Skip to content
+971 52 2477942
IH-LR-TB-D1478TG

DIN 1478 Turnbuckle — Galvanized

Turnbuckles & Rigging ScrewsEx-stock · delivery in 3 days
DIN 1478 Turnbuckle — Galvanized — dimension drawing, eye and eye
VIEW 01·DIN 1478 Turnbuckle — Galvanized — dimension drawing, eye and eye
1 / 7

DIN 1478 Turnbuckle, in 59 sizes, WLL 75 to 16,500 kg. Not for overhead lifting. Indus part numbers.

Key features

  • Product type: DIN 1478 Turnbuckle
  • Pattern / standard: DIN 1478
  • Working load limit: 75 to 16,500 kg
Working load limit
75 to 16,500 kg
Finish
Zinc plated, hot-dip galvanized
Ships in 24h
Order before 14:00 GST · Jebel Ali
24-month warranty
Manufacturer-backed · genuine parts
Engineering support
A real applications engineer

Product description

DIN 1478 Turnbuckle for tension, lashing and fixing duty. Built to the DIN 1478 pattern. Zinc plated, hot-dip galvanized.

Not for overhead lifting. The manufacturer rates this range for tension, lashing or fixing, not for lifting. For a lift, use a rated lifting component — ask us which.

Sizes and ratings

59 sizes. Working load limit 75 to 16,500 kg. Available as: eye and eye, hook and eye, hook and hook, jaw and eye, jaw and jaw, stub ends, body only. Every size has its own Indus part number in the table below, with the loads in the unit the manufacturer rates them in.

The lettered dimensions in the table refer to the dimension drawing for each type, shown with this product.

Choosing a size

Choose on WLL with the end fittings you will use — hook ends rate lower than eyes or jaws — and on the take-up length you need. Lock the body once tensioned so it cannot back off.

Ordering

Quote the Indus part number from the size table, or send the size and rating you need.

Identification

ParameterValue
Product typeDIN 1478 Turnbuckle
Pattern / standardDIN 1478
Sizes59

Performance

ParameterValue
Working load limit75 to 16,500 kg

Construction

ParameterValue
FinishZinc plated, hot-dip galvanized

Shipping & lead time

Lead TimeEx-stock from Dubai — delivered within 3 working days in the UAE. Export orders ship on the lane stated for the destination.

Shipped worldwide from our Dubai warehouse. Transit, routes and documentation for 126 destinations

From the blog

Written about this part

RELATED · OFTEN PAIRED WITH

Engineers viewing this also looked at