Skip to content
+971 52 2477942
Lane DXB → SESverige

Export from Dubai

SE

Hydraulic & industrial hose supplier in Sweden

Indus Hydraulics ships from Jebel Ali to Gothenburg by sea through Suez and round the Skaw in 28–34 days, or by air into Stockholm Arlanda in 2–4 days, with the PED declaration for assemblies above threshold and the importer's single EU entry. The inland leg defines this lane: Kiruna and Gällivare are 34–42 days to the mine gate, where a standard nitrile stiffens badly. Northern orders carry a low-temperature compound statement, abrasion-resistant covers and, where the contract asks, mill certificates traceable to heat number.

Typical transit
Typically 28–34 days by sea from dispatch
Freight
Sea freight from Jebel Ali through Suez and round the Skaw to Gothenburg · Stockholm and Gävle for the east coast · Luleå for the northern mining belt in season · Air freight into Stockholm where the schedule is tighter
Incoterms 2020
CIF Gothenburg · DAP to the buyer’s site or mine gate · FOB Jebel Ali · EXW Dubai for a nominated forwarder
Documentation
CE marking and the PED declaration where the assembly is above threshold · REACH position on the elastomer compounds · Certificate of Origin, Dubai Chamber attested · EU customs entry raised by the importer
Fig. 01 · Export lane DXB → SEMercator · WGS 84
NORWAYLITHUANIALATVIAFINLANDESTONIAGOTHENBURG · PORTSTOCKHOLMMALMÖLINKÖPINGGÄVLESUNDSVALLLULEÅKIRUNA0°5°E10°E15°E20°E25°E30°E35°E55°N60°N65°NN400 KMSEA · SUEZ · 3,110 KM · FROM JEBEL ALI · DXB
Port of entryDelivery citysea · suez corridor from JEBEL ALI · DXB
Origin
Jebel Ali · Dubai
Primary mode
Sea, via Suez
Port of entry
Gothenburg
Transit
28–34 days
Quoted in
EUR
Docs prepared
Before the vessel sails
Warehouse aisle with racked reels of hydraulic hose on one side and bins of steel hose fittings and adapters on the other

01 · Stock

Stock held in Dubai, not drop-shipped from a factory queue.

Technician in safety glasses crimping a steel fitting onto a hydraulic hose, tagged assemblies and a pressure-test cabinet behind

02 · Assembly

Assemblies crimped and pressure-tested before they are packed.

Export documents and certificates fanned out on a desk beside a rubber stamp, a pen and a hydraulic hose fitting

03 · Documents

Conformity set for Sweden prepared while the order is picked.

Flatbed trailer loaded with shrink-wrapped hydraulic hose coils and cartons, strapped down at a warehouse yard gate

04 · Dispatch

One consignment, one set of documents, tracking on dispatch.

Catalogue · 21 clusters · 289 ranges

What we supply to Sweden

Browse the full catalogue

Everything below ships from the same Dubai warehouse, so a mixed order travels as one consignment under one set of documents. Open any card for its full list of ranges, or follow a heading through to specifications and an RFQ.

Hydraulic hose, fittings and adapters — wire-braid, spiral, compact and thermoplastic hose, crimp fittings and ferrules, SAE J518 flanges, quick couplers, and DIN 2353, BSP, JIC 37°, ORFS, metric and NPT thread forms. Carbon steel and SS316L.

Show all 77 Hoses & Fittings ranges

Industrial hoses for air, water, food, oil, chemical, steam and abrasive applications. Own-brand Indus rubber and PVC lines alongside engineered metallic and PTFE hose assemblies.

Shackles, hooks, lifting chain, wire rope, slings, hoists and blocks for lifting and rigging — each size under an Indus part number, with the working load limit wherever the manufacturer rates it. Supplied from Dubai with the manufacturer's test certificate.

Wellhead, frac, and process oilfield valves — ball, gate, check, plug, choke, globe, butterfly, surface safety (SSV/ESD), pressure relief, instrumentation. API 6A / 6D / 16C, sour and standard service.

WECO frac iron, integral fittings, hammer unions, swivel joints, manifolds, API 6A flanges, wellhead systems, and surface test trees for upstream oil and gas. 1K to 20K psi, sour and standard service. FMC / Cameron / SPM / Anson / NOV / Stream-Flo / Indus.

DEMCO resilient-seated butterfly valves from 2″ to 36″ with actuators, gear operators and handles, Victaulic grooved butterfly valves, industrial and high-pressure hydraulic ball valves, and Yuken CETOP 3 solenoid directional, relief and modular valves.

Annular and ram blowout preventers built to the Hydril GK and Cameron U patterns, ram blocks, control units, choke & kill manifolds, diverters, drilling spools and BOP spares for onshore and offshore drilling, with sour-service (NACE MR0175) construction.

Oilfield instrumentation & controls — data acquisition, flowmeters (magnetic / turbine / Coriolis), pressure sensors, gauges, thermometers, AC/DC converters, VFD systems, ex-proof electrical panels.

Surface well-testing packages — 3-phase separators, MPFM systems, surge tanks, KO drums, flare stacks, test pumps, sand filters, ESD panels, data headers, piping packages.

Frac fleet equipment — pumpers up to 3,000 HP, transfer pumps, missiles, sand silos, blenders, hydration units, LAS, data vans, and frac tanks.

Enerpac torque wrenches, bolt tensioners, flange tools, jacks, pullers, presses and cutters, Stanley hydraulic power tools and Pierce winches, listed by series with every model number.

Export quote · SE

Send the part list for Sweden

Part numbers if you have them; bore, thread and pressure if you do not. A photo of the failed part is usually enough.

One line per item. Quantities and lengths help us quote from stock.

Drag and drop, or

PDF · JPG · PNG · HEIC · STEP · DWG — up to 25 MB each, 6 files

0 attachments ready

Standards

Standards we supply and certify against for Sweden

StandardTypesApplies to
EN 8531SN · 2SNWire-braid hydraulic hose
EN 8564SP · 4SHSpiral-wire hydraulic hose
EN 8571SC · 2SCCompact wire-braid hose
SAE J517100R1 · R2 · R12 · R13 · R15SAE hydraulic hose series
ISO 18752Grades A–DPerformance-based hose classification
API 16CChoke & killWell control flexible lines
API 7KRotary & vibratorDrilling hose
API 6APSL 1–4Wellhead equipment
DIN 2353L · S seriesBite-type tube couplings
ISO 8434-124° coneMetric tube connections
ISO 6162 / 12151Code 61 · 62SAE flange and hose connections
EN 14420-5ClampedIndustrial hose couplings
NACE MR0175ISO 15156Sour-service materials
ISO 9001:2015CertifiedQuality management system

Customs

Tariff lines we declare under

  • 4009.22Rubber tube, reinforced with metal, with fittingsHydraulic hose assemblies
  • 4009.42Rubber tube, reinforced with other materials, with fittingsIndustrial hose assemblies
  • 7307.91Flanges, iron or steelSAE and API flanges
  • 7307.99Tube and pipe fittings, iron or steelAdapters, nipples, couplings
  • 8481.80Taps, cocks, valves and similar appliancesBall, gate, butterfly, needle
  • 8413.60Rotary positive displacement pumpsGear and vane pumps
  • 8412.21Hydraulic power engines, linear actingCylinders
  • 3403.99Lubricating preparationsGreases, pastes, compounds

Classification is confirmed line by line at quotation. This is the set most consignments to Sweden are declared under.

Freight

Three ways in, priced per shipment

Sea, FCL28–34 days
Jebel Ali to Gothenburg, via SuezDefault for most orders
Air freight2–4 days
DXB to ARNWhen the line is down
Sea + road, northern34–42 days
Gothenburg, then road to the mining beltKiruna and Gällivare

Sequence

How an order to Sweden works

  1. 01Send the part numbers, or the bore, thread and pressure if you do not have them. A photo of the failed part is usually enough.
  2. 02We quote in EUR against real stock, with the Incoterm stated on the Estimate rather than assumed.
  3. 03The low-temperature specification is confirmed where the goods are going north, and the CE declaration is prepared where the assembly is above threshold.
  4. 04Goods sail from Jebel Ali through Suez to Gothenburg, and you get the paperwork and tracking together.

Industries

Who we supply in Sweden

Close-up of a mining shovel’s hydraulic boom cylinders and hoses as it loads a haul truck in an open-pit mine
mining

Mining in Sweden

Iron ore at Kiruna and Malmberget, copper at Aitik near Gällivare and the base-metal mines of Bergslagen — underground loaders, drill rigs and concentrators, specified with low-temperature compounds, abrasion covers and material documentation that survives an audit.

Industry page
A glowing steel strip passing through a hot rolling mill stand with its hydraulic cylinders and tubing
steel

Steel & Metals in Sweden

High-force cylinders, servo valves and heat-resistant hose for the steel lines at Luleå, Oxelösund and Borlänge, specialty steel at Sandviken and Hofors, and the green-steel plant taking shape around Boden.

Industry page
An excavator’s boom cylinders and hydraulic hoses on a construction site, a hazy city skyline behind
construction

Construction in Sweden

Excavator, crane and tunnelling hydraulics for the Stockholm bypass, Gothenburg's West Link and the rebuilding of Kiruna's town centre, and for the machinery builders around Eskilstuna and Örebro who export loaders and rigs.

Industry page
Spillway radial gates on a hydroelectric dam, each raised by a pair of hydraulic cylinders, water rushing beneath
power

Power & Energy in Sweden

Actuator and governor hydraulics for the hydro cascades on the Lule, Ume and Indals rivers and for thermal plant, with intake-gate and governor assemblies specified for a Norrland winter.

Industry page
A hydraulic anchor-handling winch on the wet aft deck of an offshore supply vessel, an oil platform on the horizon
marine

Marine & Offshore in Sweden

Deck machinery, ferry and port-crane hydraulics for the Gothenburg container and ro-ro terminals, the Baltic ferry ports at Stockholm and Trelleborg, and the ore-loading port at Luleå.

Industry page
A BOP accumulator unit with rows of pressure bottles, a pump skid and bundled hydraulic hoses at the base of a desert land rig at sunset
oil · gas

Oil & Gas in Sweden

Valves, industrial hose and assemblies for the west-coast refineries at Lysekil and Gothenburg, the Nynäshamn refinery and the fuel terminals on the Göta älv.

Industry page

Delivery coverage

Cities and sites we deliver to in Sweden

DAP deliveries go to the site gate. Coordinates are given because project sites are easier to name that way than by address.

16 locations listed

  • Gothenburg

    Västra Götaland

  • Stockholm

    Stockholm

  • Malmö

    Skåne

  • Helsingborg

    Skåne

  • Norrköping

    Östergötland

  • Linköping

    Östergötland

  • Västerås

    Västmanland

  • Gävle

    Gävleborg

  • Sandviken

    Gävleborg

  • Borlänge

    Dalarna

  • Sundsvall

    Västernorrland

  • Umeå

    Västerbotten

  • Luleå

    Norrbotten

  • Kiruna

    Norrbotten

  • Gällivare

    Norrbotten

  • Oxelösund

    Södermanland

Questions we get asked

Supplying Sweden, in detail

01

Do assemblies bound for Kiruna or Gällivare come with a low-temperature compound statement?

Yes, for anything going north. A standard nitrile stiffens well before the temperatures the northern mining belt works in, so a hose chosen on bore and pressure alone is the wrong hose by December. We specify a low-temperature compound, put it in writing at quotation, and say plainly when a catalogue item is unsuitable — a more useful answer than supplying exactly what was asked for.

02

How long does an order take to reach the mine gate at Kiruna or Gällivare?

Typically 34–42 days from dispatch: 28–34 days by sea from Jebel Ali through Suez to Gothenburg, then the long domestic road leg north. We quote it on DAP terms to the mine gate, with the road leg priced in the order rather than estimated. For a machine that is down, air freight into Stockholm Arlanda takes 2–4 days before the road journey north.

03

Can northern cargo come in through Luleå rather than being trucked up from Gothenburg?

In season, yes. Luleå serves the northern mining belt when the Gulf of Bothnia is open, and landing there shortens the road leg to Kiruna, Gällivare and the Norrbotten steel works considerably. Outside the season Gothenburg plus the road journey is the reliable route. Tell us the site and the date the goods are needed, and the quotation states which port and route it assumes.

04

Our plant is in Gävleborg or Västmanland — is an east-coast landing better than Gothenburg?

Often, yes, when the delivery sits on the east coast and the road leg from Gothenburg would cross the country. Gothenburg takes the direct sailing and serves the west and south, so it is the default for almost everything. For a plant around Stockholm, Västerås, Gävle or Sandviken, landing on the east coast shortens the inland leg. Tell us the delivery town and we route accordingly.

05

Our mine's supplier audit asks for material traceability — what can you provide?

Mill certificates traceable to heat number, where the contract requires them, issued by the mill or our test bench. The point is to confirm them at quotation rather than reconstruct them after an auditor asks, because a certificate tied to the actual heat has to be requested before the goods are picked. Tell us which lines need it and at what level, and we confirm what is obtainable before you order.

06

We are converting underground loaders to a fire-resistant fluid — what has to change on the hydraulics?

More than the fluid. Fire-resistant fluids carry less load and are harder on components than mineral oil, so seals, hose linings and sometimes permissible operating pressures change with them. A conversion that does not revisit what the fluid touches produces failures that look random and are not. Send the fluid designation with the existing hose specifications and we identify which assemblies and seals must change before the conversion, not after.

07

Do you supply hose for underground drill rigs and loaders working at depth?

Yes — high-pressure hose with abrasion-resistant covers, made up to length with fittings matched to the machine. Underground, a failed hose is a fire risk as well as a stoppage, so cover material, fluid compatibility and routing matter as much as the pressure rating. Send the machine, the fluid and the old assembly's dimensions and end fittings, and goods go DAP to the mine workshop.

08

We build machines in Sweden — do the hose assemblies we fit arrive with a PED declaration?

Where the assembly is above the pressure-volume threshold in PED 2014/68/EU, yes: we issue the declaration of conformity as the assembler and it travels with the goods. Below the threshold sound engineering practice applies and there is no mark. For a production build we state against each line which side of the threshold it falls on, so your own documentation is not left to guess.

09

Do you supply hydraulics for the new green-steel plant around Boden?

Yes, for new-build and commissioning work as well as spares — high-force cylinders, servo valves and heat-resistant hose built to the drawing. Cargo goes to Luleå in season or Gothenburg otherwise, then DAP to the site. The PED position is stated per line at quotation, mill certificates traceable to heat number are confirmed where the contract calls for them, and outdoor lines get a low-temperature compound.

10

Do intake-gate cylinders at a Norrland hydro station need a different hose for winter?

Usually, yes. Gate and intake assemblies sit outside or in unheated structures through a long northern winter, and a standard nitrile stiffens well above those temperatures. We specify a low-temperature compound for exposed lines and keep the catalogue default for those inside the powerhouse. Send the gate and governor line list with where each runs; for a planned outage, order early enough for the sea lane.

11

Do you supply lay flat hose to Sweden?

Yes. TPU and NBR lay flat hose goes to Sweden for mine and construction dewatering, and TPU snowmaking hose to winter sports operators. TPU hose is rated from -50 °C, so it stays flexible in Nordic winters; rigid-helix suction hose is supplied for pump inlets. Hose ships from Dubai as bulk coils up to 400 m or as made-up assemblies with couplings fitted, with the size table and pressure rating for each bore.

From the blog

Guides for buyers in Sweden

Next step

Shipping to Sweden?

Send the part numbers, or the bore, thread and pressure if you do not have them. We quote from real stock, in EUR, with the Incoterm stated rather than assumed.

Plant-down? Call +971 52 2477942 — 24/7

Quick enquiry

RFQ · SE

No account needed. We reply from the Dubai export desk.

Other export markets · 126 destinations

We run the same lane from Dubai to 125 other markets

All export markets