Skip to content
+971 52 2477942
Lane DXB → ATÖsterreich

Export from Dubai

AT

Hydraulic & industrial hose supplier in Austria

Indus Hydraulics ships hydraulic hose, fittings and assemblies from Jebel Ali to Koper or Trieste and on by road to Austrian sites in typically 20–26 days, or by air into Vienna in 2–4, with a Dubai Chamber-attested Certificate of Origin and a PED declaration above threshold. Goods clear once at the port and travel on as domestic movement, with no transit document. Demand here comes from ropeway, tunnelling and forming-machine builders, often for a machine leaving Austria, and on passenger-carrying equipment we supply the originally specified part or say we cannot.

Typical transit
Typically 20–26 days via Koper or Trieste, sea and road combined · 26–34 days through Hamburg · 2–4 days by air into Vienna
Freight
Sea freight from Jebel Ali through Suez to Koper or Trieste, then road · Hamburg and the Rhine corridor where the northern gate suits · Air freight into Vienna where the schedule is tighter
Incoterms 2020
DAP to the buyer’s site · CIF Koper · FOB Jebel Ali · EXW Dubai for a nominated forwarder
Documentation
CE marking and the PED declaration where the assembly is above threshold · REACH position on the elastomer compounds · Certificate of Origin, Dubai Chamber attested · EU customs entry raised at the port
Fig. 01 · Export lane DXB → ATMercator · WGS 84
SLOVENIAKOPER · PORTVIENNAGRAZLINZSALZBURGINNSBRUCKBREGENZKLAGENFURT10°E12°E14°E16°E46°N48°NN100 KMSEA + ROAD · 8,310 KM · FROM JEBEL ALI · DXB
Port of entryDelivery citysea + road corridor from JEBEL ALI · DXB
Origin
Jebel Ali · Dubai
Primary mode
Sea + road
Port of entry
Koper, then road
Transit
20–26 days
Quoted in
EUR
Docs prepared
Before the vessel sails
Warehouse aisle with racked reels of hydraulic hose on one side and bins of steel hose fittings and adapters on the other

01 · Stock

Stock held in Dubai, not drop-shipped from a factory queue.

Technician in safety glasses crimping a steel fitting onto a hydraulic hose, tagged assemblies and a pressure-test cabinet behind

02 · Assembly

Assemblies crimped and pressure-tested before they are packed.

Export documents and certificates fanned out on a desk beside a rubber stamp, a pen and a hydraulic hose fitting

03 · Documents

Conformity set for Austria prepared while the order is picked.

Flatbed trailer loaded with shrink-wrapped hydraulic hose coils and cartons, strapped down at a warehouse yard gate

04 · Dispatch

One consignment, one set of documents, tracking on dispatch.

Catalogue · 21 clusters · 289 ranges

What we supply to Austria

Browse the full catalogue

Everything below ships from the same Dubai warehouse, so a mixed order travels as one consignment under one set of documents. Open any card for its full list of ranges, or follow a heading through to specifications and an RFQ.

Hydraulic hose, fittings and adapters — wire-braid, spiral, compact and thermoplastic hose, crimp fittings and ferrules, SAE J518 flanges, quick couplers, and DIN 2353, BSP, JIC 37°, ORFS, metric and NPT thread forms. Carbon steel and SS316L.

Show all 77 Hoses & Fittings ranges

Industrial hoses for air, water, food, oil, chemical, steam and abrasive applications. Own-brand Indus rubber and PVC lines alongside engineered metallic and PTFE hose assemblies.

Shackles, hooks, lifting chain, wire rope, slings, hoists and blocks for lifting and rigging — each size under an Indus part number, with the working load limit wherever the manufacturer rates it. Supplied from Dubai with the manufacturer's test certificate.

Wellhead, frac, and process oilfield valves — ball, gate, check, plug, choke, globe, butterfly, surface safety (SSV/ESD), pressure relief, instrumentation. API 6A / 6D / 16C, sour and standard service.

WECO frac iron, integral fittings, hammer unions, swivel joints, manifolds, API 6A flanges, wellhead systems, and surface test trees for upstream oil and gas. 1K to 20K psi, sour and standard service. FMC / Cameron / SPM / Anson / NOV / Stream-Flo / Indus.

DEMCO resilient-seated butterfly valves from 2″ to 36″ with actuators, gear operators and handles, Victaulic grooved butterfly valves, industrial and high-pressure hydraulic ball valves, and Yuken CETOP 3 solenoid directional, relief and modular valves.

Annular and ram blowout preventers built to the Hydril GK and Cameron U patterns, ram blocks, control units, choke & kill manifolds, diverters, drilling spools and BOP spares for onshore and offshore drilling, with sour-service (NACE MR0175) construction.

Oilfield instrumentation & controls — data acquisition, flowmeters (magnetic / turbine / Coriolis), pressure sensors, gauges, thermometers, AC/DC converters, VFD systems, ex-proof electrical panels.

Surface well-testing packages — 3-phase separators, MPFM systems, surge tanks, KO drums, flare stacks, test pumps, sand filters, ESD panels, data headers, piping packages.

Frac fleet equipment — pumpers up to 3,000 HP, transfer pumps, missiles, sand silos, blenders, hydration units, LAS, data vans, and frac tanks.

Enerpac torque wrenches, bolt tensioners, flange tools, jacks, pullers, presses and cutters, Stanley hydraulic power tools and Pierce winches, listed by series with every model number.

Export quote · AT

Send the part list for Austria

Part numbers if you have them; bore, thread and pressure if you do not. A photo of the failed part is usually enough.

One line per item. Quantities and lengths help us quote from stock.

Drag and drop, or

PDF · JPG · PNG · HEIC · STEP · DWG — up to 25 MB each, 6 files

0 attachments ready

Standards

Standards we supply and certify against for Austria

StandardTypesApplies to
EN 8531SN · 2SNWire-braid hydraulic hose
EN 8564SP · 4SHSpiral-wire hydraulic hose
EN 8571SC · 2SCCompact wire-braid hose
SAE J517100R1 · R2 · R12 · R13 · R15SAE hydraulic hose series
ISO 18752Grades A–DPerformance-based hose classification
API 16CChoke & killWell control flexible lines
API 7KRotary & vibratorDrilling hose
API 6APSL 1–4Wellhead equipment
DIN 2353L · S seriesBite-type tube couplings
ISO 8434-124° coneMetric tube connections
ISO 6162 / 12151Code 61 · 62SAE flange and hose connections
EN 14420-5ClampedIndustrial hose couplings
NACE MR0175ISO 15156Sour-service materials
ISO 9001:2015CertifiedQuality management system

Customs

Tariff lines we declare under

  • 4009.22Rubber tube, reinforced with metal, with fittingsHydraulic hose assemblies
  • 4009.42Rubber tube, reinforced with other materials, with fittingsIndustrial hose assemblies
  • 7307.91Flanges, iron or steelSAE and API flanges
  • 7307.99Tube and pipe fittings, iron or steelAdapters, nipples, couplings
  • 8481.80Taps, cocks, valves and similar appliancesBall, gate, butterfly, needle
  • 8413.60Rotary positive displacement pumpsGear and vane pumps
  • 8412.21Hydraulic power engines, linear actingCylinders
  • 3403.99Lubricating preparationsGreases, pastes, compounds

Classification is confirmed line by line at quotation. This is the set most consignments to Austria are declared under.

Freight

Three ways in, priced per shipment

Sea + road, Adriatic20–26 days
Koper or Trieste, then roadDefault for most orders
Air freight2–4 days
DXB to VIEWhen the line is down
Sea + road, northern26–34 days
Hamburg and the Rhine corridorWhen the northern gate suits

Sequence

How an order to Austria works

  1. 01Send the part numbers, or the bore, thread and pressure if you do not have them. A photo of the failed part is usually enough.
  2. 02We quote in EUR against real stock, with the Incoterm stated on the Estimate rather than assumed.
  3. 03The gate is chosen against the delivery town rather than defaulted, and the CE declaration is prepared where the assembly is above threshold.
  4. 04Goods sail from Jebel Ali through Suez to the Adriatic and come on by road, and you get the paperwork and tracking together.

Industries

Who we supply in Austria

Delivery coverage

Cities and sites we deliver to in Austria

DAP deliveries go to the site gate. Coordinates are given because project sites are easier to name that way than by address.

16 locations listed

  • Vienna

    Vienna

  • Graz

    Styria

  • Linz

    Upper Austria

  • Wels

    Upper Austria

  • Steyr

    Upper Austria

  • Salzburg

    Salzburg

  • Innsbruck

    Tyrol

  • Kufstein

    Tyrol

  • Bregenz

    Vorarlberg

  • Klagenfurt

    Carinthia

  • Villach

    Carinthia

  • Leoben

    Styria

  • Kapfenberg

    Styria

  • St. Pölten

    Lower Austria

  • Wiener Neustadt

    Lower Austria

  • Ranshofen

    Upper Austria

Questions we get asked

Supplying Austria, in detail

01

Why does most Austrian cargo come up from the Adriatic rather than down from Hamburg?

Because the Adriatic is materially shorter out of Suez. Sea and road via Koper or Trieste typically takes 20–26 days against 26–34 days through Hamburg and the Rhine corridor, and a container discharged at Koper is a few hours from Graz. We use the northern gate where the delivery sits in Upper Austria or Vorarlberg and the road leg reverses the advantage, and we choose against the delivery town rather than a forwarder’s default.

02

Does cargo cleared at Koper or Trieste need a transit document to cross into Austria?

No. Austria is inside the customs union, so the importer enters the goods once at Koper, Trieste or Hamburg into free circulation, and the road leg into Austria is domestic movement. There is no second entry at the border and no transit document. The consignment travels with our Dubai Chamber-attested Certificate of Origin, our REACH position on the elastomer compounds and, for assemblies above threshold, the PED declaration.

03

Can a CE-declared equivalent hose replace the original on an Austrian cable car or ropeway?

Usually not, and we will not propose one. On passenger-carrying equipment components are approved as part of a certified system, so an equivalent is not equivalent whatever its rating. Our PED declaration covers our own assemblies above the PED 2014/68/EU threshold; it does not transfer an approval. We source the originally specified part with its documentation, and where we cannot obtain it we say so rather than put a certificate at risk.

04

We build ropeways in Vorarlberg for resorts abroad — can you supply the specified hose to the export site?

Yes, where the specified part is one we can obtain with its documentation. Tell us the item exactly as it appears on the approved system and the destination; we quote DAP to the project site, FOB Jebel Ali or EXW Dubai for your forwarder, and confirm the document set at quotation. If the specified item is not available to us, we say so rather than offer a substitute.

05

Our site is in Tyrol — does flying a part into Vienna still beat the Adriatic lane?

For a stopped machine, usually yes. Air freight from Dubai to Vienna typically takes 2–4 days, and the onward road leg west is domestic movement priced with the order, so the total is still far shorter than the 20–26 day Adriatic lane. For planned maintenance in the west, the sea lane via Koper or the northern gate through Hamburg is the economical choice.

06

Can you deliver DAP to an Alpine valley station or a tunnel portal?

Yes. On DAP terms the road leg from Koper, Trieste or Hamburg to the site is domestic movement and is priced with the order. Tell us the exact delivery point and any access limits — weight restrictions, narrow approach roads, a seasonal pass — and we will say at quotation where the delivery needs a smaller vehicle than a standard trailer.

07

Do you supply hose and fittings for forging presses in Kapfenberg and Leoben?

Yes. Forging and rolling presses in Styria run high-force cylinders and servo valves, and the hose and fittings serving them are specified by working pressure, impulse duty and the fluid, including fire-resistant fluids near hot work. Send the press duty and the existing assembly data and we quote to it; material and test certificates come with the order where it calls for them.

08

Can hose near magnesite kilns in Styria and Carinthia cope with heat as well as dust?

Yes, if it is specified for both. Around magnesite kilns and sinter plant the hydraulics see radiant heat and fine abrasive dust together, so the cover, any heat sleeve and the fitting plating are chosen for where the line runs, not only for pressure. Tell us the machine, the distance from the hot zone and the cycle rate. The pits and the Erzberg haul fleet need dust-rated, high-cycle hose rather than heat protection.

09

What do you need to quote governor or gate hydraulics for an Alpine storage plant?

The plant’s existing assembly data — bore, length, end fittings, working pressure — and the fluid, plus any material certification the operator specifies, such as EN 10204 3.1. Governor, actuator and gate hydraulics on storage and pumped-storage schemes are often changed in a short outage window, so we confirm the full document set at quotation and dispatch everything for the window on one file.

10

Do you supply hydraulics for the aluminium plant at Ranshofen?

Yes. Extrusion presses, rolling stands and casting equipment at Ranshofen in Upper Austria use high-force cylinders, servo valves and hose that has to tolerate heat near the press and casting areas. Because Ranshofen sits in Upper Austria, we compare the northern gate through Hamburg with the Adriatic at quotation, and the road leg is priced with the order.

Next step

Shipping to Austria?

Send the part numbers, or the bore, thread and pressure if you do not have them. We quote from real stock, in EUR, with the Incoterm stated rather than assumed.

Plant-down? Call +971 52 2477942 — 24/7

Quick enquiry

RFQ · AT

No account needed. We reply from the Dubai export desk.

Other export markets · 126 destinations

We run the same lane from Dubai to 125 other markets

All export markets