Skip to content
+971 52 2477942
Lane DXB → BFRépublique du Burkina Faso

Export from Dubai

BF

Hydraulic & industrial hose supplier in Burkina Faso

Indus Hydraulics ships hydraulic, industrial and mining equipment from Dubai to Burkina Faso by sea to Abidjan or Tema and then about 1,100 km by road to Ouagadougou, typically 35–45 days, or by air into Ouagadougou in five to seven. The import is declared before shipment, regulated lines are verified at origin and coastal transit documents are prepared in French, so the paperwork is front-loaded. Gold is the market, at Essakane in the Sahel and Houndé in the west, and seasonal roads make ordering ahead worth more than splitting orders.

Typical transit
Typically 35–45 days, sea then road
Freight
Sea to Abidjan or Tema then the northern corridor · Air freight into Ouagadougou where the schedule is tighter
Incoterms 2020
DAP Ouagadougou or the buyer’s site · CIF Abidjan · FOB Jebel Ali · EXW Dubai for a nominated forwarder
Documentation
Import declaration before shipment · Pre-shipment verification for regulated goods · Ivorian or Ghanaian transit documents · Documents in French
Fig. 01 · Export lane DXB → BFMercator · WGS 84
NIANGOLOKOOUAGADOUGOUBOBO-DIOULASSOOUAHIGOUYAESSAKANEHOUNDÉFADA N’GOURMABANFORA4°W2°W0°2°E10°N12°N14°NN100 KMSEA + ROAD · 14,870 KM · FROM JEBEL ALI · DXB
Border crossingDelivery citysea + road corridor from JEBEL ALI · DXB
Origin
Jebel Ali · Dubai
Primary mode
Sea + road
Border crossing
Niangoloko
Transit
35–45 days
Quoted in
USD
Docs prepared
Before the vessel sails
Warehouse aisle with racked reels of hydraulic hose on one side and bins of steel hose fittings and adapters on the other

01 · Stock

Stock held in Dubai, not drop-shipped from a factory queue.

Technician in safety glasses crimping a steel fitting onto a hydraulic hose, tagged assemblies and a pressure-test cabinet behind

02 · Assembly

Assemblies crimped and pressure-tested before they are packed.

Export documents and certificates fanned out on a desk beside a rubber stamp, a pen and a hydraulic hose fitting

03 · Documents

Conformity set for Burkina Faso prepared while the order is picked.

Flatbed trailer loaded with shrink-wrapped hydraulic hose coils and cartons, strapped down at a warehouse yard gate

04 · Dispatch

One consignment, one set of documents, tracking on dispatch.

Catalogue · 21 clusters · 289 ranges

What we supply to Burkina Faso

Browse the full catalogue

Everything below ships from the same Dubai warehouse, so a mixed order travels as one consignment under one set of documents. Open any card for its full list of ranges, or follow a heading through to specifications and an RFQ.

Hydraulic hose, fittings and adapters — wire-braid, spiral, compact and thermoplastic hose, crimp fittings and ferrules, SAE J518 flanges, quick couplers, and DIN 2353, BSP, JIC 37°, ORFS, metric and NPT thread forms. Carbon steel and SS316L.

Show all 77 Hoses & Fittings ranges

Industrial hoses for air, water, food, oil, chemical, steam and abrasive applications. Own-brand Indus rubber and PVC lines alongside engineered metallic and PTFE hose assemblies.

Shackles, hooks, lifting chain, wire rope, slings, hoists and blocks for lifting and rigging — each size under an Indus part number, with the working load limit wherever the manufacturer rates it. Supplied from Dubai with the manufacturer's test certificate.

Wellhead, frac, and process oilfield valves — ball, gate, check, plug, choke, globe, butterfly, surface safety (SSV/ESD), pressure relief, instrumentation. API 6A / 6D / 16C, sour and standard service.

WECO frac iron, integral fittings, hammer unions, swivel joints, manifolds, API 6A flanges, wellhead systems, and surface test trees for upstream oil and gas. 1K to 20K psi, sour and standard service. FMC / Cameron / SPM / Anson / NOV / Stream-Flo / Indus.

DEMCO resilient-seated butterfly valves from 2″ to 36″ with actuators, gear operators and handles, Victaulic grooved butterfly valves, industrial and high-pressure hydraulic ball valves, and Yuken CETOP 3 solenoid directional, relief and modular valves.

Annular and ram blowout preventers built to the Hydril GK and Cameron U patterns, ram blocks, control units, choke & kill manifolds, diverters, drilling spools and BOP spares for onshore and offshore drilling, with sour-service (NACE MR0175) construction.

Oilfield instrumentation & controls — data acquisition, flowmeters (magnetic / turbine / Coriolis), pressure sensors, gauges, thermometers, AC/DC converters, VFD systems, ex-proof electrical panels.

Surface well-testing packages — 3-phase separators, MPFM systems, surge tanks, KO drums, flare stacks, test pumps, sand filters, ESD panels, data headers, piping packages.

Frac fleet equipment — pumpers up to 3,000 HP, transfer pumps, missiles, sand silos, blenders, hydration units, LAS, data vans, and frac tanks.

Axial piston, vane and gear hydraulic pumps — Bosch Rexroth A10VSO variable displacement from 45 to 100 cm³/rev and the PGH4 internal gear pump, with Parker T6C and T7B fixed-displacement vane pumps for machine-tool duty.

Enerpac torque wrenches, bolt tensioners, flange tools, jacks, pullers, presses and cutters, Stanley hydraulic power tools and Pierce winches, listed by series with every model number.

Export quote · BF

Send the part list for Burkina Faso

Part numbers if you have them; bore, thread and pressure if you do not. A photo of the failed part is usually enough.

One line per item. Quantities and lengths help us quote from stock.

Drag and drop, or

PDF · JPG · PNG · HEIC · STEP · DWG — up to 25 MB each, 6 files

0 attachments ready

Standards

Standards we supply and certify against for Burkina Faso

StandardTypesApplies to
EN 8531SN · 2SNWire-braid hydraulic hose
EN 8564SP · 4SHSpiral-wire hydraulic hose
EN 8571SC · 2SCCompact wire-braid hose
SAE J517100R1 · R2 · R12 · R13 · R15SAE hydraulic hose series
ISO 18752Grades A–DPerformance-based hose classification
API 16CChoke & killWell control flexible lines
API 7KRotary & vibratorDrilling hose
API 6APSL 1–4Wellhead equipment
DIN 2353L · S seriesBite-type tube couplings
ISO 8434-124° coneMetric tube connections
ISO 6162 / 12151Code 61 · 62SAE flange and hose connections
EN 14420-5ClampedIndustrial hose couplings
NACE MR0175ISO 15156Sour-service materials
ISO 9001:2015CertifiedQuality management system

Customs

Tariff lines we declare under

  • 4009.22Rubber tube, reinforced with metal, with fittingsHydraulic hose assemblies
  • 4009.42Rubber tube, reinforced with other materials, with fittingsIndustrial hose assemblies
  • 7307.91Flanges, iron or steelSAE and API flanges
  • 7307.99Tube and pipe fittings, iron or steelAdapters, nipples, couplings
  • 8481.80Taps, cocks, valves and similar appliancesBall, gate, butterfly, needle
  • 8413.60Rotary positive displacement pumpsGear and vane pumps
  • 8412.21Hydraulic power engines, linear actingCylinders
  • 3403.99Lubricating preparationsGreases, pastes, compounds

Classification is confirmed line by line at quotation. This is the set most consignments to Burkina Faso are declared under.

Freight

Three ways in, priced per shipment

Sea + road, via Abidjan35–45 days
Abidjan then the northern corridorDefault for most orders
Air freight5–7 days
DXB to OUAWhen the line is down
Sea + road, via Tema36–46 days
Tema then the Paga corridorAlternative routing

Sequence

How an order to Burkina Faso works

  1. 01Send the part numbers, or the bore, thread and pressure if you do not have them. A photo of the failed part is usually enough.
  2. 02We quote in USD against real stock, with the Incoterm stated on the Estimate rather than assumed.
  3. 03Once accepted, verification and both sets of transit documents are arranged before the container is loaded.
  4. 04Goods sail to the coast and move north by road, with the paperwork and tracking together.

Industries

Who we supply in Burkina Faso

Delivery coverage

Cities and sites we deliver to in Burkina Faso

DAP deliveries go to the site gate. Coordinates are given because project sites are easier to name that way than by address.

12 locations listed

  • Ouagadougou

    Centre Region

  • Bobo-Dioulasso

    Hauts-Bassins

  • Ouahigouya

    Nord Region

  • Essakane

    Sahel Region

  • Houndé

    Hauts-Bassins

  • Fada N’Gourma

    Est Region

  • Banfora

    Cascades Region

  • Koudougou

    Centre-Ouest

  • Kaya

    Centre-Nord

  • Dori

    Sahel Region

  • Tenkodogo

    Centre-Est

  • Dédougou

    Boucle du Mouhoun

Questions we get asked

Supplying Burkina Faso, in detail

01

Should Burkina Faso cargo route through Abidjan or Tema?

Abidjan for most orders: typically 35–45 days via the northern corridor and the Niangoloko crossing. Tema, 36–46 days via the Paga corridor, is the alternative when the Abidjan route is congested. On orders large enough for the difference to matter, we quote both, and the Ivorian or Ghanaian transit documents are prepared for whichever port is chosen.

02

Why is Ouagadougou about six weeks from Jebel Ali?

Four to five weeks by sea around the Cape, then roughly eleven hundred kilometres of road from the coast. Door to door is typically 35–45 days via Abidjan. Air freight from DXB into Ouagadougou (OUA) runs five to seven days and is quoted per shipment, which is the usual choice for a single critical line when plant is down.

03

Why does a Burkina Faso order clear customs twice?

Because it moves as transit at the coast and as an import at the border. Before the vessel sails, the consignee lodges the import declaration through the bank, regulated lines are verified at origin by the appointed inspection body, and the nominated forwarder prepares Ivorian or Ghanaian transit documents. We issue the French invoice and packing list and a Dubai Chamber attested Certificate of Origin to match.

04

Must the French invoice match the transit papers raised at Abidjan or Tema?

Yes. The French invoice and packing list have to match the transit paperwork raised at the coast, line for line, or the cargo waits while it is corrected. That is why we ask for the complete part list at quotation and prepare both document sets before the container is loaded: an amendment mid-corridor costs weeks, not days.

05

Can you deliver to Essakane, Houndé and other mine gates in Burkina Faso?

Yes, on DAP terms to the mine gate. Houndé sits on the road between Ouagadougou and Bobo-Dioulasso, and Essakane is in the Sahel Region near Dori; both final legs are quoted rather than estimated, as are the other northern sites. Tell us the site, the receiving contact and any access arrangements the site already works to.

06

Which wear parts do Burkina Faso's gold mines go through fastest?

On pit and crusher plant: four-spiral hose on loaders and haul trucks, high-cycle cylinders, slurry valves on the processing side and crusher-duty components. We supply all of them, with material certificates where the contract calls for them. Assemblies arrive crimped, pressure-tested, capped and tagged, so the site can reorder the same item by reference rather than re-measuring.

07

Does the rainy season affect deliveries to Burkina Faso?

It can. Overland routes into and across the interior are not equally passable all year, and a consignment that moves comfortably in one season can sit waiting in another. If maintenance work is coming, ordering ahead of the difficult months costs nothing extra and removes the variable. Tell us the window you are working to and we will say whether the timing is comfortable or tight.

08

Is it worth consolidating small orders for Burkina Faso?

Yes. There is no minimum on stock items, but this lane rewards consolidation: one consignment under one set of documents — one import declaration, one verification, one transit file — costs far less per line than three part shipments that each clear twice. Pooling hose, fittings, valves and rigging for the quarter into one container is usually the cheapest way to buy.

09

Can you supply dewatering and tailings hose for gold mines in Burkina Faso?

Yes. We supply suction and discharge hose for pit dewatering, abrasion-resistant hose for slurry and tailings lines, and water and fuel transfer hose with camlock or flanged ends, made up to length with couplings fitted in Dubai. Give us the bore, working pressure, media and whether the line runs under suction, and we size the hose to the pump rather than to the old length.

10

Can rigging gear for a Burkina Faso plant shutdown travel in the same container as the hydraulics?

Yes, and on a lane this long it should. Wire rope and chain slings, shackles, hooks and lifting accessories ship with their test certificates and marked working load limits, listed on the same packing list and French invoice as the hydraulic lines. One import declaration and one transit file then cover the whole shutdown package.

11

How do I get a quotation delivered to Ouagadougou or Bobo-Dioulasso?

Send the part list, photographs or old assemblies, quantities and the delivery point — Ouagadougou, Bobo-Dioulasso, a mine gate, or CIF Abidjan. We quote in USD on DAP Ouagadougou or site, CIF Abidjan, FOB Jebel Ali or EXW Dubai, and confirm which lines need verification. Once accepted, verification and both transit document sets are arranged before the container loads.

Next step

Shipping to Burkina Faso?

Send the part numbers, or the bore, thread and pressure if you do not have them. We quote from real stock, in USD, with the Incoterm stated rather than assumed.

Plant-down? Call +971 52 2477942 — 24/7

Quick enquiry

RFQ · BF

No account needed. We reply from the Dubai export desk.

Other export markets · 126 destinations

We run the same lane from Dubai to 125 other markets

All export markets