How to choose
Choose by load, span and sling angle
Find the span between the load's two lifting points, then read the beam's chart at the top sling angle you can rig: the rated load drops as the sling angle widens, so 45° gives the lowest figure and 20° the highest. The chart also gives the shortest top sling for each angle. Rig the bottom slings vertically from the end links, and never hang a load from a strut.










