Skip to content

Ball Check Valve, Ductile Iron, for Wastewater

Waterworks ValvesEx-stock · delivery in 3 days
Ductile iron ball check valve with bolted top cover, blue epoxy coating and flanged ends
VIEW 01·Ductile iron ball check valve with bolted top cover, blue epoxy coating and flanged ends

Ball check valves for wastewater and sewage pumping: DN32 to DN400, PN10/16 and Class 125/150, rubber-coated ball, no shafts or bushings, full bore, flanged.

Key features

  • Valve type: Check valve, ball, waterworks
  • Construction: Rubber-coated ball, top cover
  • Design standard: EN 12334
  • Size range: DN32 to DN400 (1-1/4" to 16")
  • Pressure class: PN10, PN16; Class 125/150
  • Body material: Ductile iron, cast iron; carbon steel, stainless steel, duplex and super duplex on request
  • End connections: Flanged to EN 1092-2 or ASME B16.1 / B16.5, RF or FF
  • Operation: Self-acting
End connections
Flanged to EN 1092-2 or ASME B16.1 / B16.5, RF or FF
Valve type
Check valve, ball, waterworks
Design standard
EN 12334
Pressure class
PN10, PN16; Class 125/150
Operation
Self-acting
Ships in 24h
Order before 14:00 GST · Jebel Ali
24-month warranty
Manufacturer-backed · genuine parts
Engineering support
A real applications engineer

Product description

The non-return valve for sewage and sludge pumping. A rubber-coated ball rolls out of the flow path when the pump runs and back onto the seat when it stops; with no shaft or bushing there is nothing for rags and fibres to wrap around, and the ball cleans itself as it rotates.

Waterworks valves are built for water: ductile iron bodies coated inside and out with fusion-bonded epoxy, EPDM seals and linings suitable for drinking water, stainless fasteners, and flanges drilled to EN 1092 or ASME so they bolt straight into municipal and industrial pipework.

Construction

  • Rubber-coated ball: the only moving part
  • No shafts or bushings to wear or foul
  • Full-bore flow path, low head loss
  • Top cover for access without removing the valve

Sizes and ratings

Published range: DN32 to DN400 (1-1/4" to 16"), PN10, PN16; Class 125/150, in ductile iron, cast iron; carbon steel, stainless steel, duplex and super duplex on request. End connections: Flanged to EN 1092-2 or ASME B16.1 / B16.5, RF or FF. Operation: self-acting.

Dimensions depend on the size, rating and options chosen; the general arrangement drawing comes with the quotation.

Testing and documents

Shell and seat tests to EN 12266-1 / API 598, with the material certificates and the pressure-test record supplied with the valve. Third-party inspection and extra tests are added when the order specifies them.

Supply

Ball check valves are supplied from Dubai to projects, plants and maintenance teams across the GCC, the wider Middle East and Africa. Most are built to the order specification, so delivery depends on size, class, material and operator. We review the data sheet before quoting and flag anything that needs clarifying, such as a missing pipe schedule or an operator torque that has not been sized.

Related valves

Other waterworks valves in the range, for comparison when the duty is not settled yet: Silent (Nozzle) Check Valve, Ductile Iron, Resilient Axial Flow Check Valve, Ductile Iron, Resilient Dual Plate Check Valve, Wafer, DN50 to DN2000, Double Eccentric Butterfly Valve, Ductile Iron, DN50 to DN4000.

Materials

ParameterValue
Body materialDuctile iron, cast iron; carbon steel, stainless steel, duplex and super duplex on request

Construction

ParameterValue
End connectionsFlanged to EN 1092-2 or ASME B16.1 / B16.5, RF or FF
OperationSelf-acting

Standards

ParameterValue
Pressure testingShell and seat tests to EN 12266-1 / API 598
Design standardEN 12334
Face-to-face / end-to-endEN 558

Identification

ParameterValue
Valve typeCheck valve, ball, waterworks
ConstructionRubber-coated ball, top cover

Range

ParameterValue
Size rangeDN32 to DN400 (1-1/4" to 16")
Pressure classPN10, PN16; Class 125/150

Application

ParameterValue
Typical serviceSewage, sludge and wastewater pumping

Supply

ParameterValue
SupplyBuilt to order and supplied from Dubai with material certificates and the test record

Shipping & lead time

Lead TimeEx-stock from Dubai — delivered within 3 working days in the UAE. Export orders ship on the lane stated for the destination.

Shipped worldwide from our Dubai warehouse. Transit, routes and documentation for 136 destinations

From the blog

Written about this part

RELATED · OFTEN PAIRED WITH

Engineers viewing this also looked at