A lorry loader spends its life folded up and driven around, then unfolds and lifts. The hoses have to survive both, and the routing that suits one position rarely suits the other.

Written by
Ayush Bhatia, Director
Published
Updated
Reading
3 min · 2 sections
Share
Hydraulic hoses tracking around the articulated joints of a knuckle-boom crane mounted behind a flatbed truck cab
Hoses on a truck-mounted crane flex at every joint of the moving boom.

At a glance

Key takeaways

  1. The transit position is a working position for the hoses. Folded tight for a two-hour drive is a real duty.
  2. Telescoping sections need hoses that extend and retract, which is a different routing problem from bending.
  3. Stabiliser hoses hang low, get road spray, and are the most exposed on the vehicle.
  4. Lifting circuits are safety-critical: a failure can drop or shift a suspended load.
  5. Road vibration adds a cycle count nothing on a static machine experiences.

Figures verified · Diagnostic guidance from our own field service practice. No model-specific dimensions or circuit pressures.

A lorry loader is a crane that also does several hundred kilometres a week. That second job is invisible in most hose discussions and it is responsible for a good share of the failures — vibration, road debris and a folded transit geometry nobody measured the hoses in.

/01Two geometries, one hose.

A replacement measured with the crane deployed can be pinched, stretched or trapped when the boom folds for transit — and it spends far more hours folded than deployed. Check both positions before the machine leaves.

What to check, and in which position
CheckPosition
Hose not pulled tightHighlightedFull extension and full slew
Hose not pinched or trappedHighlightedFully folded transit position
Slack not able to snagBoth, and everything between
Clear of the load bed and the loadFolded, loaded

/02Telescoping and stabilisers.

Hydraulic hoses feeding an outrigger leg on an all-terrain mobile crane set up on site
Wherever a boom carries hose, a failure stops being a leak and becomes a lifting question.

Telescoping sections carry hoses that have to change length with the boom, usually over a sheave or in a chain-and-hose arrangement. That is a specialist routing and it is unforgiving of an assembly made to the wrong length — too short and it is torn out at full extension, too long and it fouls when retracted.

Stabiliser hoses have the opposite problem: they are simple, static and almost entirely neglected. They hang below the vehicle, take road spray, salt and stones, and their failure is the one that leaves a crane unable to set up on site. Replace them on age, in the construction printed on the old hose — 2SN, 2SC or 4SH — rather than waiting for the failure.

Grades used on lorry loader circuits

Common questions

Should truck crane hoses be replaced on age?
On lifting circuits, yes — the consequence of failure is why. That needs tagged assemblies with known build dates, which is worth setting up before it is needed rather than after.
Can I use a compact hose to improve the folded routing?
Often, and it is a good fit for this problem — roughly half the bend radius at the same pressure class. Confirm the pressure at the bore first.
The stabiliser creeps down overnight. Hose or cylinder?
Either, and it is worth diagnosing rather than guessing. A wet hose or fitting points one way; a dry machine that still creeps points at cylinder seals or a valve.
Do you fit on site?
Yes, across the UAE. For a crane that cannot fold for transit, that is usually the only workable option.
IndustryConstructionEarthmoving, lifting and concrete plant.MarketSupplying the Dominican Republic from DubaiFreight, import documents and lead times for mining and processing operations in the Dominican Republic.MarketSupplying Burkina Faso from DubaiFreight, import documents and lead times for mining and processing operations in Burkina Faso.

What next

  1. 01
  2. 02
  3. 03

    Where we send parts for this machine

    A stopped machine in a yard with no hose shop nearby is the situation this catalogue is stocked for. We build the assemblies to the measurements described here and dispatch them from Dubai — by air where the machine is down, by sea where the change is planned. Fleet operators usually send us the machine and the hose position rather than a part number, which is enough to work from.

    Everything above ships from the same Dubai warehouse. If your destination is not listed, it is almost certainly still one we quote. See every export destination

Lorry loader down?

Send photographs of the failed hose in both positions if you can — deployed and folded. It is the fastest way to get the replacement right first time.

Plant-down? Call +971 52 2477942 — 24/7