valves, and Yuken CETOP 3 solenoid directional, relief and modular valves.

Annular and ram blowout preventers built to the Hydril GK and Cameron U patterns, ram blocks, control units, choke & kill manifolds, diverters, drilling spools and BOP spares for onshore and offshore drilling, with sour-service (NACE MR0175) construction.

Oilfield instrumentation & controls — data acquisition, flowmeters (magnetic / turbine / Coriolis), pressure sensors, gauges, thermometers, AC/DC converters, VFD systems, ex-proof electrical panels.

Surface well-testing packages — 3-phase separators, MPFM systems, surge tanks, KO drums, flare stacks, test pumps, sand filters, ESD panels, data headers, piping packages.

Frac fleet equipment — pumpers up to 3,000 HP, transfer pumps, missiles, sand silos, blenders, hydration units, LAS, data vans, and frac tanks.

Enerpac torque wrenches, bolt tensioners, flange tools, jacks, pullers, presses and cutters, Stanley hydraulic power tools and Pierce winches, listed by series with every model number.

Export quote · KH

Send the part list for Cambodia

Part numbers if you have them; bore, thread and pressure if you do not. A photo of the failed part is usually enough.

One line per item. Quantities and lengths help us quote from stock.

Drag and drop, or

PDF · JPG · PNG · HEIC · STEP · DWG — up to 25 MB each, 6 files

0 attachments ready

Standards

Standards we supply and certify against for Cambodia

StandardTypesApplies to
EN 8531SN · 2SNWire-braid hydraulic hose
EN 8564SP · 4SHSpiral-wire hydraulic hose
EN 8571SC · 2SCCompact wire-braid hose
SAE J517100R1 · R2 · R12 · R13 · R15SAE hydraulic hose series
ISO 18752Grades A–DPerformance-based hose classification
API 16CChoke & killWell control flexible lines
API 7KRotary & vibratorDrilling hose
API 6APSL 1–4Wellhead equipment
DIN 2353L · S seriesBite-type tube couplings
ISO 8434-124° coneMetric tube connections
ISO 6162 / 12151Code 61 · 62SAE flange and hose connections
EN 14420-5ClampedIndustrial hose couplings
NACE MR0175ISO 15156Sour-service materials
ISO 9001:2015CertifiedQuality management system

Customs

Tariff lines we declare under

  • 4009.22Rubber tube, reinforced with metal, with fittingsHydraulic hose assemblies
  • 4009.42Rubber tube, reinforced with other materials, with fittingsIndustrial hose assemblies
  • 7307.91Flanges, iron or steelSAE and API flanges
  • 7307.99Tube and pipe fittings, iron or steelAdapters, nipples, couplings
  • 8481.80Taps, cocks, valves and similar appliancesBall, gate, butterfly, needle
  • 8413.60Rotary positive displacement pumpsGear and vane pumps
  • 8412.21Hydraulic power engines, linear actingCylinders
  • 3403.99Lubricating preparationsGreases, pastes, compounds

Classification is confirmed line by line at quotation. This is the set most consignments to Cambodia are declared under.

Freight

Three ways in, priced per shipment

Sea, FCL24–32 days
Jebel Ali to Sihanoukville, transhippedDefault for full loads
Air freight4–6 days
DXB to PNHWhen the line is down
Sea + road via Vietnam22–28 days
Cai Mep, then overland through BavetOften the faster route

Sequence

How an order to Cambodia works

  1. 01Send the part numbers, or the bore, thread and pressure if you do not have them. A photo of the failed part is usually enough.
  2. 02We quote in USD against real stock, with the Incoterm stated on the Estimate rather than assumed.
  3. 03The routing is fixed against the actual sailing schedule — Sihanoukville direct or Ho Chi Minh City and overland — and the transit documents follow whichever we choose.
  4. 04Goods sail from Jebel Ali, and you get the paperwork and tracking together.

Industries

Who we supply in Cambodia

Delivery coverage

Cities and sites we deliver to in Cambodia

DAP deliveries go to the site gate. Coordinates are given because project sites are easier to name that way than by address.

12 locations listed

  • Phnom Penh

    Phnom Penh

  • Sihanoukville

    Preah Sihanouk

  • Kandal

    Kandal

  • Takeo

    Takeo

  • Kampot

    Kampot

  • Koh Kong

    Koh Kong

  • Bavet

    Svay Rieng

  • Svay Rieng

    Svay Rieng

  • Kampong Cham

    Kampong Cham

  • Battambang

    Battambang

  • Siem Reap

    Siem Reap

  • Poipet

    Banteay Meanchey

Questions we get asked

Supplying Cambodia, in detail

01

Sihanoukville or overland from Vietnam — which is faster for Phnom Penh?

Whichever the sailing schedule favours for that order, and it is often the overland route. Direct calls at Sihanoukville from the Gulf are infrequent, so a container can wait longer for a feeder than the road leg from Cai Mep takes. Sihanoukville typically runs 24–32 days transhipped; Cai Mep and overland through Bavet runs 22–28 days. We price both rather than defaulting to the national port.

02

What is the full transit from Dubai to Cambodia by each route?

By sea to Sihanoukville, transhipped, typically 24–32 days from dispatch. By sea to Cai Mep, then road through the Bavet border to Phnom Penh, typically 22–28 days. By air from DXB to Phnom Penh (PNH), 4–6 days, for a line that is down. The quotation names the route chosen and the reason, so you can see why one was preferred for that order.

03

Is there a Cambodian equivalent of TISI or SNI for hydraulic hose?

No. Cambodia has no general pre-shipment conformity scheme for industrial hose, fittings and adapters, and no product certificate to obtain before shipment. The file is the commercial invoice, the packing list, a Certificate of Origin attested by the Dubai Chamber and a clean customs declaration. That leaves the routing, not the paperwork, as the decision that sets the arrival date.

04

What is a Cambodian import declaration filed against?

Our commercial invoice and packing list, lodged by the importer through the General Department of Customs before the goods arrive. It is supported by the Dubai Chamber attested Certificate of Origin, and material and test certificates where the order calls for them. On the overland routing the Vietnamese transit documents must match the same invoice line for line, so we prepare the whole set together.

05

What must be settled before a container leaves Cai Mep for Bavet?

The delivery town and confirmation that you can clear at Bavet. If the overland routing is the faster one, the Vietnamese transit documents are raised by the forwarder at Cai Mep and have to be ready before the container leaves the port. Give us both at enquiry and the transit file is arranged alongside the order rather than after the vessel arrives in Vietnam.

06

How long is the road leg from Cai Mep to Phnom Penh?

About a day on the road once the goods are cleared, Ho Chi Minh City to Phnom Penh. The variable is the Bavet crossing rather than the distance: a file that matches line for line moves; one that does not waits. That is why we quote the leg as part of the route, rather than adding an estimate to the sea time.

07

Can you deliver to factories in the Phnom Penh or Sihanoukville special economic zones?

Yes, on DAP terms to the factory gate. Phnom Penh zones are usually reached via Cai Mep and Bavet, Sihanoukville zones from the port itself, and either leg is priced at quotation rather than estimated. Tell us the zone, the factory’s receiving hours and any gate-entry paperwork, and we pack and label the consignment so it can be booked straight into stores.

08

Our excavator came to Cambodia second-hand — should we order from the parts book?

No, measure what is actually fitted. A machine that has passed through several owners often carries substituted fittings, rerouted hoses or adapted ports, so the parts book describes a machine that no longer exists. Send dimensions or photographs of the part you are replacing, with the thread, seat and length between fitting faces. If they disagree with the manual we tell you, and the assembly is crimped and pressure-tested in Dubai.

09

Can you supply kiln and crusher hydraulics for Kampot cement plants?

Yes. Kampot is a short road leg from Sihanoukville, and delivery to the plant on DAP terms is priced at quotation. Kiln, crusher and loader hydraulics in cement and limestone quarry service run hot, dusty and continuous, so we specify hose cover, fittings and seals for abrasion, heat and cycle life as well as pressure, and supply the same construction on every reorder.

10

Do you supply slings and shackles for tower cranes and construction lifting in Phnom Penh?

Yes. Wire rope and chain slings, shackles, hooks and lifting hardware ship from Dubai marked with their working load limit and with the manufacturer’s test certificates the order calls for, on the same consignment as hydraulic parts. Any import document a lifting line needs we confirm at quotation. Inspection before use and the site’s lifting records remain with your appointed inspector.

11

Why might you advise holding a small Cambodian order for the next consignment?

Because there is no minimum order, but on a lane with infrequent sailings a small consignment can wait a long time for a feeder at Sihanoukville or for space on the overland move. Batching several lines into one consignment clears once and travels once. We say when an order is small enough to sit, rather than shipping something that will wait at a transhipment port.

Next step

Shipping to Cambodia?

Send the part numbers, or the bore, thread and pressure if you do not have them. We quote from real stock, in USD, with the Incoterm stated rather than assumed.

Plant-down? Call +971 52 2477942 — 24/7

Quick enquiry

RFQ · KH

No account needed. We reply from the Dubai export desk.

Other export markets · 126 destinations

We run the same lane from Dubai to 125 other markets

All export markets