
Reusing fittings in a rebuild: what survives, and what belongs in the bin
Half the parts in the tray are perfectly good and half are finished. Sorting them takes a light and two minutes, and getting it wrong shows up after reassembly.
3 min read
From the workshop · Indus blog
No SEO bait, no marketing fluff. Just practical writing about hydraulic systems from the people who specify, install and rebuild them every day.

Half the parts in the tray are perfectly good and half are finished. Sorting them takes a light and two minutes, and getting it wrong shows up after reassembly.
3 min read

Steel is patient and rubber is not. What actually degrades on a shelf in a hot workshop, and how to organise a store so the oldest stock leaves first.
3 min read

A fitting can be contaminated before anyone opens the bag. What happens to parts over a long sea leg and a longer shelf, and the two minutes that prevent it.
3 min read

Put stainless into a plated steel port on a wet, salty site and the corrosion does not stop — it changes address. Sometimes that is the right trade.
3 min read

Tape on a tapered thread is correct. Tape on a cone, a flat face or an O-ring boss is how a good joint is made to leak — and how debris gets into the system.
3 min read

The fitting is cheap and the thing it screws into is not. How to judge what is in front of you, and the cases where the honest answer is that it is finished.
3 min read

A seized joint is decided months earlier, at the moment somebody made it up. What that person could have done differently, and what they could not.
3 min read

Both faults leak, and the marks they leave are different. What to look for on a joint somebody else assembled, and which of the two is the expensive one.
3 min read

A weep is evidence before it is a fault. Where the oil appears — at the seat, down the thread, under the nut — narrows the cause to one of four things.
3 min read

A factory is the one environment where the thread population is a choice rather than an inheritance. Most plants never make that choice, and pay for it every week.
3 min read

There is a real domestic supply chain here, which changes the question. Local is usually right — these are the specific cases where it is not.
3 min read

A mill runs flat out for months and then stops dead. Everything about stocking, inspection and replacement follows that calendar rather than the failure rate.
3 min read
Newsletter · 2× a month
Engineers and procurement leads get our notes every other Tuesday.
Send us a circuit, a failure photo or a bare SKU. Our applications engineers reply same business day, no charge.
Ask an engineer →