A concrete pump is the machine on a typical site whose hydraulics are working hardest — high pressure, high flow, and a cycle that reverses every few seconds for hours. It is also the machine where the word "hose" means two entirely different things depending on who is speaking.
/01Two kinds of hose, one machine.
| Property | Hydraulic hose | Concrete delivery hose |
|---|---|---|
| Carries | Hydraulic fluid | Concrete |
| Selected onHighlighted | Pressure at bore, bend radius, temperature | Abrasion life and burst rating for concrete duty |
| Fails as | Loss of function; injection risk | Blockage, burst, or whipping under pressure |
| Covered here | Yes | No — a separate subject |
/02Why pumping circuits are impulse duty.

The pumping cylinders alternate: one pushes while the other draws, then they swap, continuously. From the hose’s point of view that is not steady pressure — it is a pressure cycle, repeated for as long as the pour lasts. Cycle count, not peak pressure, is what consumes an assembly on this duty.
That is the case spiral construction exists for. Braided hose loses rating steeply as bore rises, while spiral holds a near-flat figure across its range — which is why the large-bore, high-pressure, high-cycle circuits on a pump are spiral rather than braid. On our range that means 4SH or R13, crimped with spiral hose fittings.
| Construction | −16 | −20 | −24 | −32 |
|---|---|---|---|---|
| EN 853 2SN braid | 165 | 125 | 90 | 80 |
| EN 856 4SH spiralHighlighted | 380 | 350 | 300 | 250 |
| SAE 100R13 spiralHighlighted | 350 | 350 | 350 | 350 |
/03Boom and outriggers.
The placing boom folds, slews and telescopes, and carries hoses along its length in the same way a truck crane does — with the same transit-versus-deployed geometry problem, and the same tendency for a replacement measured in one position to fail in the other.
Outriggers on a pump are carrying a machine with a long boom extended over a site. They are structural to the safety of the whole operation, and their hoses sit low, get concrete on them, and get washed down aggressively at the end of every pour.
At the other end of the pump, the concrete itself leaves through a placement hose; see concrete placement hose: pressure classes and hose whip.
Spiral constructions for pumping circuits
Common questions
- Can I fit braided hose to a pumping circuit to save cost?
- Not at the bores these circuits use. At −24 a two-wire braid is rated 90 bar against 300 for four-spiral; that is not a saving, it is a different component. Compare at the bore before treating any substitution as equivalent.
- Washing the machine down damages hoses. What can we do?
- Keep the lance at a distance and away from hose ends and fittings. Close-range pressure washing drives water through covers and strips them at existing scars — which then corrodes the reinforcement invisibly.
- How often should pump hydraulic hoses be replaced?
- On a schedule reflecting cycle count rather than calendar age alone. A pump doing continuous pours accumulates cycles far faster than a machine of similar age doing intermittent work.
- Do you cover concrete delivery hose?
- It is a separate specification with its own safety considerations and is not what this article covers. Ask us and we will point you at the right product rather than at this page.