Skip to content
+971 52 2477942
Lane DXB → ISÍsland

Export from Dubai

IS

Hydraulic & industrial hose supplier in Iceland

Indus Hydraulics ships to Iceland from Jebel Ali by sea through Suez, transhipping at Rotterdam or Hamburg onto the weekly feeder to Reykjavík in 32–42 days, or by air into Keflavík in 3–5 days, with the PED declaration for assemblies above threshold and a Dubai Chamber Certificate of Origin. Iceland is in the EEA but not the EU customs union, so goods are declared on arrival. The feeder, not the distance, sets the date, so we build each consignment to catch a named sailing. Geothermal plant and the fishing fleet set the specification.

Typical transit
Typically 32–42 days by sea from dispatch, feeder-dependent
Freight
Sea freight from Jebel Ali through Suez to Rotterdam or Hamburg, then a weekly feeder to Reykjavík · Air freight into Keflavík where the schedule is tighter
Incoterms 2020
CIF Reykjavík · DAP to the buyer’s site · FOB Jebel Ali · EXW Dubai for a nominated forwarder
Documentation
CE marking and the PED declaration where the assembly is above threshold · REACH position on the elastomer compounds · Certificate of Origin, Dubai Chamber attested · Customs declaration raised by the importer
Fig. 01 · Export lane DXB → ISMercator · WGS 84
REYKJAVÍK · PORTHAFNARFJÖRÐURGRUNDARTANGIKEFLAVÍKSELFOSSAKUREYRIREYÐARFJÖRÐURVESTMANNAEYJAR24°W22°W20°W18°W16°W14°W64°N66°NN100 KMSEA · TRANSHIP · 12,840 KM · FROM JEBEL ALI · DXB
Port of entryDelivery citysea · tranship corridor from JEBEL ALI · DXB
Origin
Jebel Ali · Dubai
Primary mode
Sea, transhipped
Port of entry
Reykjavík
Transit
32–42 days
Quoted in
EUR
Docs prepared
Before the vessel sails
Warehouse aisle with racked reels of hydraulic hose on one side and bins of steel hose fittings and adapters on the other

01 · Stock

Stock held in Dubai, not drop-shipped from a factory queue.

Technician in safety glasses crimping a steel fitting onto a hydraulic hose, tagged assemblies and a pressure-test cabinet behind

02 · Assembly

Assemblies crimped and pressure-tested before they are packed.

Export documents and certificates fanned out on a desk beside a rubber stamp, a pen and a hydraulic hose fitting

03 · Documents

Conformity set for Iceland prepared while the order is picked.

Flatbed trailer loaded with shrink-wrapped hydraulic hose coils and cartons, strapped down at a warehouse yard gate

04 · Dispatch

One consignment, one set of documents, tracking on dispatch.

Catalogue · 21 clusters · 289 ranges

What we supply to Iceland

Browse the full catalogue

Everything below ships from the same Dubai warehouse, so a mixed order travels as one consignment under one set of documents. Open any card for its full list of ranges, or follow a heading through to specifications and an RFQ.

Hydraulic hose, fittings and adapters — wire-braid, spiral, compact and thermoplastic hose, crimp fittings and ferrules, SAE J518 flanges, quick couplers, and DIN 2353, BSP, JIC 37°, ORFS, metric and NPT thread forms. Carbon steel and SS316L.

Show all 77 Hoses & Fittings ranges

Industrial hoses for air, water, food, oil, chemical, steam and abrasive applications. Own-brand Indus rubber and PVC lines alongside engineered metallic and PTFE hose assemblies.

Shackles, hooks, lifting chain, wire rope, slings, hoists and blocks for lifting and rigging — each size under an Indus part number, with the working load limit wherever the manufacturer rates it. Supplied from Dubai with the manufacturer's test certificate.

Wellhead, frac, and process oilfield valves — ball, gate, check, plug, choke, globe, butterfly, surface safety (SSV/ESD), pressure relief, instrumentation. API 6A / 6D / 16C, sour and standard service.

WECO frac iron, integral fittings, hammer unions, swivel joints, manifolds, API 6A flanges, wellhead systems, and surface test trees for upstream oil and gas. 1K to 20K psi, sour and standard service. FMC / Cameron / SPM / Anson / NOV / Stream-Flo / Indus.

DEMCO resilient-seated butterfly valves from 2″ to 36″ with actuators, gear operators and handles, Victaulic grooved butterfly valves, industrial and high-pressure hydraulic ball valves, and Yuken CETOP 3 solenoid directional, relief and modular valves.

Annular and ram blowout preventers built to the Hydril GK and Cameron U patterns, ram blocks, control units, choke & kill manifolds, diverters, drilling spools and BOP spares for onshore and offshore drilling, with sour-service (NACE MR0175) construction.

Oilfield instrumentation & controls — data acquisition, flowmeters (magnetic / turbine / Coriolis), pressure sensors, gauges, thermometers, AC/DC converters, VFD systems, ex-proof electrical panels.

Surface well-testing packages — 3-phase separators, MPFM systems, surge tanks, KO drums, flare stacks, test pumps, sand filters, ESD panels, data headers, piping packages.

Frac fleet equipment — pumpers up to 3,000 HP, transfer pumps, missiles, sand silos, blenders, hydration units, LAS, data vans, and frac tanks.

Enerpac torque wrenches, bolt tensioners, flange tools, jacks, pullers, presses and cutters, Stanley hydraulic power tools and Pierce winches, listed by series with every model number.

Export quote · IS

Send the part list for Iceland

Part numbers if you have them; bore, thread and pressure if you do not. A photo of the failed part is usually enough.

One line per item. Quantities and lengths help us quote from stock.

Drag and drop, or

PDF · JPG · PNG · HEIC · STEP · DWG — up to 25 MB each, 6 files

0 attachments ready

Standards

Standards we supply and certify against for Iceland

StandardTypesApplies to
EN 8531SN · 2SNWire-braid hydraulic hose
EN 8564SP · 4SHSpiral-wire hydraulic hose
EN 8571SC · 2SCCompact wire-braid hose
SAE J517100R1 · R2 · R12 · R13 · R15SAE hydraulic hose series
ISO 18752Grades A–DPerformance-based hose classification
API 16CChoke & killWell control flexible lines
API 7KRotary & vibratorDrilling hose
API 6APSL 1–4Wellhead equipment
DIN 2353L · S seriesBite-type tube couplings
ISO 8434-124° coneMetric tube connections
ISO 6162 / 12151Code 61 · 62SAE flange and hose connections
EN 14420-5ClampedIndustrial hose couplings
NACE MR0175ISO 15156Sour-service materials
ISO 9001:2015CertifiedQuality management system

Customs

Tariff lines we declare under

  • 4009.22Rubber tube, reinforced with metal, with fittingsHydraulic hose assemblies
  • 4009.42Rubber tube, reinforced with other materials, with fittingsIndustrial hose assemblies
  • 7307.91Flanges, iron or steelSAE and API flanges
  • 7307.99Tube and pipe fittings, iron or steelAdapters, nipples, couplings
  • 8481.80Taps, cocks, valves and similar appliancesBall, gate, butterfly, needle
  • 8413.60Rotary positive displacement pumpsGear and vane pumps
  • 8412.21Hydraulic power engines, linear actingCylinders
  • 3403.99Lubricating preparationsGreases, pastes, compounds

Classification is confirmed line by line at quotation. This is the set most consignments to Iceland are declared under.

Freight

Three ways in, priced per shipment

Sea, FCL32–42 days
Transhipped at Rotterdam, then weekly feederDefault for most orders
Air freight3–5 days
DXB to KEF, with a connectionWhen the line is down
Sea, LCL38–50 days
Consolidated, two transhipmentsSmall mixed orders

Sequence

How an order to Iceland works

  1. 01Send the part numbers, or the bore, thread and pressure if you do not have them. A photo of the failed part is usually enough.
  2. 02We quote in EUR against real stock, with the Incoterm stated on the Estimate rather than assumed.
  3. 03The consignment is built to catch a named feeder rather than an average schedule, and the compound is specified for geothermal or marine service where that is the duty.
  4. 04Goods sail to Rotterdam and tranship for Reykjavík, and you get the paperwork and tracking together.

Industries

Who we supply in Iceland

Delivery coverage

Cities and sites we deliver to in Iceland

DAP deliveries go to the site gate. Coordinates are given because project sites are easier to name that way than by address.

12 locations listed

  • Reykjavík

    Capital Region

  • Hafnarfjörður

    Capital Region

  • Grundartangi

    West

  • Akranes

    West

  • Keflavík

    Southern Peninsula

  • Grindavík

    Southern Peninsula

  • Selfoss

    South

  • Hellisheiði

    South

  • Akureyri

    Northeast

  • Húsavík

    Northeast

  • Reyðarfjörður

    East

  • Vestmannaeyjar

    South

Questions we get asked

Supplying Iceland, in detail

01

Is it better for Icelandic cargo to tranship at Rotterdam or Hamburg?

Whichever makes the earlier feeder connection, because nothing sails to Iceland directly from the Gulf and the weekly feeder sets the date more than the distance does. A full container runs 32–42 days from dispatch; LCL, with two transhipments, 38–50 days. Missing a connection costs a week rather than a day, so we choose the hub that catches a named sailing rather than quoting against an average schedule.

02

What should we tell you about a geothermal line at Hellisheiði or Svartsengi?

The temperature, the pressure and whether the medium is steam or high-temperature water, and whether it carries dissolved solids. A standard compound is the wrong answer for geothermal service, and we will say so rather than supply to the bore. With those facts we specify the compound and construction, issue a temperature and medium statement at quotation, and add the PED declaration where the assembly is above threshold.

03

Should trawl-winch hose and processing-deck hose on the same vessel be specified differently?

Yes. A trawl winch line needs salt resistance and mechanical toughness; a line inside the processing deck must be cleanable, tolerate wash-down chemicals and hot water, and be acceptable near product. One hose specified for the whole boat does one job adequately and the other badly. Split the list by where each assembly runs and we make them up to length, identified by position, on one consignment.

04

Iceland is outside the EU — does a CE declaration still apply to our hose assemblies?

Yes. Iceland applies the European framework through the EEA, so a hose assembly above the pressure-volume threshold in PED 2014/68/EU needs the same declaration of conformity a member state would expect. We issue it as the assembler before dispatch and it travels with the goods. Below the threshold sound engineering practice applies and there is no mark.

05

Do goods transhipped at Rotterdam reach Reykjavík already in EU free circulation?

No. Iceland is in the EEA rather than the EU customs union, so goods do not arrive in free circulation from a European port; the importer makes a customs import declaration through Iceland Revenue and Customs. It is a straightforward entry, but it is its own file, supported by our invoice, the PED declaration where it applies and the Certificate of Origin, Dubai Chamber attested.

06

How do we stop a missed feeder adding a week to a Reykjavík delivery?

Consolidate and plan to a named sailing. On a weekly feeder, one consignment catching one sailing lands sooner and cheaper than three small ones spread across three weeks. Send requirements together, tell us the date the goods are needed, and we build the consignment to make a specific connection; we also say when holding a line for the next consignment is the better answer.

07

Can you supply potline and casthouse hydraulics for the Straumsvík, Grundartangi and Reyðarfjörður smelters?

Yes — high-force cylinders, servo valves and heat-resistant hose for potline, casthouse and handling equipment, where heat and continuous duty set the specification. Goods land at Reykjavík on the feeder and go DAP to the smelter; for Reyðarfjörður the onward leg is quoted with the order. Send the drawing or nameplate data, the working temperature and the fluid, and we match against them.

08

Can goods be delivered to Akureyri or the East Fjords rather than Reykjavík?

Yes, on DAP terms to the buyer's site. Cargo lands at Reykjavík on the weekly feeder and the onward leg north or east is quoted with the order rather than estimated. For a breakdown, air freight from Dubai into Keflavík takes 3–5 days with a connection. Name the delivery town and consignee at enquiry so the feeder and the domestic leg are planned together.

09

Can a season's earthmoving and tunnelling spares for Reykjanes or a road tunnel travel on one feeder sailing?

Yes, and on this lane it is the sensible way to buy. Excavator, crane, drill-rig and tunnelling hydraulics, with hose made up to length and fittings matched to the machine, are consolidated into one consignment built to catch a named feeder. Send the fleet list with makes and models, or the old assemblies' dimensions and end fittings, and the date the season starts; anything urgent later can fly into Keflavík in 3–5 days.

10

Can you supply fuel-transfer and bunkering hose for the Reykjavík and Reyðarfjörður terminals?

Yes — fuel transfer hose, couplings and valves for terminal and bunkering work, shipped with any hydraulic spares on the same consignment. Send the bore, length, media, working pressure and end connections and we confirm the construction and the certificates that travel with it. Our REACH position on the elastomer compounds is stated at quotation, and the PED declaration accompanies any assembly above threshold.

Next step

Shipping to Iceland?

Send the part numbers, or the bore, thread and pressure if you do not have them. We quote from real stock, in EUR, with the Incoterm stated rather than assumed.

Plant-down? Call +971 52 2477942 — 24/7

Quick enquiry

RFQ · IS

No account needed. We reply from the Dubai export desk.

Other export markets · 126 destinations

We run the same lane from Dubai to 125 other markets

All export markets