Category
Surge Tanks
Dual-compartment well-testing surge tanks. ASME U-certified, hi-lo level sensors, PSV, liquid-level gauges.
1 SKUs1 brands
Delivery
Surge Tanks across the Gulf
Ex-stock from Dubai, delivered within 3 working days in the UAE.
Well testing spreads are mobilised for a campaign and demobilised after it, so the equipment behind them is bought against a schedule rather than held as stock. That suits an export lane: the scope is known ahead, the certification can be prepared in advance, and freight can take the economical route because the date that matters is the campaign date rather than the dispatch date. Send us the scope and we will quote to the former.
Saudi ArabiaTypically 3 working days from dispatchOmanTypically 3 working days from dispatchQatarTypically 3 working days from dispatchBahrainTypically 3 working days from dispatchKuwaitTypically 3 working days from dispatch
Beyond the Gulf
- CIS & Caucasus
- Kazakhstan, Ukraine, Armenia
IH-WTS-DC100-600-DNV
IH-WTS-DC100-600-DNV
Well-Testing Surge Tank, Dual-Compartment, 100 BBL, 600 psi, ASME U, DNV Skid
Indus Hydraulics
