Skip to content
+971 52 2477942
Lane DXB → CDRépublique démocratique du Congo

Export from Dubai

CD

Hydraulic & industrial hose supplier in DR Congo

Indus Hydraulics supplies the DRC from Dubai by two different lanes. The copper and cobalt belt in Haut-Katanga and Lualaba is reached by sea to Durban and road up the North-South Corridor through Kasumbalesa, typically 30–40 days, or through Dar es Salaam; Kinshasa and the west come in through Matadi on the Atlantic in 32–40. Regulated lines are verified before shipment, invoices and packing lists are issued in French, and air freight reaches Lubumbashi or Kinshasa in five to seven days.

Typical transit
Typically 30–40 days to Katanga by sea via Durban then road · 32–40 days via Matadi for Kinshasa and the west
Freight
Sea to Durban then the corridor to Kasumbalesa · Dar es Salaam as an alternative · Matadi for Kinshasa and the west · Air freight where the schedule matters
Incoterms 2020
DAP to the buyer’s site · CIF Durban or Matadi · FOB Jebel Ali · EXW Dubai for a nominated forwarder
Documentation
Pre-shipment verification for regulated goods · Transit documents for the corridor countries · Documents in French · Certificate of Origin, Dubai Chamber attested
Fig. 01 · Export lane DXB → CDMercator · WGS 84
UGANDAGABONCONGOANGOLAKASUMBALESALUBUMBASHIKOLWEZIKINSHASAMATADIKISANGANIGOMAMBUJI-MAYI10°E15°E20°E25°E30°E35°E10°S5°S0°5°NN400 KMSEA + ROAD · 9,310 KM · FROM JEBEL ALI · DXB
Border crossingDelivery citysea + road corridor from JEBEL ALI · DXB
Origin
Jebel Ali · Dubai
Primary mode
Sea + road
Border crossing
Kasumbalesa
Transit
30–40 days
Quoted in
USD
Docs prepared
Before the vessel sails
Warehouse aisle with racked reels of hydraulic hose on one side and bins of steel hose fittings and adapters on the other

01 · Stock

Stock held in Dubai, not drop-shipped from a factory queue.

Technician in safety glasses crimping a steel fitting onto a hydraulic hose, tagged assemblies and a pressure-test cabinet behind

02 · Assembly

Assemblies crimped and pressure-tested before they are packed.

Export documents and certificates fanned out on a desk beside a rubber stamp, a pen and a hydraulic hose fitting

03 · Documents

Conformity set for DR Congo prepared while the order is picked.

Flatbed trailer loaded with shrink-wrapped hydraulic hose coils and cartons, strapped down at a warehouse yard gate

04 · Dispatch

One consignment, one set of documents, tracking on dispatch.

Catalogue · 21 clusters · 289 ranges

What we supply to DR Congo

Browse the full catalogue

Everything below ships from the same Dubai warehouse, so a mixed order travels as one consignment under one set of documents. Open any card for its full list of ranges, or follow a heading through to specifications and an RFQ.

Hydraulic hose, fittings and adapters — wire-braid, spiral, compact and thermoplastic hose, crimp fittings and ferrules, SAE J518 flanges, quick couplers, and DIN 2353, BSP, JIC 37°, ORFS, metric and NPT thread forms. Carbon steel and SS316L.

Show all 77 Hoses & Fittings ranges

Industrial hoses for air, water, food, oil, chemical, steam and abrasive applications. Own-brand Indus rubber and PVC lines alongside engineered metallic and PTFE hose assemblies.

Shackles, hooks, lifting chain, wire rope, slings, hoists and blocks for lifting and rigging — each size under an Indus part number, with the working load limit wherever the manufacturer rates it. Supplied from Dubai with the manufacturer's test certificate.

Wellhead, frac, and process oilfield valves — ball, gate, check, plug, choke, globe, butterfly, surface safety (SSV/ESD), pressure relief, instrumentation. API 6A / 6D / 16C, sour and standard service.

WECO frac iron, integral fittings, hammer unions, swivel joints, manifolds, API 6A flanges, wellhead systems, and surface test trees for upstream oil and gas. 1K to 20K psi, sour and standard service. FMC / Cameron / SPM / Anson / NOV / Stream-Flo / Indus.

DEMCO resilient-seated butterfly valves from 2″ to 36″ with actuators, gear operators and handles, Victaulic grooved butterfly valves, industrial and high-pressure hydraulic ball valves, and Yuken CETOP 3 solenoid directional, relief and modular valves.

Annular and ram blowout preventers built to the Hydril GK and Cameron U patterns, ram blocks, control units, choke & kill manifolds, diverters, drilling spools and BOP spares for onshore and offshore drilling, with sour-service (NACE MR0175) construction.

Oilfield instrumentation & controls — data acquisition, flowmeters (magnetic / turbine / Coriolis), pressure sensors, gauges, thermometers, AC/DC converters, VFD systems, ex-proof electrical panels.

Surface well-testing packages — 3-phase separators, MPFM systems, surge tanks, KO drums, flare stacks, test pumps, sand filters, ESD panels, data headers, piping packages.

Frac fleet equipment — pumpers up to 3,000 HP, transfer pumps, missiles, sand silos, blenders, hydration units, LAS, data vans, and frac tanks.

Enerpac torque wrenches, bolt tensioners, flange tools, jacks, pullers, presses and cutters, Stanley hydraulic power tools and Pierce winches, listed by series with every model number.

Export quote · CD

Send the part list for DR Congo

Part numbers if you have them; bore, thread and pressure if you do not. A photo of the failed part is usually enough.

One line per item. Quantities and lengths help us quote from stock.

Drag and drop, or

PDF · JPG · PNG · HEIC · STEP · DWG — up to 25 MB each, 6 files

0 attachments ready

Standards

Standards we supply and certify against for DR Congo

StandardTypesApplies to
EN 8531SN · 2SNWire-braid hydraulic hose
EN 8564SP · 4SHSpiral-wire hydraulic hose
EN 8571SC · 2SCCompact wire-braid hose
SAE J517100R1 · R2 · R12 · R13 · R15SAE hydraulic hose series
ISO 18752Grades A–DPerformance-based hose classification
API 16CChoke & killWell control flexible lines
API 7KRotary & vibratorDrilling hose
API 6APSL 1–4Wellhead equipment
DIN 2353L · S seriesBite-type tube couplings
ISO 8434-124° coneMetric tube connections
ISO 6162 / 12151Code 61 · 62SAE flange and hose connections
EN 14420-5ClampedIndustrial hose couplings
NACE MR0175ISO 15156Sour-service materials
ISO 9001:2015CertifiedQuality management system

Customs

Tariff lines we declare under

  • 4009.22Rubber tube, reinforced with metal, with fittingsHydraulic hose assemblies
  • 4009.42Rubber tube, reinforced with other materials, with fittingsIndustrial hose assemblies
  • 7307.91Flanges, iron or steelSAE and API flanges
  • 7307.99Tube and pipe fittings, iron or steelAdapters, nipples, couplings
  • 8481.80Taps, cocks, valves and similar appliancesBall, gate, butterfly, needle
  • 8413.60Rotary positive displacement pumpsGear and vane pumps
  • 8412.21Hydraulic power engines, linear actingCylinders
  • 3403.99Lubricating preparationsGreases, pastes, compounds

Classification is confirmed line by line at quotation. This is the set most consignments to DR Congo are declared under.

Freight

Three ways in, priced per shipment

Sea + road, via Durban30–40 days
North-South Corridor to KasumbalesaDefault for Katanga
Sea, via Matadi32–40 days
Atlantic routing for Kinshasa and the westWestern deliveries
Air freight5–7 days
DXB to FIH or FBMWhen the line is down

Sequence

How an order to DR Congo works

  1. 01Send the part numbers, or the bore, thread and pressure if you do not have them. A photo of the failed part is usually enough.
  2. 02We quote in USD against real stock, with the Incoterm stated on the Estimate rather than assumed.
  3. 03Once accepted, verification and the transit documents for the chosen corridor are arranged before the container is loaded.
  4. 04Goods sail to the chosen port and move inland by road, with the paperwork and tracking together.

Industries

Who we supply in DR Congo

Delivery coverage

Cities and sites we deliver to in DR Congo

DAP deliveries go to the site gate. Coordinates are given because project sites are easier to name that way than by address.

12 locations listed

  • Lubumbashi

    Haut-Katanga

  • Kolwezi

    Lualaba

  • Kinshasa

    Kinshasa

  • Matadi

    Kongo Central

  • Kisangani

    Tshopo

  • Goma

    North Kivu

  • Mbuji-Mayi

    Kasaï-Oriental

  • Likasi

    Haut-Katanga

  • Boma

    Kongo Central

  • Bukavu

    South Kivu

  • Kananga

    Kasaï-Central

  • Kasumbalesa

    Haut-Katanga

Questions we get asked

Supplying DR Congo, in detail

01

Who supplies hydraulic hose and mining equipment to the DRC from Dubai?

Indus Hydraulics ships hydraulic hose, fittings, slurry valves, cylinders and industrial hose from Dubai to the DRC. Katanga deliveries go by sea to Durban and road through Kasumbalesa, typically 30–40 days, or via Dar es Salaam; Kinshasa and the west go through Matadi in 32–40 days. Invoices and packing lists are issued in French, and air freight takes five to seven days.

02

Which routing is right for our delivery in the DRC?

It depends on the delivery town. Lubumbashi, Likasi and Kolwezi go overland from Durban through Kasumbalesa, or from Dar es Salaam; Kinshasa, Matadi and the west go through the Atlantic port of Matadi. Routing a consignment the wrong way costs weeks and thousands of kilometres, so the delivery town is the first thing we ask for at quotation.

03

How long does shipping from Dubai to Lubumbashi take?

Typically 30–40 days by sea from Jebel Ali to Durban and then road up the North-South Corridor to the Kasumbalesa border and on to Lubumbashi. Dar es Salaam is the alternative routing for Katanga. For a plant-down, air freight into Lubumbashi takes five to seven days and is quoted per shipment. Dispatch dates are confirmed on the Estimate.

04

Can you supply the copper and cobalt mines in Katanga?

Yes. Slurry valves, four-spiral hose, high-cycle cylinders and crusher-duty components are the bulk of what we ship into the belt, with material certificates where the contract calls for them. Where hose meets acidic leach solution or reagents, send the medium, concentration and temperature: the answer is often a chemical or composite hose rather than rubber, and we will say so.

05

Can you deliver to Kolwezi and Likasi?

Yes, on DAP terms to the mine gate. Consignments clear the Kasumbalesa border and continue by road to Likasi and Kolwezi; the leg beyond Kasumbalesa is quoted rather than estimated, because it depends on load, route and border queues. Mines in Lualaba often combine the planned shutdown requirement into one consignment so the road leg is paid once.

06

Do the shipping documents have to be in French for DR Congo?

Yes. The commercial invoice and packing list are issued in French, and they have to match the transit paperwork for whichever corridor the consignment takes, whether through South Africa and Zambia from Durban or through Tanzania from Dar es Salaam. We prepare the French documents before dispatch so the forwarder’s transit documents are built on the same line descriptions.

07

Which documents are needed to import hydraulic parts into the DRC?

The set is pre-shipment verification for regulated goods by an appointed inspection body before the vessel sails, transit documents for the corridor countries from the nominated forwarder, the invoice and packing list in French, a Certificate of Origin attested by Dubai Chamber, and material and test certificates where the order calls for them. Anything further is confirmed at quotation.

08

Is air freight available to the DRC?

Yes: five to seven days from Dubai into Kinshasa N’djili or Lubumbashi, quoted per shipment. It is the answer for a plant-down on the belt, when a crusher, haul truck or pump is stopped for one assembly. For planned maintenance, sea and road cost a fraction of air, and the verification and French documents take the same time either way.

09

Do you crimp and pressure-test hose assemblies before shipping to Katanga mine sites?

Yes. Assemblies are cut to length, crimped and pressure-tested in Dubai and shipped as finished items, tagged with the hose, the fitting and the test date. On a 30–40 day lane, a tagged assembly that can be reordered by reference is worth more than loose hose and fittings, and it avoids crimping on site with the wrong dies.

10

Which hose standards suit Katanga mining equipment?

Four-spiral hose to EN 856 or ISO 18752 is the usual choice for high-pressure, high-impulse circuits on drills, loaders and haul trucks, with SAE J517 and EN 853 for lower-pressure lines. Fittings are supplied in BSP, JIC, ORFS, NPT and metric threads. Abrasion-resistant covers and spring guards matter as much as pressure rating on mine equipment.

11

Can you supply lifting and rigging equipment to DRC mine sites?

Yes. Wire rope and chain slings, shackles, hooks and rigging hardware are supplied for mine maintenance, plant shutdowns and construction, with test certificates where the order calls for them. Whether a line counts as regulated for pre-shipment verification is confirmed from the part numbers at quotation, and the French documents cover lifting gear like the rest of the consignment.

12

How do I get a quotation from the DRC?

Send the part numbers or specification, quantities, the delivery town and your preferred Incoterm: DAP to site, CIF Durban or Matadi, FOB Jebel Ali or EXW Dubai for your own forwarder. We quote in USD on a written Estimate stating the routing and freight mode, and route the consignment once, correctly, from the delivery town you give us.

Next step

Shipping to DR Congo?

Send the part numbers, or the bore, thread and pressure if you do not have them. We quote from real stock, in USD, with the Incoterm stated rather than assumed.

Plant-down? Call +971 52 2477942 — 24/7

Quick enquiry

RFQ · CD

No account needed. We reply from the Dubai export desk.

Other export markets · 126 destinations

We run the same lane from Dubai to 125 other markets

All export markets