Skip to content
+971 52 2477942
Lane DXB → LAລາວ

Export from Dubai

LA

Hydraulic & industrial hose supplier in Laos

Indus Hydraulics ships hydraulic hose, fittings, valves and industrial hose to Laos by sea from Jebel Ali to Laem Chabang in Thailand, then under Thai bond across the Friendship Bridge at Thanaleng into Vientiane, typically 28–36 days in all, or by air into Vientiane. Southern sites in Savannakhet and Champasak can instead route through Da Nang and the east–west corridor. The border sets the arrival date, so the Thai transit documents and the Lao declaration are prepared together, line for line, before the vessel sails.

Typical transit
Typically 28–36 days sea and road via Laem Chabang and Thanaleng · 30–40 days via Da Nang for the south · 4–7 days by air into Vientiane
Freight
Sea freight from Jebel Ali to Laem Chabang, then bonded road through Thanaleng · Da Nang and the east–west corridor for Savannakhet · Air freight into Vientiane where the schedule is tighter
Incoterms 2020
DAP to the buyer’s site · CIF Laem Chabang · FOB Jebel Ali · EXW Dubai for a nominated forwarder
Documentation
Thai transit documents for the bonded move · Lao customs declaration raised by the importer · Certificate of Origin, Dubai Chamber attested
Fig. 01 · Export lane DXB → LAMercator · WGS 84
VIETNAMTHAILANDTHANALENG · NONG KHAIVIENTIANELUANG PRABANGBOTENTHAKHEKSAVANNAKHETPAKSE98°E100°E102°E104°E106°E108°E110°E14°N16°N18°N20°N22°NN200 KMSEA + ROAD · 8,370 KM · FROM JEBEL ALI · DXB
Border crossingDelivery citysea + road corridor from JEBEL ALI · DXB
Origin
Jebel Ali · Dubai
Primary mode
Sea + road
Border crossing
Thanaleng · Nong Khai
Transit
28–36 days
Quoted in
USD
Docs prepared
Before the vessel sails
Warehouse aisle with racked reels of hydraulic hose on one side and bins of steel hose fittings and adapters on the other

01 · Stock

Stock held in Dubai, not drop-shipped from a factory queue.

Technician in safety glasses crimping a steel fitting onto a hydraulic hose, tagged assemblies and a pressure-test cabinet behind

02 · Assembly

Assemblies crimped and pressure-tested before they are packed.

Export documents and certificates fanned out on a desk beside a rubber stamp, a pen and a hydraulic hose fitting

03 · Documents

Conformity set for Laos prepared while the order is picked.

Flatbed trailer loaded with shrink-wrapped hydraulic hose coils and cartons, strapped down at a warehouse yard gate

04 · Dispatch

One consignment, one set of documents, tracking on dispatch.

Catalogue · 21 clusters · 289 ranges

What we supply to Laos

Browse the full catalogue

Everything below ships from the same Dubai warehouse, so a mixed order travels as one consignment under one set of documents. Open any card for its full list of ranges, or follow a heading through to specifications and an RFQ.

Hydraulic hose, fittings and adapters — wire-braid, spiral, compact and thermoplastic hose, crimp fittings and ferrules, SAE J518 flanges, quick couplers, and DIN 2353, BSP, JIC 37°, ORFS, metric and NPT thread forms. Carbon steel and SS316L.

Show all 77 Hoses & Fittings ranges

Industrial hoses for air, water, food, oil, chemical, steam and abrasive applications. Own-brand Indus rubber and PVC lines alongside engineered metallic and PTFE hose assemblies.

Shackles, hooks, lifting chain, wire rope, slings, hoists and blocks for lifting and rigging — each size under an Indus part number, with the working load limit wherever the manufacturer rates it. Supplied from Dubai with the manufacturer's test certificate.

Wellhead, frac, and process oilfield valves — ball, gate, check, plug, choke, globe, butterfly, surface safety (SSV/ESD), pressure relief, instrumentation. API 6A / 6D / 16C, sour and standard service.

WECO frac iron, integral fittings, hammer unions, swivel joints, manifolds, API 6A flanges, wellhead systems, and surface test trees for upstream oil and gas. 1K to 20K psi, sour and standard service. FMC / Cameron / SPM / Anson / NOV / Stream-Flo / Indus.

Annular and ram blowout preventers built to the Hydril GK and Cameron U patterns, ram blocks, control units, choke & kill manifolds, diverters, drilling spools and BOP spares for onshore and offshore drilling, with sour-service (NACE MR0175) construction.

Oilfield instrumentation & controls — data acquisition, flowmeters (magnetic / turbine / Coriolis), pressure sensors, gauges, thermometers, AC/DC converters, VFD systems, ex-proof electrical panels.

Surface well-testing packages — 3-phase separators, MPFM systems, surge tanks, KO drums, flare stacks, test pumps, sand filters, ESD panels, data headers, piping packages.

Enerpac torque wrenches, bolt tensioners, flange tools, jacks, pullers, presses and cutters, Stanley hydraulic power tools and Pierce winches, listed by series with every model number.

Export quote · LA

Send the part list for Laos

Part numbers if you have them; bore, thread and pressure if you do not. A photo of the failed part is usually enough.

One line per item. Quantities and lengths help us quote from stock.

Drag and drop, or

PDF · JPG · PNG · HEIC · STEP · DWG — up to 25 MB each, 6 files

0 attachments ready

Standards

Standards we supply and certify against for Laos

StandardTypesApplies to
EN 8531SN · 2SNWire-braid hydraulic hose
EN 8564SP · 4SHSpiral-wire hydraulic hose
EN 8571SC · 2SCCompact wire-braid hose
SAE J517100R1 · R2 · R12 · R13 · R15SAE hydraulic hose series
ISO 18752Grades A–DPerformance-based hose classification
API 16CChoke & killWell control flexible lines
API 7KRotary & vibratorDrilling hose
API 6APSL 1–4Wellhead equipment
DIN 2353L · S seriesBite-type tube couplings
ISO 8434-124° coneMetric tube connections
ISO 6162 / 12151Code 61 · 62SAE flange and hose connections
EN 14420-5ClampedIndustrial hose couplings
NACE MR0175ISO 15156Sour-service materials
ISO 9001:2015CertifiedQuality management system

Customs

Tariff lines we declare under

  • 4009.22Rubber tube, reinforced with metal, with fittingsHydraulic hose assemblies
  • 4009.42Rubber tube, reinforced with other materials, with fittingsIndustrial hose assemblies
  • 7307.91Flanges, iron or steelSAE and API flanges
  • 7307.99Tube and pipe fittings, iron or steelAdapters, nipples, couplings
  • 8481.80Taps, cocks, valves and similar appliancesBall, gate, butterfly, needle
  • 8413.60Rotary positive displacement pumpsGear and vane pumps
  • 8412.21Hydraulic power engines, linear actingCylinders
  • 3403.99Lubricating preparationsGreases, pastes, compounds

Classification is confirmed line by line at quotation. This is the set most consignments to Laos are declared under.

Freight

Three ways in, priced per shipment

Sea + road28–36 days
Laem Chabang, then bonded through ThanalengDefault for most orders
Air freight4–7 days
DXB to VTE, usually via BangkokWhen the line is down
Sea + road, southern30–40 days
Da Nang and the east–west corridor for SavannakhetSouthern provinces

Sequence

How an order to Laos works

  1. 01Send the part numbers, or the bore, thread and pressure if you do not have them. A photo of the failed part is usually enough.
  2. 02We quote in USD against real stock, with the Incoterm stated on the Estimate rather than assumed.
  3. 03The Thai transit documents for the bonded move are arranged alongside the Lao declaration before the container is loaded, because the border will not improvise either of them.
  4. 04Goods sail to Laem Chabang and move north under bond, and you get the paperwork and tracking together.

Industries

Who we supply in Laos

Delivery coverage

Cities and sites we deliver to in Laos

DAP deliveries go to the site gate. Coordinates are given because project sites are easier to name that way than by address.

12 locations listed

  • Vientiane

    Vientiane Prefecture

  • Thanaleng

    Vientiane Province

  • Vang Vieng

    Vientiane Province

  • Luang Prabang

    Luang Prabang

  • Boten

    Luang Namtha

  • Muang Xay

    Oudomxay

  • Thakhek

    Khammouane

  • Savannakhet

    Savannakhet

  • Xepon

    Savannakhet

  • Pakse

    Champasak

  • Champasak

    Champasak

  • Attapeu

    Attapeu

Questions we get asked

Supplying Laos, in detail

01

Laem Chabang is three weeks from Jebel Ali — why is Vientiane closer to five?

Because the road leg north is a second journey, making 28–36 days from dispatch in total. The sea leg from Jebel Ali to Laem Chabang is 18–24 days, the same as for a Thai buyer; the rest is Thai transit clearance, the bonded road move north and the Thanaleng crossing. The southern routing through Da Nang for Savannakhet runs 30–40 days. Air freight into Vientiane takes 4–7 days, usually via Bangkok.

02

Is anything about the product itself certified before goods enter Laos?

No. Laos has no general pre-shipment conformity scheme for industrial hose and fittings, so nothing about the product needs certifying before it moves. The file that matters is the transit file: the Thai transit declaration for the bonded move and the Lao customs declaration, plus the commercial invoice, packing list and a Certificate of Origin attested by the Dubai Chamber.

03

Who prepares the Thai transit declaration and the Lao customs declaration?

The forwarder raises the Thai transit declaration at Laem Chabang for the bonded move; the importer lodges the Lao declaration through Lao Customs before the goods reach the border. Both are made against the same invoice and packing list, and they must agree line for line. We prepare that common set before the container is loaded, so neither office has anything to reconcile.

04

Why does the Thanaleng border, not the sailing, set the arrival date?

Because a mismatch stops the truck at the border rather than at either customs office, and the border keeps its own hours. A file that is short one document, or where the Thai and Lao paperwork disagree on a line, waits for the next working day. Everything that can be planned on this lane is on the paperwork side, so we finish it before the vessel sails.

05

Should goods for Savannakhet or Pakse come through Thailand or Vietnam?

Sometimes Vietnam. For Savannakhet, Pakse and the southern provinces, the east–west corridor from Da Nang can beat coming south from Vientiane after the Laem Chabang route; the Da Nang routing typically runs 30–40 days. We compare both against the actual sailings and the delivery site, and the quotation says which route was chosen and why.

06

Can you deliver to mine sites around Sepon and in the southern provinces?

Yes, on DAP terms to the site gate. The leg beyond Savannakhet or Pakse is quoted rather than estimated, because wet-season road conditions move it materially. Give us the site, the gate-entry requirements and the receiving contact. Mine plant runs dusty and continuous, so we specify hose covers and seals for abrasion and cycle life, and pack by machine or plant area.

07

Which seals and hose suit dam gates and spillway actuators in Laos?

Seals chosen for long static periods, with rod protection and attention to fluid condition, rather than mobile-plant parts. A gate actuator on a Mekong-basin dam may operate a few times a month, and standing still is where seals take a set, fluid degrades in the reservoir and unwiped rods corrode. Send the actuator data and duty pattern, and we specify against how the system sits, not how often it cycles.

08

Can you deliver past the border to a Vientiane site?

Yes, on DAP terms to the site, which is the usual basis for Laos. The container moves under Thai bond from Laem Chabang, crosses at Thanaleng and is delivered onward, with the road leg priced at quotation rather than estimated. Tell us the site, receiving hours and any zone entry paperwork, and the consignment is labelled to match the Lao declaration.

09

When should a Lao site fly a part in rather than wait for the road?

When a line is down. Air takes 4–7 days from DXB to Vientiane, usually via Bangkok, against five weeks or so by sea and road — the widest gap between air and surface on our network. That gap is also why planned work, such as a dam maintenance outage, should be shipped by surface and planned back from the outage date rather than rescued by air.

10

Can lifting gear for a Lao dam or road project travel on the same transit file as hydraulic parts?

Yes. Wire rope and chain slings, shackles, hooks and lifting hardware ship from Dubai marked with their working load limit and with the manufacturer’s test certificates the order calls for, packed with the hydraulic parts so one transit file covers both. Any import document a lifting line needs we confirm at quotation. Inspection on site stays with your appointed lifting inspector.

11

What should an enquiry from Laos include?

The delivery site, the part list with size, thread, pressure and material for each line, and the importer’s details for the Lao declaration. The site decides between Laem Chabang and Thanaleng or Da Nang and the east–west corridor; the line detail is what the Thai and Lao paperwork is built from. With those, the quotation states the route, Incoterm, transit and full document set.

Next step

Shipping to Laos?

Send the part numbers, or the bore, thread and pressure if you do not have them. We quote from real stock, in USD, with the Incoterm stated rather than assumed.

Plant-down? Call +971 52 2477942 — 24/7

Quick enquiry

RFQ · LA

No account needed. We reply from the Dubai export desk.

Other export markets · 126 destinations

We run the same lane from Dubai to 125 other markets

All export markets