Skip to content
+971 52 2477942
INDUS HYDRAULICSIH-BOP-RB-PIPE-CAM-U-11-10K-5DP-INDUS· MADE IN UAE

Pipe Ram Block Assembly, Cameron U Style 11" 10K, for 5" Drill Pipe, Sour Service (NACE MR0175)

Ram Blocks & AssembliesEx-stock · delivery in 3 days
⚙
Pipe Ram Block Assembly, Cameron U Style 11" 10K, for 5" Drill Pipe, Sour Service (NACE MR0175)

Pipe ram block assembly, Cameron U style 11" 10K, sized for 5" drill pipe, sour service. The slim-hole / workover ram block for sour-service infill drilling across the GCC.

Key features

  • Spare Part Type: Pipe Ram Block Assembly
  • Service Class: Sour Service (NACE MR0175)
Spare Part Type
Pipe Ram Block Assembly
Fits OEM
Cameron U 11" 10K
BOP Bore Size
11"
Cold Working Pressure
10000 psi
Pressure Class
10K
Service Class
Sour Service (NACE MR0175)
Ships in 24h
Order before 14:00 GST · Jebel Ali
24-month warranty
Manufacturer-backed · genuine parts
Engineering support
A real applications engineer

Product description

The Pipe Ram Block Assembly, Cameron U Style 11" 10K, for 5" Drill Pipe, Sour Service (NACE MR0175) is a recurring-purchase pipe ram block assembly sized for 11" bore BOP equipment. The Cameron-U-style pipe ram block for 11" 10K BOP cavities — slim-hole / workover variant. Sized for 5" DP (the most common workover string OD). HNBR sour-service standard. NACE MR0175 / ISO 15156 sour-service compliant — required across Saudi Aramco, ADNOC, KOC, PDO, QatarEnergy default specifications for the GCC.

Construction

  • Spare-part type: Pipe Ram Block Assembly
  • Fits OEM: Cameron U 11" 10K
  • BOP bore size: 11"
  • Cold working pressure: 10,000 psi (10K class)
  • Service class: Sour Service (NACE MR0175)
  • Elastomer compound: HNBR (sour-service grade)
  • Pipe / tubing size: 5" drill pipe (5.000" OD)
  • Material: Forged AISI 4130 alloy steel block (NACE MR0175 hardness controlled); HNBR top seal, front packer, side packers
  • Temperature rating: -20°F to 250°F (-29°C to 121°C) — sour-service NACE MR0175 envelope

Kit contents

Pipe ram block (1) + top seal (1) + front packer (1) + side packers (2) + ram screws (4) + assembly grease (1 tube) — single cavity

OEM compatibility

Engineered as a recognised aftermarket-acceptable replacement for the following OEM equipment lines (Indus Hydraulics is not an authorised distributor of these OEMs — parts are manufactured to the OEM dimensional standard with full mill test reports and API monogram traceability):

  • Cameron U 11" 10K pipe ram
  • Shaffer SL pipe ram 11" 10K
  • Hydril V 11" 10K pipe ram

Applications

  • Cameron U 11" 10K ram block replacement (one cavity)
  • Slim-hole infill drilling
  • Workover BOP stack maintenance on sour wells
  • CT and snubbing prep ram block replacement

Performance & testing

Each unit is dimensionally inspected against the OEM datum, dye-penetrant or magnetic-particle inspected for surface defects, and shipped with mill test reports per EN 10204 3.1 / 3.2. Elastomer parts are batch-tested for hardness, compression set, and fluid resistance (sour service variants tested per NACE TM0297 / TM0187 where applicable). Charpy V-notch impact testing on metallic parts available where service requires low-temperature toughness verification.

Compliance

  • API 16A (per part class)
  • NACE MR0175 / ISO 15156 (sour-service / H₂S)
  • EN 10204 3.1 / 3.2 mill test reports
  • Dimensional inspection report per part
  • Heat-number / batch traceability

Sealed & dated packaging (GCC climate)

50 °C ambient + UV degrades unsealed elastomers in storage. Indus ships every elastomer / packing element / soft-goods kit in heat-sealed UV-resistant bags with manufacture date, batch number, and recommended-use-by date stamped on the outer label. Re-sealable bins for partial use. This is what Aramco / ADNOC / KOC supplier audits ask about — make sure you specify "sealed dated packaging" on the RFQ.

How to order

Confirm on your RFQ: (a) exact OEM part number or BOP serial number being serviced (we cross-reference to the matched aftermarket part), (b) bore size and working pressure, (c) drill-pipe or casing OD if a ram packer or VBR, (d) elastomer compound preference (HNBR / AFLAS for sour service GCC default), (e) bolting grade (B7M / L7M for sour), (f) certification requirements (NACE, charpy, mill 3.2 vs 3.1, IKTVA / ICV documentation), (g) destination port and packaging requirements. Indus quotes ex-Dubai (AED) — sales@indushydraulics.me or WhatsApp +971.

Identification

ParameterValue
Spare Part TypePipe Ram Block Assembly
Fits OEMCameron U 11" 10K
BOP Bore Size11"
Pipe / Tubing Size5" drill pipe (5.000" OD)

Performance

ParameterValue
Cold Working Pressure10000 psi
Pressure Class10K
Service ClassSour Service (NACE MR0175)
Temperature Rating-20°F to 250°F (-29°C to 121°C) — sour-service NACE MR0175 envelope

Construction

ParameterValue
Elastomer CompoundHNBR
Material of ConstructionForged AISI 4130 alloy steel block (NACE MR0175 hardness controlled); HNBR top seal, front packer, side packers

Compliance

ParameterValue
API Specification16A

Configuration

ParameterValue
Kit ContentsPipe ram block (1) + top seal (1) + front packer (1) + side packers (2) + ram screws (4) + assembly grease (1 tube) — single cavity

Shipping & lead time

Lead TimeEx-stock from Dubai — delivered within 3 working days in the UAE. Export orders ship on the lane stated for the destination.
OriginMade in UAE

Shipped worldwide from our Dubai warehouse. Transit, routes and documentation for 126 destinations

RELATED · OFTEN PAIRED WITH

Engineers viewing this also looked at