Skip to content
IH-LR-BH-PML

Pod, Module & Cradle Lifting Systems — EN 13155

Lifting BeamsContact for availability
Rectangular pod lifting frame hanging a bathroom pod on four vertical slings
VIEW 01·Rectangular pod lifting frame hanging a bathroom pod on four vertical slings
1 / 4

Lifting systems for bathroom pods, modular building units, plant modules and long items in cradles: one-over-two spreader systems, pod lifting frames and installation cradles, engineered to EN 13155.

Key features

  • Product type: Pod / module lifting system (made to order)
  • Pattern / standard: EN 13155; ASME B30.20 / BTH-1 or DNV offshore design on request
  • Size range: Built to the module
  • Working load limit: To order
Material
Structural steel, grade to the design
Ships in 24h
Order before 14:00 GST · Jebel Ali
24-month warranty
Manufacturer-backed · genuine parts
Engineering support
A real applications engineer

Product description

Modular buildings and bathroom pods are lifted at four or more points with the legs kept vertical, so the unit is not squeezed by angled slings. A one-over-two system hangs two spreader beams under a third; a pod lifting frame does the same in one rigid frame.

Installation cradles hold a long or delicate item, such as a blade or a mast section, along its length and release it in position.

Typical builds

  • Bathroom pod lifting frames
  • One-over-two spreader systems for modules
  • Plant and skid module lifting systems
  • Installation cradles for long items

What we need to quote

Send us the load weight and where its centre of gravity sits, the load's length and width, the positions of its lifting points, the crane hook height and any headroom limit, and the environment the equipment will work in (indoor, outdoor, offshore, hazardous area). A drawing, a 3D model or a photo of the load is the quickest way to start.

How it is made and certified

Engineered below-the-hook equipment is built to order. Your enquiry is reviewed by the maker's design engineers, who issue a general arrangement drawing for your approval before anything is made. Each item is designed to EN 13155, load tested before dispatch and supplied with a declaration of conformity, a test certificate and user instructions. Design calculations, material certificates, NDT records and third-party witnessed testing can be added to the order, and offshore designs to DNV standards are available on request. We confirm the lead time with the quotation.

In service

In service, the equipment gets a pre-use check before every lift and a thorough examination by an approved third party at the interval the site's authority sets: in Abu Dhabi, Code of Practice 34 sets six months for lifting accessories and twelve for lifting equipment, and in Dubai the examination is made by an EIAC-accredited inspection body. Its rated load, identification and test date are marked on it, and the user instructions state how it may and may not be rigged. Our guide to lifting equipment inspection in the UAE sets out the rules emirate by emirate.

Identification

ParameterValue
Product typePod / module lifting system (made to order)
Pattern / standardEN 13155; ASME B30.20 / BTH-1 or DNV offshore design on request

Performance

ParameterValue
Working load limitTo order

Dimensions

ParameterValue
Size rangeBuilt to the module

Construction

ParameterValue
MaterialStructural steel, grade to the design
FinishPaint system to your specification; galvanized for outdoor use on request

Compliance

ParameterValue
CertificationLoad tested before dispatch; declaration of conformity

Supply

ParameterValue
SupplyMade to order from an approved general arrangement drawing
DocumentationGA drawing for approval, declaration of conformity, test certificate, user instructions

Shipping & lead time

Lead TimeContact us for current lead time.

Shipped worldwide from our Dubai warehouse. Transit, routes and documentation for 136 destinations

From the blog

Written about this part

RELATED · OFTEN PAIRED WITH

Engineers viewing this also looked at