Skip to content
SERVICES · WORKSHOPS · ON-SITE

Things people bring us broken, and what we sent back.

Jobs / yr
2,400+
Avg TAT
96h
On-time
100%
Technicians breaking a large tie-rod hydraulic cylinder out of a workover unit skid in an industrial yard, removed cylinders lined up on timber bearers
Case of the week

No. 01CYLINDERS · OILFIELDMAR 2026 · BAY 2 / ON-SITE

Eight tie-rod cylinders, 96 hoses, and a workover rig that needed to be back on a well in 19 days.

ADNOC sub-contractor pulled a 50,000-lb hydraulic workover unit off a sour-gas well in the Rub’ al Khali. We rebuilt eight tie-rod cylinders, 96 hoses and four accumulators in our JAFZA yard — back skidding 23 days later.

  • 19 D TAT
  • NACE MR0175
  • ADNOC AVL
Indus Hydraulics🇦🇪 UAE · Jebel Ali
Read the case
A trainee at a well-control simulator console with an instructor pointing at the displays and three other trainees watching
IWCF TRAINING2-5 D / COURSE

No. 20IWCF TRAINING

IWCF and IADC WellSharp well-control certification — the cards Aramco asks for, taught by people who have closed a real BOP under a real kick.

  • IWCF + IADC WellSharp accredited
  • Aramco-spec supervisor cert
  • Bilingual EN / AR on request
  • Monthly open enrolment
A rotating control device bearing assembly opened on a bench, its moulded rubber sealing element being measured with a vernier caliper
RCD / MPD2-6 WEEK CYCLE

No. 19RCD / MPD

The RCD service line that keeps Managed Pressure Drilling inside its narrow window — passive seals, bearings, and the ancillary kit downstream.

  • 4 OEM families serviced
  • Function test 200 rpm under pressure
  • NACE MR0175 sour service
  • MPD ancillary in scope
A very large-bore diverter housing on timber bearers with its rubber sealing element extracted and overboard valve trim laid out nearby
DIVERTER RECERT4-8 WEEK CYCLE

No. 18DIVERTER RECERT

A 21-1/4" 2K diverter recert — because shallow gas doesn't belong on the rig floor.

  • Hydrotest 3,000 psi · 0 drop
  • Close-divert function · witnessed
  • API 16A recert · 5 yr validity
  • NACE MR0175 sour service
Ram blocks from a high-pressure blowout preventer staged on a bench while a technician runs a bench hardness tester on one face
15K HPHT BOP8-14 WEEK CYCLE

No. 1715K HPHT BOP

A 15K HPHT BOP service for the GCC's nastiest reservoirs — where 30% H₂S is the design case, not the worst case.

  • Hydrotest 22,500 psi · 0 drop
  • Charpy + NACE on every metallic
  • API 16A HPHT recert · 5 yr
  • HNBR / AFLAS · HPHT-qualified
An engineer with a clipboard dwarfed by a subsea blowout preventer stack standing several storeys tall in a manufacturer’s test bay
SUBSEA FAT/SITPER-PROJECT · 4-8 WEEK

No. 16SUBSEA FAT/SIT

Your eyes on the OEM floor — independent FAT and SIT witness on a new-build subsea BOP stack.

  • IWCF Supervisor + 15+ yr authority
  • API 16A · 16D · 17D witness
  • Operator stamp + signed report
  • NACE MR0175 sour service
A compact four-ram intervention blowout preventer with all bonnets open, four matched pairs of ram blocks laid out in front of it
CT/SNUB/WL BOP2-6 WEEK CYCLE

No. 15CT/SNUB/WL BOP

Intervention BOPs are not drilling BOPs — and the workshop discipline is not the same.

  • CT Quad · Snub · Wireline
  • Hydrotest 1.5× WP · 30 min
  • API 16A recert · 5 yr
  • NACE MR0175 sour service
Three technicians in flame-resistant coveralls running a function test on a blowout preventer stack under a land rig substructure
FIELD CREWDAY-RATE · 48 H DISPATCH

No. 14FIELD CREW

A BOP field service crew on day-rate — IWCF cards, H₂S certs, and a truck rolling out of Jebel Ali in 48 hours.

  • 48 h standard dispatch · 24 h emergency
  • IWCF L4 + WellSharp + SAEP-1142
  • Day-rate · 30+ day campaigns
  • NACE MR0175 sour service
A complete workover blowout preventer stack assembled on a test stand ready to mobilise, shipping skid and crate waiting alongside
STACK RENTAL7-DAY MOB · 30-365 DAYS HIRE

No. 13STACK RENTAL

The 11" 10K workover BOP stack we keep on a 7-day mob — and a fresh API STD 53 cert in the box.

  • Mob 5 — 7 days from PO
  • Hydrotest cert ≤14 d
  • Spares pool on standby
  • NACE MR0175 sour service
An annular preventer open with its rubber packing element hoisted clear in a sling, new elastomer seals laid out in order on the bench
ANNUAL REDRESS12-MONTH CYCLE · 5-10 D

No. 12ANNUAL REDRESS

The 12-month BOP redress — Aramco-spec elastomer renewal, on-rig in a week or workshop in three.

  • Per-cavity HNBR / AFLAS soft goods
  • API STD 53 pressure tests
  • 12-month redress certificate
  • NACE MR0175 sour service
A pressure test in progress on a land rig, chart recorder pen drawing a rising trace while a supervisor watches from behind the barrier
PRESSURE TESTINGPER-RIG · 14-DAY CYCLE

No. 11PRESSURE TESTING

The 14-day BOP test cycle, per API STD 53 — every active rig in the GCC, every two weeks, on the chart.

  • API STD 53 · 14-day cycle
  • 5K · 10K · 15K stacks
  • IWCF Level 4 supervisor
  • NACE MR0175 sour service
A custom machined steel hydraulic manifold block clamped on a hydrotest bench with its ports plugged and a pressure gauge in the circuit
BUILD4 WK BUILD

No. 10BUILD

A plant engineer walked in with a sketch on grid paper. Four weeks later we bolted his 16-port manifold to the press.

  • 630 BAR HYDROTEST · PASS
  • 27 / 27 LEAK PATHS
  • EN24 · 850 MPA
  • 4-WK BUILD CYCLE
An analyst at a microscope in an oil condition laboratory, a rack of hydraulic oil samples ranging from clear amber to near black beside it
LAB5 D / SAMPLE

No. 09LAB

Fourteen hydraulic systems, one rising iron trend, and a pump bearing caught three weeks before it grenaded.

  • 14 / 14 verdicts on time
  • Bearing caught at 75% spall
  • ~AED 800K avoided
  • ISO 4406:2017
A hose assembly bay mid-build, long tables of finished tagged hose assemblies grouped by circuit while technicians work the crimping press
HOSES14 D BUILD

No. 08HOSES

112 assemblies, 14 days, every hose tagged. A cold-stacked rig refitted for sour service.

  • 112 / 112 PROOF-PASS
  • 14-DAY BUILD
  • NACE MR0175 PER ASSEMBLY
A skid-mounted hydraulic power unit with its reservoir lid off while a technician draws a baseline oil sample into a bottle
HPU8 D ON BENCH

No. 07HPU

A 50 HP rig HPU came in for a filter change. The schematic on file was wrong, the oil was at 22/19/16, and the noise floor was 7 dB louder than the operator remembered.

  • OIL 17/15/12
  • −7 DB CABIN
  • SCHEMATIC REDRAWN
  • 6 MO WARRANTY
A high-pressure choke and kill manifold on steel stands, its run of flanged gate valve bodies and handwheels receding down the frame
CHOKE & KILL28 D ON BENCH

No. 06CHOKE & KILL

A 3-1/16" 10K choke & kill manifold, eight gate valves, and the trim swap that bought it five more years of sour service.

  • 5-YR RECERT STAMPED
  • 15K HYDROTEST · 10/10
  • NACE MR0175 CERT
A coiled-tubing injector head stripped on a workshop bench, drive chains slack and worn gripper blocks laid out for re-facing
CT & WIRELINE5 D EMERGENCY

No. 05CT & WIRELINE

A CT injector skid pulled mid-job from a sour Aramco well — back on location in five days, not seven.

  • 5-day turnaround · slot held
  • OEM commissioning · 24/24
  • Same-week return
A hydraulic closing-unit skid part-stripped, accumulator bottles laid down in a row and the pilot valve bank opened up on the bench
KOOMEY8 D ON BENCH

No. 04KOOMEY

Eleven nitrogen bottles, four spent bladders, and an API 16D 5-year clock with thirty days left.

  • API 16D · 5-yr stamp
  • 11 / 11 SPM passed
  • 8 days bench
  • NACE MR0175
A double-ram blowout preventer on stands with both bonnets swung open, ram blocks on a bench behind under non-destructive testing
BOP & RECERT42 D ON BENCH

No. 03BOP & RECERT

A 5-year recert on a 13-5/8" 10K Cameron Type-U — and an annular that came off the bench faster than it went on.

  • Hydrotest 15,000 psi · 0 drop
  • Annular −0.6 s vs last rig run
  • API 16A recert · valid to 2031
  • NACE MR0175 sour service
A triplex mud pump fluid end on a workshop rebuild bench with its liner bores empty and a technician lapping a valve seat
MUD PUMP11 D ON BENCH

No. 02MUD PUMP

A 12-P-160 fluid end the operator wanted to scrap — and the AED 1.4 million we talked them out of spending.

  • AED 1.4 M saved
  • 11 days on bench
  • 7,500 psi hydrotest
HOW WE WORK · A LOOK INSIDE

The same four steps run every service, every time — from a piston seal to a BOP recert.

  1. Every asset gets a 4-hour intake — photographed, tagged, logged before anyone touches it.

    On-site or in our Jebel Ali yard, intake is the first defensible step. Walk-around photos, fluid sample, OEM nameplate, recerts audit. The intake report is on the operator’s desk inside 4 hours of the asset being on the ground — before a single bay-hour is billed.

    Walk-around photo logFluid sampleOEM nameplate captureRecerts audit
STEP 01 · INTAKE & PHOTO REPORT
Technicians photograph, tag and sample a worn hydraulic cylinder at intake, with callouts for each intake record
LONG READS · ENGINEERS WRITING ABOUT THEIR JOBS

Two recent service stories worth your time.

A complete workover blowout preventer stack assembled on a test stand ready to mobilise, shipping skid and crate waiting alongside
FROM THE FIELD · STACK RENTAL · 30 D ON BENCH

The 11" 10K workover BOP stack we keep on a 7-day mob — and a fresh API STD 53 cert in the box.

Indus's 11" 10,000 psi workover BOP stack rental — Cameron-U double-ram + Hydril GK annular + matched 3-1/16" 10K choke manifold + Koomey Type 80 control unit. Sour-service trim, hydrotest cert dated inside fourteen days of ship, 5 — 7 day mobilisation from Jebel Ali, 30 — 365 day hire windows, spares pool staged for the duration.

Mob 5 — 7 days from PO
Outcome
Hydrotest cert ≤14 d
Outcome
Spares pool on standby
Outcome

MANUFACTURING · CASTING · FORGING · CNC

The production line behind the fittings we supply.

Our principal manufacturing partner runs casting, forging and CNC workshops under one process chain. Twelve controlled stages, material traceability and inspection records with every batch.

Production workshops
3
Controlled process stages
12
Visual inspection
100%
SERVICE INTAKE · OPEN 24×7 · JEBEL ALI

If it leaks, hums, screams, drips, slips or simply refuses to move — we’d like a look at it.

Send us a photo, an SKU or a part on a pallet. We’ll do the rest.

An applications engineer will read your ticket inside one business day — no charge for the conversation, no obligation to use us.