Skip to content

Blowout Preventers (BOP)

48 SKUs2 brands

Showing 1–48 of 48 SKUs

Oteco rotating-head stripper rubber, conical moulded rubber with steel flange — representative of the Grant range

Oteco Stripper Rubbers for Grant Rotating Heads

OtecoGrant 7068 and 8068 rotating headsNatural rubber (NR), nitrile (NBR), butyl
Inquire
Oteco stripper rubber for Shaffer rotating head, conical rubber body with steel mounting flange

Oteco Stripper Rubbers for Shaffer Rotating Heads

OtecoRotating BOP stripper rubberShaffer Type 50, 74, 79 and 51 rotating heads
Inquire
Oteco annular packing unit for Hydril GK — the preventer these seal kits and U-seals service

Oteco Seal Kits & Seals for Hydril Annular BOPs

OtecoHydril GK and MSP annular BOPsNitrile (NBR)
Inquire
Oteco packing unit for Shaffer spherical annular BOP, domed rubber element with steel segments

Oteco Packing Units for Shaffer Spherical & Regan Type K Annular BOPs

OtecoShaffer spherical and Regan Type K annular BOPsAnnular BOP packing unit
Inquire
Oteco annular BOP packing unit for Hydril GK, moulded rubber with steel inserts, black natural rubber

Oteco Packing Units for Hydril GK, GKM & MSP Annular BOPs

OtecoAnnular BOP packing unitNatural rubber (NR), nitrile (NBR), neoprene (CR)
Inquire
Category image · Blowout Preventers (BOP)
Category image · Blowout Preventers (BOP)
Category image · Blowout Preventers (BOP)
Category image · Blowout Preventers (BOP)
Category image · Blowout Preventers (BOP)
Category image · Blowout Preventers (BOP)
Category image · Blowout Preventers (BOP)
Category image · Blowout Preventers (BOP)
Red double ram blowout preventer with four hydraulic bonnet cylinders and flanged top bore

Ram Blowout Preventer, API 16A, 7-1/16" to 30", 5,000 to 20,000 psi

Indus HydraulicsBlowout preventer, ram5,000 to 20,000 psi working pressure
Inquire
Category image · Blowout Preventers (BOP)
Stainless choke and kill control console with gauge panel and open electrical cabinet

Choke and Kill Control Panel, Drilling

Indus HydraulicsFor API 16C choke manifolds21 MPa (3,000 psi) control pressure
Inquire
Category image · Blowout Preventers (BOP)

Choke & Kill Manifold, 3-1/16" 10,000 psi WP, API 16C, Sour Service (NACE MR0175)

Indus HydraulicsChoke & Kill ManifoldSour Service (NACE MR0175)
Inquire
Red skid-mounted choke and kill manifold with gate valves, chokes and gauge risers

Choke and Kill Manifold, API 16C, 3,000 to 20,000 psi

Indus HydraulicsChoke and kill manifoldAPI 6A flanged or studded; hammer union
Inquire

Questions we get asked

About this range

01What is the difference between an annular and a ram BOP?
An annular BOP closes a large rubber packing element around whatever is in the hole — drill pipe, casing, a tool joint or an open hole — so it is the first, most versatile seal. A ram BOP closes two steel rams from either side; each ram set is made for one job, such as sealing on a given pipe size or shearing pipe. A typical stack combines one or two annulars above several ram cavities.
02What are pipe, variable-bore, blind and blind-shear rams?
Pipe rams have a cut-out that seals around one pipe diameter. Variable-bore rams (VBRs) seal on a range of diameters, such as 3-1/2″ to 5″. Blind rams have no cut-out and seal an empty hole. Blind-shear rams cut through the pipe in the hole and then seal, and are the last line of defence.
03What does a BOP control unit (accumulator) do?
It stores hydraulic fluid under nitrogen pressure so that every BOP function can be closed even if the rig loses power. Pumps charge the accumulator bottles, and a manifold of control valves — one per station — sends fluid to open or close each preventer. API 16D sets how much usable fluid it must hold for the stack it serves, and remote panels let the driller operate it from the drill floor.
04Are these original Cameron or Hydril BOPs?
The BOPs and ram blocks on this shelf are built to the Cameron U and Hydril GK patterns, not by Cameron or Hydril. Original Cameron equipment can also be quoted separately. Before fitting pattern parts to an existing stack, confirm them against its drawings and your operator's equipment policy.
05Which BOP spares should be kept on site?
At minimum, ram packers and top seals for each ram size in use, a spare annular packing unit, bonnet and door seals, and a set of ring gaskets, studs and nuts for every flanged connection that may be broken. The shelf includes BX ring gasket sets, B7M/2HM sour-service stud and nut kits, and complete nipple-up kits for common stack sizes.
06What is a drilling spool or a double-studded adapter?
A drilling spool is a short flanged body placed in the stack to add side outlets for the choke and kill lines, or to space the preventers. A double-studded adapter (DSA) joins two connections of different size or pressure rating — for example 13-5/8″ 10K to 11″ 10K — in the shortest possible height.
07What is a diverter and when is it used?
A diverter is a low-pressure system fitted on top-hole sections, before the BOP stack is installed, to route an unexpected flow of shallow gas away from the rig through large vent lines rather than try to shut it in, which the weak shallow formations could not hold.