Storing fittings and seals on a site that has no cool store

Steel is patient and rubber is not. What actually degrades on a shelf in a hot workshop, and how to organise a store so the oldest stock leaves first.

Written by
Ayush Bhatia, Director
Published
Updated
Reading
3 min · 3 sections
Share
Steel shelves of bins with hydraulic fittings and bagged seal kits in a workshop store
Fittings and seals stored without a cool store need extra care with heat and light.

Most stores on the sites we supply are a container, a shipping office or a corner of a workshop, all of which get hot. That is survivable for steel and unkind to everything else on the shelf — and the parts that suffer are precisely the cheap ones nobody thinks of as perishable.

/01What ages and what does not.

On a hot shelf
ItemHow it faresWhat to do
Steel fittings and adaptersIndefinite, if dry and baggedKeep bagged; watch humidity, not time
O-rings and bonded sealsHighlightedHarden and take a set with heat and lightCool, dark, dated, first in first out
Made-up hose assembliesAge from the day they were builtTag with the build date; rotate stock
Bulk hoseAges; also takes a set if coiled tightlyStore flat or on large-radius coils, out of sun

/02A store that works in a container.

Steel shelving inside a shipping-container store holding bagged steel fittings and closed boxes, one box open showing rubber seals, lit by a single overhead bulb
FIG. 01The rubber is what ages on a hot shelf. Dating it and keeping it dark is the whole of the practice.

Four things do most of the work and none of them cost anything: date what arrives, keep elastomers in a closed box away from the hottest wall, separate clean stock from used and returned parts, and put the caps back on. Add a light and somewhere to write, and the store stops being the place parts go to deteriorate.

The one thing worth spending on is a sealed box for the seals — not a cupboard, a box with a lid, kept off the floor and away from sunlight and any equipment producing ozone. It is the highest return per dirham in this article.

/03Deciding what to keep.

The consumables that gate a repair — seals, bonded washers, caps, plugs — should be held deep, because they are cheap, they stop a job dead, and they are the first thing to run out. The expensive items should be held to a list that someone can justify, and everything else ordered against a photograph. A store that holds a little of everything holds nothing usefully. For most fleets that means depth in the two or three hose fitting families the machines actually carry, and the adapters that bridge them.

Frequently asked questions

How long can we keep O-rings?
It depends on compound and conditions rather than a single figure, and heat shortens it sharply. Date them on arrival, keep them cool and dark, use the oldest first, and discard anything that has gone hard or shows surface crazing.
Is it worth holding made-up assemblies?
For the circuits that stop production, yes — and tag them with the build date so they are rotated rather than accumulated. An assembly that has sat for years in a hot container is not the insurance the site thinks it is.
What should be in a small site store?
Ends in the bores that actually fail, a box each of bonded seals and O-rings, caps and plugs, and one assembly per stopping circuit. That is a short list, and it covers most of what a remote site actually loses time to.

What next

  1. 01
  2. 02
  3. 03

    Where we support programmes like this

    A hose register or a planned replacement programme is easier to run against one supplier than against whatever happens to be available near the site that month, and that is most of why operators outside the UAE set one up with us. The parts list is held against your machines, quoted as a single package, and shipped from Dubai to a date you set rather than to a dispatch date.

    Everything above ships from the same Dubai warehouse. If your destination is not listed, it is almost certainly still one we quote. See every export destination

Restocking a site store?

Send what you hold and what you keep running out of. We will propose depth where it prevents a stoppage, say what is not worth holding, and quote it as one consignment.

Plant-down? Call +971 52 2477942 — 24/7

Keep reading

More on Maintenance & reliability

All articles in this topic
Air-operated grease pump in a 200-litre drum, feeding a grease gun by hose, with a one-shot oil lubricator on a bench

Grease and oil drum pumps and manual lubricators: pump ratio, drum size and when to go automatic

8 min read

Electric oil lubrication pump with clear reservoir feeding copper lines and meter units on a CNC machine side panel

Centralised lubrication systems: SLR, PDI, progressive, dual-line and multi-line compared

10 min read

Back to Blog