Hydraulic & industrial hose supplier in Philippines

Indus Hydraulics ships hydraulic hose, fittings, valves and oilfield equipment from Jebel Ali to Manila or Batangas in typically 19–25 days by sea, or by air into Manila, with the PS licence or ICC clearance arranged only where a line sits on the regulated list. Luzon is the only international gate: Cebu, Davao and Cagayan de Oro, and the nickel mines of Mindanao, are a further domestic sailing that we quote by city. Geothermal duty is the lane’s specialist work, and we specify it from your fluid analysis.

Typical transit
Typically 19–25 days by sea to Manila · 26–35 days to Cebu, Davao or Cagayan de Oro, transhipped · 3–5 days by air into Manila
Freight
Sea freight from Jebel Ali to Manila for Luzon · Batangas where the northern port is congested · Cebu, Davao and Cagayan de Oro on a further domestic leg · Air freight into Manila where the schedule is tighter
Incoterms 2020
CIF Manila · DAP to the buyer’s site · FOB Jebel Ali · EXW Dubai for a nominated forwarder
Documentation
PS licence or ICC clearance where the product is on the regulated list · Certificate of Origin, Dubai Chamber attested · Import entry raised by the importer through the Bureau of Customs
Fig. 01 · Export lane DXB → PHMercator · WGS 84
MANILA · PORTQUEZON CITYLAGUNABATANGASCLARKCEBUDAVAOCAGAYAN DE ORO115°E120°E125°E130°E5°N10°N15°N20°NN400 KMSEA · MALACCA · 8,760 KM · FROM JEBEL ALI · DXB
Port of entryDelivery citysea · malacca corridor from JEBEL ALI · DXB
Origin
Jebel Ali · Dubai
Primary mode
Sea, via Malacca
Port of entry
Manila · Luzon
Transit
19–25 days
Quoted in
USD
Docs prepared
Before the vessel sails
Warehouse aisle with racked reels of hydraulic hose on one side and bins of steel hose fittings and adapters on the other

01 · Stock

Stock held in Dubai, not drop-shipped from a factory queue.

Technician in safety glasses crimping a steel fitting onto a hydraulic hose, tagged assemblies and a pressure-test cabinet behind

02 · Assembly

Assemblies crimped and pressure-tested before they are packed.

Export documents and certificates fanned out on a desk beside a rubber stamp, a pen and a hydraulic hose fitting

03 · Documents

Conformity set for Philippines prepared while the order is picked.

Flatbed trailer loaded with shrink-wrapped hydraulic hose coils and cartons, strapped down at a warehouse yard gate

04 · Dispatch

One consignment, one set of documents, tracking on dispatch.

Catalogue · 21 clusters · 289 ranges

What we supply to Philippines

Browse the full catalogue

Everything below ships from the same Dubai warehouse, so a mixed order travels as one consignment under one set of documents. Open any card for its full list of ranges, or follow a heading through to specifications and an RFQ.

Hydraulic hose, fittings and adapters — wire-braid, spiral, compact and thermoplastic hose, crimp fittings and ferrules, SAE J518 flanges, quick couplers, and DIN 2353, BSP, JIC 37°, ORFS, metric and NPT thread forms. Carbon steel and SS316L.

Show all 77 Hoses & Fittings ranges

Industrial hoses for air, water, food, oil, chemical, steam and abrasive applications. Own-brand Indus rubber and PVC lines alongside engineered metallic and PTFE hose assemblies.

Shackles, hooks, lifting chain, wire rope, slings, hoists and blocks for lifting and rigging — each size under an Indus part number, with the working load limit wherever the manufacturer rates it. Supplied from Dubai with the manufacturer's test certificate.

Wellhead, frac, and process oilfield valves — ball, gate, check, plug, choke, globe, butterfly, surface safety (SSV/ESD), pressure relief, instrumentation. API 6A / 6D / 16C, sour and standard service.

WECO frac iron, integral fittings, hammer unions, swivel joints, manifolds, API 6A flanges, wellhead systems, and surface test trees for upstream oil and gas. 1K to 20K psi, sour and standard service. FMC / Cameron / SPM / Anson / NOV / Stream-Flo / Indus.

DEMCO resilient-seated butterfly valves from 2″ to 36″ with actuators, gear operators and handles, Victaulic grooved butterfly valves, industrial and high-pressure hydraulic ball valves, and Yuken CETOP 3 solenoid directional, relief and modular valves.

Annular and ram blowout preventers built to the Hydril GK and Cameron U patterns, ram blocks, control units, choke & kill manifolds, diverters, drilling spools and BOP spares for onshore and offshore drilling, with sour-service (NACE MR0175) construction.

Oilfield instrumentation & controls — data acquisition, flowmeters (magnetic / turbine / Coriolis), pressure sensors, gauges, thermometers, AC/DC converters, VFD systems, ex-proof electrical panels.

Surface well-testing packages — 3-phase separators, MPFM systems, surge tanks, KO drums, flare stacks, test pumps, sand filters, ESD panels, data headers, piping packages.

Frac fleet equipment — pumpers up to 3,000 HP, transfer pumps, missiles, sand silos, blenders, hydration units, LAS, data vans, and frac tanks.

Enerpac torque wrenches, bolt tensioners, flange tools, jacks, pullers, presses and cutters, Stanley hydraulic power tools and Pierce winches, listed by series with every model number.

Export quote · PH

Send the part list for Philippines

Part numbers if you have them; bore, thread and pressure if you do not. A photo of the failed part is usually enough.

One line per item. Quantities and lengths help us quote from stock.

Drag and drop, or

PDF · JPG · PNG · HEIC · STEP · DWG — up to 25 MB each, 6 files

0 attachments ready

Standards

Standards we supply and certify against for Philippines

StandardTypesApplies to
EN 8531SN · 2SNWire-braid hydraulic hose
EN 8564SP · 4SHSpiral-wire hydraulic hose
EN 8571SC · 2SCCompact wire-braid hose
SAE J517100R1 · R2 · R12 · R13 · R15SAE hydraulic hose series
ISO 18752Grades A–DPerformance-based hose classification
API 16CChoke & killWell control flexible lines
API 7KRotary & vibratorDrilling hose
API 6APSL 1–4Wellhead equipment
DIN 2353L · S seriesBite-type tube couplings
ISO 8434-124° coneMetric tube connections
ISO 6162 / 12151Code 61 · 62SAE flange and hose connections
EN 14420-5ClampedIndustrial hose couplings
NACE MR0175ISO 15156Sour-service materials
ISO 9001:2015CertifiedQuality management system

Customs

Tariff lines we declare under

  • 4009.22Rubber tube, reinforced with metal, with fittingsHydraulic hose assemblies
  • 4009.42Rubber tube, reinforced with other materials, with fittingsIndustrial hose assemblies
  • 7307.91Flanges, iron or steelSAE and API flanges
  • 7307.99Tube and pipe fittings, iron or steelAdapters, nipples, couplings
  • 8481.80Taps, cocks, valves and similar appliancesBall, gate, butterfly, needle
  • 8413.60Rotary positive displacement pumpsGear and vane pumps
  • 8412.21Hydraulic power engines, linear actingCylinders
  • 3403.99Lubricating preparationsGreases, pastes, compounds

Classification is confirmed line by line at quotation. This is the set most consignments to Philippines are declared under.

Freight

Three ways in, priced per shipment

Sea, FCL19–25 days
Jebel Ali to Manila or BatangasDefault for most orders
Air freight3–5 days
DXB to MNLWhen the line is down
Sea, outer islands26–35 days
Transhipped for Cebu, Davao or Cagayan de OroBeyond Luzon

Sequence

How an order to Philippines works

  1. 01Send the part numbers, or the bore, thread and pressure if you do not have them. A photo of the failed part is usually enough.
  2. 02We quote in USD against real stock, with the Incoterm stated on the Estimate rather than assumed.
  3. 03Where a line falls under the PS or ICC scheme the clearance is arranged before the container is loaded; where it does not, we say so rather than building cost around it.
  4. 04Goods sail from Jebel Ali to Manila, or transhipped onward for the Visayas and Mindanao, with the paperwork and tracking together.

Industries

Who we supply in Philippines

Close-up of a mining shovel’s hydraulic boom cylinders and hoses as it loads a haul truck in an open-pit mine
mining

Mining in Philippines

Nickel laterite operations in Surigao and the wider Caraga region of Mindanao and in southern Palawan, plus copper-gold mines in Benguet and Nueva Vizcaya — dust-rated, high-cycle hose and fittings for haul trucks, excavators and ore-handling plant.

Industry page
Spillway radial gates on a hydroelectric dam, each raised by a pair of hydraulic cylinders, water rushing beneath
power

Power & Energy in Philippines

Steam and H2S-rated assemblies for the geothermal fields at Tiwi, Makban and Leyte and the plants on Negros and Mindanao, plus actuator and governor hydraulics for coal-fired, diesel and hydro plant.

Industry page
A hydraulic anchor-handling winch on the wet aft deck of an offshore supply vessel, an oil platform on the horizon
marine

Marine & Offshore in Philippines

Deck machinery and vessel hydraulics for the shipbuilding and repair yards at Subic Bay and Balamban in Cebu, and the inter-island ferry, RoRo and cargo fleet working out of Manila, Cebu and Davao.

Industry page
An excavator’s boom cylinders and hydraulic hoses on a construction site, a hazy city skyline behind
construction

Construction in Philippines

Excavator, crane and piling-rig hydraulics for the North–South Commuter Railway, the Metro Manila Subway, the new Manila airport in Bulacan, and expressway and bridge works across Luzon and the Visayas.

Industry page
A BOP accumulator unit with rows of pressure bottles, a pump skid and bundled hydraulic hoses at the base of a desert land rig at sunset
oil · gas

Oil & Gas in Philippines

Refinery and terminal support at Limay in Bataan and the Batangas import terminals, and the Malampaya gas-to-power chain that lands at Batangas — valves, flow iron, transfer hose and wellhead parts.

Industry page
A glowing steel strip passing through a hot rolling mill stand with its hydraulic cylinders and tubing
steel

Steel & Metals in Philippines

High-force cylinders and servo valves for the rebar and section mills, forming and fabrication shops of the Calabarzon industrial estates in Cavite, Laguna and Batangas, and around Clark.

Industry page

Delivery coverage

Cities and sites we deliver to in Philippines

DAP deliveries go to the site gate. Coordinates are given because project sites are easier to name that way than by address.

16 locations listed

  • Manila

    Metro Manila

  • Quezon City

    Metro Manila

  • Cavite

    Calabarzon

  • Laguna

    Calabarzon

  • Batangas

    Calabarzon

  • Bataan

    Central Luzon

  • Subic

    Central Luzon

  • Clark

    Central Luzon

  • Cebu

    Central Visayas

  • Mactan

    Central Visayas

  • Iloilo

    Western Visayas

  • Bacolod

    Western Visayas

  • Davao

    Davao Region

  • General Santos

    Soccsksargen

  • Cagayan de Oro

    Northern Mindanao

  • Zamboanga

    Zamboanga Peninsula

Questions we get asked

Supplying Philippines, in detail

01

Is hydraulic hose covered by the PS licence or the ICC mark?

Often not, but the part list decides. The PS licence, held by the manufacturer, and the ICC clearance, issued per shipment by the Bureau of Philippine Standards, are the two routes through the regulated-product scheme, and they apply to a defined list. A great deal of industrial hose and fittings sits outside it. Send the part list at quotation and we say which lines, if any, need clearance, rather than certifying everything to be safe.

02

What transit should a Luzon buyer plan on from Jebel Ali?

Typically 19–25 days from dispatch to Manila or Batangas for a full container, routed through the Strait of Malacca. Cargo for Cebu, Davao or Cagayan de Oro is transhipped onto a domestic sailing and takes 26–35 days in total. Air freight from DXB to Manila (MNL) takes 3–5 days. Any PS or ICC clearance is arranged before loading, so it does not add to the sailing.

03

When is Batangas a better port than Manila?

When Manila is congested or the delivery sits south of the capital. Manila suits most of Luzon, including Quezon City, Bulacan and Central Luzon. Batangas is closer to the Calabarzon estates in Laguna and Batangas and to the refinery and terminal sites on Batangas Bay. Name the delivery town at enquiry and we choose the port against it rather than defaulting to Manila.

04

What does the importer file with the Bureau of Customs, and what do you supply for it?

The importer lodges the import entry and internal revenue declaration through the Bureau of Customs before arrival. We prepare the documents it rests on: commercial invoice and packing list, a Certificate of Origin attested by the Dubai Chamber, the PS licence or ICC clearance where a line is listed, and material and test certificates where the order calls for them. Matching descriptions across all of them keep the entry from being queried.

05

Why is a Visayas or Mindanao delivery quoted separately from Manila?

Because the international sailing reaches Luzon and nowhere else. Cargo for Cebu, Iloilo, Davao or Cagayan de Oro waits for a domestic feeder, which adds a week or more however clean the paperwork is. Shipping to Manila and reconsigning later adds handling as well. Name the city where the goods are used, not the country, and the quotation states the real arrival date and the domestic leg.

06

Can you supply nickel mines in Surigao and the Caraga region?

Yes. Goods reach Mindanao on the domestic leg into Cagayan de Oro or Davao, and the move from the regional port to the mine site is quoted rather than estimated, because road conditions and the wet season change it. Laterite mining is wet, abrasive and dusty, so we specify hose covers, fittings and seals for abrasion and cycle life as well as pressure, and pack by machine or pit.

07

Which hose survives geothermal steam and H2S at Philippine plants?

Usually PTFE-lined or specific alloy metallic assemblies, chosen against the actual fluid analysis. Geothermal fluid at fields such as Tiwi, Makban and Leyte arrives hot, wet and carrying hydrogen sulphide; ordinary rubber constructions fail on temperature, and several stainless grades are vulnerable to sulphide stress cracking. Send the fluid composition, temperature and pressure, and the specification follows from it rather than from the word geothermal.

08

Do you supply valves and wellhead parts for Philippine gas and refinery work?

Yes. We supply TechnipFMC, Cameron (SLB), SPM, Anson, Stream-Flo and WOM equipment, so valves, flow iron and wellhead parts for the Batangas terminals, the Limay refinery or offshore gas work can ship with hydraulic hose. API 6A wellhead, API 16A BOP, API 16C choke and kill and API 7K drilling hose are available, with NACE MR0175 material documentation where the contract requires it. Ratings and certificates are confirmed per line at quotation.

09

Can a consignment go on from Manila to a Subic Bay Freeport or Clark address?

Yes, on DAP terms, by road from Manila. Subic Bay Freeport and Clark in Central Luzon are an overland leg from the port rather than a separate sailing, and that leg is priced at quotation. For shipyard and freeport deliveries, tell us the zone’s gate-entry and paperwork requirements at enquiry, so the truck is not held at the freeport gate.

10

Can wire rope slings and shackles for Subic Bay or Balamban yard work ship with our hydraulic order?

Yes. Wire rope and chain slings, shackles, hooks and lifting hardware ship from Dubai marked with their working load limit and with the manufacturer’s test certificates the order calls for, alongside hydraulic parts. Whether a lifting line falls on the PS or ICC list is checked from the part list at quotation. On-site inspection and the yard’s lifting records remain with your appointed inspector.

11

Does air freight into Manila help a mine or plant in the Visayas or Mindanao?

Sometimes, for a line that is down. Air takes 3–5 days from DXB to Manila against 19–25 days by sea, but the onward move to an outer island still has to be booked, and it does not run faster because the goods arrived by air. For a planned shutdown, sea freight planned back from the outage date is usually the better answer.

Next step

Shipping to Philippines?

Send the part numbers, or the bore, thread and pressure if you do not have them. We quote from real stock, in USD, with the Incoterm stated rather than assumed.

Plant-down? Call +971 52 2477942 — 24/7

Quick enquiry

RFQ · PH

No account needed. We reply from the Dubai export desk.

Other export markets · 126 destinations

We run the same lane from Dubai to 125 other markets

All export markets