Skip to content
+971 52 2477942
Lane DXB → BEBelgië · Belgique

Export from Dubai

BE

Hydraulic & industrial hose supplier in Belgium

Indus Hydraulics ships from Jebel Ali to Antwerp by sea through Suez in typically 22–28 days, using Zeebrugge or Ghent where the berth suits, or by air into Brussels in 2–4 days, with a Dubai Chamber-attested Certificate of Origin, a PED declaration above threshold and a REACH position on the elastomer and PTFE compounds. What sets this lane apart is the chemical cluster behind the port: buyers specify the medium and concentration, and we answer with a named compound and a compatibility statement fit for a plant safety case. Goods clear once at Antwerp for any EU address.

Typical transit
Typically 22–28 days by sea from dispatch
Freight
Sea freight from Jebel Ali through Suez to Antwerp · Zeebrugge and Ghent where the berth suits · Air freight into Brussels where the schedule is tighter
Incoterms 2020
CIF Antwerp · DAP to the buyer’s site · FOB Jebel Ali · EXW Dubai for a nominated forwarder
Documentation
CE marking and the PED declaration where the assembly is above threshold · REACH position on the elastomer and PTFE compounds · Certificate of Origin, Dubai Chamber attested · EU customs entry raised by the importer
Fig. 01 · Export lane DXB → BEMercator · WGS 84
LUXEMBOURGANTWERP · PORTBRUSSELSGHENTZEEBRUGGETESSENDERLOLIÈGECHARLEROI3°E4°E5°E6°E50°N51°NN50 KMSEA · SUEZ · 11,580 KM · FROM JEBEL ALI · DXB
Port of entryDelivery citysea · suez corridor from JEBEL ALI · DXB
Origin
Jebel Ali · Dubai
Primary mode
Sea, via Suez
Port of entry
Antwerp
Transit
22–28 days
Quoted in
EUR
Docs prepared
Before the vessel sails
Warehouse aisle with racked reels of hydraulic hose on one side and bins of steel hose fittings and adapters on the other

01 · Stock

Stock held in Dubai, not drop-shipped from a factory queue.

Technician in safety glasses crimping a steel fitting onto a hydraulic hose, tagged assemblies and a pressure-test cabinet behind

02 · Assembly

Assemblies crimped and pressure-tested before they are packed.

Export documents and certificates fanned out on a desk beside a rubber stamp, a pen and a hydraulic hose fitting

03 · Documents

Conformity set for Belgium prepared while the order is picked.

Flatbed trailer loaded with shrink-wrapped hydraulic hose coils and cartons, strapped down at a warehouse yard gate

04 · Dispatch

One consignment, one set of documents, tracking on dispatch.

Catalogue · 21 clusters · 289 ranges

What we supply to Belgium

Browse the full catalogue

Everything below ships from the same Dubai warehouse, so a mixed order travels as one consignment under one set of documents. Open any card for its full list of ranges, or follow a heading through to specifications and an RFQ.

Hydraulic hose, fittings and adapters — wire-braid, spiral, compact and thermoplastic hose, crimp fittings and ferrules, SAE J518 flanges, quick couplers, and DIN 2353, BSP, JIC 37°, ORFS, metric and NPT thread forms. Carbon steel and SS316L.

Show all 77 Hoses & Fittings ranges

Industrial hoses for air, water, food, oil, chemical, steam and abrasive applications. Own-brand Indus rubber and PVC lines alongside engineered metallic and PTFE hose assemblies.

Shackles, hooks, lifting chain, wire rope, slings, hoists and blocks for lifting and rigging — each size under an Indus part number, with the working load limit wherever the manufacturer rates it. Supplied from Dubai with the manufacturer's test certificate.

Wellhead, frac, and process oilfield valves — ball, gate, check, plug, choke, globe, butterfly, surface safety (SSV/ESD), pressure relief, instrumentation. API 6A / 6D / 16C, sour and standard service.

WECO frac iron, integral fittings, hammer unions, swivel joints, manifolds, API 6A flanges, wellhead systems, and surface test trees for upstream oil and gas. 1K to 20K psi, sour and standard service. FMC / Cameron / SPM / Anson / NOV / Stream-Flo / Indus.

DEMCO resilient-seated butterfly valves from 2″ to 36″ with actuators, gear operators and handles, Victaulic grooved butterfly valves, industrial and high-pressure hydraulic ball valves, and Yuken CETOP 3 solenoid directional, relief and modular valves.

Annular and ram blowout preventers built to the Hydril GK and Cameron U patterns, ram blocks, control units, choke & kill manifolds, diverters, drilling spools and BOP spares for onshore and offshore drilling, with sour-service (NACE MR0175) construction.

Oilfield instrumentation & controls — data acquisition, flowmeters (magnetic / turbine / Coriolis), pressure sensors, gauges, thermometers, AC/DC converters, VFD systems, ex-proof electrical panels.

Surface well-testing packages — 3-phase separators, MPFM systems, surge tanks, KO drums, flare stacks, test pumps, sand filters, ESD panels, data headers, piping packages.

Frac fleet equipment — pumpers up to 3,000 HP, transfer pumps, missiles, sand silos, blenders, hydration units, LAS, data vans, and frac tanks.

Enerpac torque wrenches, bolt tensioners, flange tools, jacks, pullers, presses and cutters, Stanley hydraulic power tools and Pierce winches, listed by series with every model number.

Export quote · BE

Send the part list for Belgium

Part numbers if you have them; bore, thread and pressure if you do not. A photo of the failed part is usually enough.

One line per item. Quantities and lengths help us quote from stock.

Drag and drop, or

PDF · JPG · PNG · HEIC · STEP · DWG — up to 25 MB each, 6 files

0 attachments ready

Standards

Standards we supply and certify against for Belgium

StandardTypesApplies to
EN 8531SN · 2SNWire-braid hydraulic hose
EN 8564SP · 4SHSpiral-wire hydraulic hose
EN 8571SC · 2SCCompact wire-braid hose
SAE J517100R1 · R2 · R12 · R13 · R15SAE hydraulic hose series
ISO 18752Grades A–DPerformance-based hose classification
API 16CChoke & killWell control flexible lines
API 7KRotary & vibratorDrilling hose
API 6APSL 1–4Wellhead equipment
DIN 2353L · S seriesBite-type tube couplings
ISO 8434-124° coneMetric tube connections
ISO 6162 / 12151Code 61 · 62SAE flange and hose connections
EN 14420-5ClampedIndustrial hose couplings
NACE MR0175ISO 15156Sour-service materials
ISO 9001:2015CertifiedQuality management system

Customs

Tariff lines we declare under

  • 4009.22Rubber tube, reinforced with metal, with fittingsHydraulic hose assemblies
  • 4009.42Rubber tube, reinforced with other materials, with fittingsIndustrial hose assemblies
  • 7307.91Flanges, iron or steelSAE and API flanges
  • 7307.99Tube and pipe fittings, iron or steelAdapters, nipples, couplings
  • 8481.80Taps, cocks, valves and similar appliancesBall, gate, butterfly, needle
  • 8413.60Rotary positive displacement pumpsGear and vane pumps
  • 8412.21Hydraulic power engines, linear actingCylinders
  • 3403.99Lubricating preparationsGreases, pastes, compounds

Classification is confirmed line by line at quotation. This is the set most consignments to Belgium are declared under.

Freight

Three ways in, priced per shipment

Sea, FCL22–28 days
Jebel Ali to Antwerp, via SuezDefault for most orders
Air freight2–4 days
DXB to BRUWhen the line is down
Sea, LCL28–36 days
Consolidated, via a European hubSmall mixed orders

Sequence

How an order to Belgium works

  1. 01Send the part numbers, or the bore, thread and pressure if you do not have them. A photo of the failed part is usually enough.
  2. 02We quote in EUR against real stock, with the Incoterm stated on the Estimate rather than assumed.
  3. 03The compound documentation is assembled to the level a plant safety case needs, not a purchasing form, and the CE declaration is prepared where the assembly is above threshold.
  4. 04Goods sail from Jebel Ali through Suez to Antwerp, and you get the paperwork and tracking together.

Industries

Who we supply in Belgium

Delivery coverage

Cities and sites we deliver to in Belgium

DAP deliveries go to the site gate. Coordinates are given because project sites are easier to name that way than by address.

12 locations listed

  • Antwerp

    Flanders

  • Brussels

    Brussels-Capital

  • Ghent

    Flanders

  • Zeebrugge

    Flanders

  • Geel

    Flanders

  • Tessenderlo

    Flanders

  • Genk

    Flanders

  • Liège

    Wallonia

  • Charleroi

    Wallonia

  • Mons

    Wallonia

  • Feluy

    Wallonia

  • Kallo

    Flanders

Questions we get asked

Supplying Belgium, in detail

01

Why would an Antwerp plant buy hose from Dubai rather than a Belgian distributor?

For a standard fitting it should not. What we are asked for here is the aggressive-duty specification — PTFE and composite hose, SS316L fittings, and compound documentation for a plant safety case — where the local answer is often a factory build with weeks of lead time and ours is stock. If the enquiry turns out to be a standard part, we will say so.

02

Can you supply compound documentation good enough for a plant safety case?

Yes, and it is the commonest reason a Belgian chemical plant calls us. Give us the medium, the temperature and the concentration at quotation, and we state the compound, its resistance to that medium, its position under REACH and where it is unsuitable — rather than supplying to bore and pressure alone and leaving the plant to find out in service.

03

What arrives with a chemical transfer assembly cleared at Antwerp?

A declaration of conformity for any assembly above the pressure-volume threshold in PED 2014/68/EU — below it, sound engineering practice applies and there is no CE mark — plus our REACH position on the elastomer and PTFE compounds, a chemical compatibility statement for the named medium, and a Dubai Chamber-attested Certificate of Origin. The importer raises the entry into free circulation through Belgian Customs on arrival.

04

Antwerp, Ghent or Zeebrugge — does the port change anything?

Only the inland leg. Antwerp suits almost everything and has the shortest run to the chemical belt at Kallo, Geel and Tessenderlo; Ghent or Zeebrugge where a berth or sailing suits better. Clearance is identical at all three. Full containers from Jebel Ali through Suez take typically 22–28 days, and small mixed orders, consolidated via a European hub, 28–36 days.

05

Can goods clear at Antwerp for a site in France or Germany?

Yes. Goods enter free circulation once at Antwerp and move inland under the customs union, so a consignment for a French or German site does not clear twice. Give us the final address and we quote the inland leg as part of a DAP price under Incoterms 2020, rather than stopping at the quay and leaving you to arrange the onward truck.

06

Do you build PTFE-lined and flanged composite hose assemblies?

Yes — flanged composite assemblies for chemical transfer and PTFE-lined hose for high-temperature aggressive duty, built and pressure-tested in Dubai. Tell us the medium, concentration, temperature and the flange standard on the tank or line, and the quotation names the liner and end fittings to suit, with the chemical compatibility statement attached for the duty it is built for.

07

How do you stop a hose rated for one chemical ending up on another line?

By colour coding and permanently tagging every assembly to your site’s service scheme rather than ours. On a site handling many media, the real risk is an assembly moved from one duty to another because it was on the shelf and physically fitted. Tagging by service, medium and line number costs nothing at build and removes that whole category of mistake later.

08

How quickly can an urgent assembly reach Brussels by air?

Typically 2–4 days from Dubai to Brussels Airport, against 22–28 days by sea to Antwerp. Air is worth it for a single assembly holding up a unit restart, not for a routine order. For a standard fitting a Belgian distributor will beat both and we will say so; air from us earns its cost when the item is a specification nobody nearby holds.

09

Do you supply hydraulics for the steelworks at Ghent, Liège and Genk?

Yes — high-force cylinders, servo valves and hose assemblies compatible with fire-resistant fluids for the integrated works at Ghent, the rolling and coating lines around Liège and stainless production at Genk. Tell us the fluid designation, because water-glycol and phosphate ester attack different compounds, and say whether the run sees radiant heat so protective sleeving can be specified with the assembly.

10

Can you deliver to Feluy and other sites in Wallonia?

Yes, on DAP terms. Feluy, south of Brussels, hosts a major petrochemical and polymer site, and Liège, Charleroi and Mons are reached by road from Antwerp in the same way as the Flemish plants. Clearance happens once at the port, so a Walloon delivery carries the same documents as one to Kallo, with the road leg priced into the quotation.

11

Do you supply hydraulics for dredgers, tugs and offshore wind vessels working from Belgian ports?

Yes — hose assemblies, fittings and valves for deck machinery, winches, cranes and terminal equipment on fleets working from Antwerp, Ghent, Zeebrugge and Ostend, including vessels serving the Belgian North Sea wind farms. Seawater exposure and long running hours decide the cover compound and fitting plating as much as the pressure rating, so tell us where the line runs and we specify accordingly.

12

Do you supply lay flat hose to Belgium?

Yes. TPU and NBR lay flat hose goes to Belgium for dewatering, flood pumping and temporary water lines, and slurry supply and drag hose for agricultural contractors, with couplings and reels to match. Hose ships from Dubai as bulk coils up to 400 m or as made-up assemblies with couplings fitted, with the size table and pressure rating for each bore.

Next step

Shipping to Belgium?

Send the part numbers, or the bore, thread and pressure if you do not have them. We quote from real stock, in EUR, with the Incoterm stated rather than assumed.

Plant-down? Call +971 52 2477942 — 24/7

Quick enquiry

RFQ · BE

No account needed. We reply from the Dubai export desk.

Other export markets · 126 destinations

We run the same lane from Dubai to 125 other markets

All export markets